Differences between revisions 2 and 3
Revision 2 as of 2022-01-28 06:57:36
Size: 3687
Comment:
Revision 3 as of 2022-01-28 07:18:56
Size: 3868
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
   * 2022年3月15日(火)~3月19日(土)@ 岡山大学    * 2022年3月15日(火)~3月19日(土)@ 岡山大学 [[https://onsite.gakkai-web.net/jps/jps_search/2022sp/index.html|program]]
Line 20: Line 20:
 * KAGRA site is heavy snow now
Line 30: Line 30:
  * Washimi-san will present the first result
Line 38: Line 39:
  * BS for ISS, new steering mirror
Line 70: Line 72:
  * PEM installation check
   * Electrical box
   * ACO power supply
Line 74: Line 80:
    * Electrical box

Weekly PEM meeting

Meeting and Conference issue

  • JPS meeting URL

    • 2022年3月15日(火)~3月19日(土)@ 岡山大学 program

      • 2月中旬に現地開催判断?
      • 横澤(Overview)、鈴木(NN)、粂(non-linear ICA)、小林(O3GK ICA)
      • 鷲見(Noise budget, JGW-G2213473)

  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
    • To Kamioka
      • No plan
    • From Kamioka
      • No plan

General issue

  • Tonga volcano
    • Washimi-san will present the first result
    • If you have some idea of science, please let me know
  • Procedure toward X arm commissioning
    • IR cavity lock succeeded
  • IO commissioning
    • IMC ASC
    • New QPD monitor
    • BS for ISS, new steering mirror
  • Mid size baffle installation
    • After IR alignment
  • Y arm commissioning
    • Green Y alignment SR3->ETMY->POS table

    • ETMY alignment done
    • PCal finalize
    • Oplev preparation : ongoing
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

    • Collaborator circulation (~1/7)
  • Invited review paper (Washimi+) JGW-P2113549

  • Acoustic reverberation time paper (Washimi+)
    • Washimi will write in the New Year holidays
  • ICA for E-run/O3GK (Kume, Yokoyama)
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM installation check
    • Electrical box
    • ACO power supply
  • New oplev noise budget
    • EX
    • Main work : Wind, vibration and sound injection FFU on/off
    • Prepare to set the PEMs
      • Accelerometers
      • Seismometer (Move from BS)
      • Magnetometer
      • Microphone
      • PEM injection
  • New PEM
    • PSL room with Cryocon
    • TEAC710
    • 電界計 (EFM; electric field mill)
    • ACO power supply with low frequency
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Investigation of ICA analysis
    • Progress
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Tonga
  • Yokozawa
    • EX oplev noise budget
  • Seismic motion analysis
    • O3GK
    • Microseismic
    • Long term

Place for memo

KAGRA/Subgroups/PEM/Meeting/220128/Agenda (last edited 2022-01-28 16:55:11 by HirotakaYuzurihara)