⇤ ← Revision 1 as of 2022-04-01 07:03:17
Size: 5256
Comment:
|
Size: 4838
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2022/03/25(Fri) 17:00- | * 2022/04/01(Fri) 17:00- |
Line 7: | Line 7: |
* C2C program request * Deadline 3/28 * LVK Cardiff (September?) * LIGO/Virgo/GEO visiting * Foreign university visiting * Others * 1) participate in the international conferences related GW researches (in Japan and abroad), * 2) stay for the collaboration work in the counter part countries (UK, USA, Australia, Italy, Gernamy, France, China, Korea, Taiwan, India, VIetnam) . * 3) participate KAGRA F2F if it will be held onsite. |
* Authorlist application * Deadline 4/8(Fri) 17:00 * Tasklist PEM [[attachment:authorlisttasklist_PEM.pdf|pdf]] * 申請に対して疑問等ございましたら横澤・鷲見までご連絡ください。 |
Line 30: | Line 26: |
* 緊急セッションの投稿開始は3月を予定しております. | * Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14006|JGWDoc14006]] |
Line 42: | Line 38: |
* No | * Washimi(NAOJ)3/31-4/1 |
Line 47: | Line 43: |
* TMSX commissioning * Trial of the pumping down * Time series check * Glitch check between IMMT1 trans and PRM/IMMT1/IMMT2 |
* IR recovery * Xamr IR lock succeeded over 30 min * Xend duct shield cooling down * Set QPD to POP forward |
Line 53: | Line 49: |
* Report in Yokozawa's part | * Mirror position check during cooling down |
Line 56: | Line 52: |
* SR2/SR3 soon(?) * For installing, we performed the first contact |
* SR2 completed |
Line 60: | Line 55: |
* IMC ASC | * IMC will open next week (or Today?) |
Line 64: | Line 59: |
* This is important bottleneck of schedule * ITMY alignment : Done |
* Hardware done, software ongoing |
Line 69: | Line 63: |
* PCal finalize : Review Yesterday * Oplev preparation : EY done, IY will start * BS alignment |
* Oplev preparation : IY, EY done |
Line 101: | Line 93: |
* New seismometer arrived * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20150|klog20150]] |
Weekly PEM meeting
- 2022/04/01(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Report
- Authorlist application
- Deadline 4/8(Fri) 17:00
Tasklist PEM pdf
- 申請に対して疑問等ございましたら横澤・鷲見までご連絡ください。
- Deadline 4/8(Fri) 17:00
Meeting and Conference issue
ILANCE url
- Workshop with CNRS, France and UTokyo
- 4/15(Fri) 17:00-23:00(JST) (Skip PEM meeting??)
- Washimi-san and Yokozawa will participate and have a presentation
GWADW 2022 url
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
Washimi JGWDoc14006
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- Washimi(NAOJ)3/31-4/1
- To Kamioka
General issue
- Procedure toward X arm commissioning
- IR recovery
- Xamr IR lock succeeded over 30 min
- Xend duct shield cooling down
- Set QPD to POP forward
- TCam check
- Script to find the edge of the sapphire mirror
- Mirror position check during cooling down
- IR recovery
- Mid-size baffle
- SR2 completed
- IO commissioning
- IMC will open next week (or Today?)
- Y arm commissioning
- ETMY health check
- Hardware done, software ongoing
- Yarm commissioning
- Green lock succeeded(~1s), need the suspension commissioning
- ITMY suspension health check : ongoing
- Oplev preparation : IY, EY done
- Green laser performance
- ETMY health check
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
Invited review paper (Washimi+) JGW-P2113549
- Under reviewing
- Tonga signal paper (Washimi+)
- Writing
- meeting with GIF : 3/23 13:00~ @zoom3
- Acoustic reverberation time paper (Washimi+)
- Suspend
- ICA for E-run/O3GK (Kume, Kobayashi)
- Writing
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM installation check
- Electrical box
- Installed to XY end : Done!
- Cabling : Mostly done
ACO power supply : Thanks to technician, Done! pic
- Electrical box
- MN oplev noise investigation
- Light source
- Sent to Toyama university and start investigation
- Temperature dependence
- Environment?
- New oplev noise budget
- EX
- Main work : Wind, vibration and sound injection FFU on/off
- Prepare to set the PEMs
- Accelerometers
- Seismometer (Move from BS)
- Magnetometer
- Microphone
- PEM injection
- Magnetmeters for the Schumann resonance
- Discussing with technicians (AEL, FCL)
- PEM injection
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- Data Quality Report
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Kobayashi
- Investigation of ICA analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Take over Kobayashi-san's work
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga analysis
- Yokozawa
- Report of Aoyama gakuin group