Weekly PEM meeting
- 2022/04/01(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Report
- Authorlist application
- Deadline 4/8(Fri) 17:00
Tasklist PEM pdf
- 申請に対して疑問等ございましたら横澤・鷲見までご連絡ください。
- Deadline 4/8(Fri) 17:00
Meeting and Conference issue
ILANCE url
- Workshop with CNRS, France and UTokyo
- 4/15(Fri) 17:00-23:00(JST) (Skip PEM meeting??)
- Washimi-san and Yokozawa will participate and have a presentation
GWADW 2022 url
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
Washimi JGWDoc14006 (Submitted)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- Washimi(NAOJ)3/31-4/1
- To Kamioka
General issue
- Procedure toward X arm commissioning
- IR recovery
- Xamr IR lock succeeded over 30 min
- Xend duct shield cooling down
- Set QPD to POP forward
- TCam check
- Script to find the edge of the sapphire mirror
- Mirror position check during cooling down
- IR recovery
- Mid-size baffle
- SR2 completed
- IO commissioning
- IMC will open next week (or Today?)
- Y arm commissioning
- ETMY health check
- Hardware done, software ongoing
- Yarm commissioning
- Green lock succeeded(~1s), need the suspension commissioning
- ITMY suspension health check : ongoing
- Oplev preparation : IY, EY done
- Green laser performance
- ETMY health check
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
Invited review paper (Washimi+) JGW-P2113549
- Under reviewing
- Tonga signal paper (Washimi+)
- Writing
- I would like to open it untill JpGU
- Acoustic reverberation time paper (Washimi+)
- Suspend
- ICA for E-run/O3GK (Kume, Kobayashi)
- Writing
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM installation check
- Electrical box
- Installed to XY end : Done!
- Cabling : Mostly done
ACO power supply : Thanks to technician, Done! pic
- Electrical box
- MN oplev noise investigation
- Light source
- Sent to Toyama university and start investigation
- Temperature dependence
- Environment?
- New oplev noise budget
- EX
- Main work : Wind, vibration and sound injection FFU on/off
- Prepare to set the PEMs
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Kobayashi
- Investigation of ICA analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Take over Kobayashi-san's work
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga analysis
- Yokozawa
- Report of Aoyama gakuin group