Line 2: Line 2:
 * 2022/03/25(Fri) 17:00-  * 2022/04/01(Fri) 17:00-
Line 7: Line 7:
  * C2C program request
   * Deadline 3/28
    * LVK Cardiff (September?)
    * LIGO/Virgo/GEO visiting
    * Foreign university visiting
    * Others
   * 1) participate in the international conferences related GW researches (in Japan and abroad),
   * 2) stay for the collaboration work in the counter part countries (UK, USA, Australia, Italy, Gernamy, France, China, Korea, Taiwan, India, VIetnam) .
   * 3) participate KAGRA F2F if it will be held onsite.

  * Authorlist application
   * Deadline 4/8(Fri) 17:00
    * Tasklist PEM [[attachment:authorlisttasklist_PEM.pdf|pdf]]
    * 申請に対して疑問等ございましたら横澤・鷲見までご連絡ください。
Line 30: Line 26:
      * 緊急セッションの投稿開始は3月を予定しております.       * Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14006|JGWDoc14006]]
Line 42: Line 38:
    * No     * Washimi(NAOJ)3/31-4/1
Line 47: Line 43:
  * TMSX commissioning
   * Trial of the pumping down
  * Time series check
   * Glitch check between IMMT1 trans and PRM/IMMT1/IMMT2
  * IR recovery
   * Xamr IR lock succeeded over 30 min
   * Xend duct shield cooling down
   * Set QPD to POP forward
Line 53: Line 49:
   * Report in Yokozawa's part    * Mirror position check during cooling down
Line 56: Line 52:
  * SR2/SR3 soon(?)
  * For installing, we performed the first contact
  * SR2 completed
Line 60: Line 55:
  * IMC ASC   * IMC will open next week (or Today?)
Line 64: Line 59:
   * This is important bottleneck of schedule
  * ITMY alignment : Done
   * Hardware done, software ongoing
Line 69: Line 63:
  * PCal finalize : Review Yesterday
  * Oplev preparation : EY done, IY will start
  * BS alignment
  * Oplev preparation : IY, EY done
Line 101: Line 93:

  * New seismometer arrived
   * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20150|klog20150]]

Weekly PEM meeting

Report

  • Authorlist application
    • Deadline 4/8(Fri) 17:00
      • Tasklist PEM pdf

      • 申請に対して疑問等ございましたら横澤・鷲見までご連絡ください。

Meeting and Conference issue

  • ILANCE url

    • Workshop with CNRS, France and UTokyo
    • 4/15(Fri) 17:00-23:00(JST) (Skip PEM meeting??)
    • Washimi-san and Yokozawa will participate and have a presentation
  • GWADW 2022 url

  • JpGU 2022 (日本地球惑星科学連合2022年大会)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
    • To Kamioka
      • No
    • From Kamioka
      • Washimi(NAOJ)3/31-4/1

General issue

  • Procedure toward X arm commissioning
    • IR recovery
      • Xamr IR lock succeeded over 30 min
      • Xend duct shield cooling down
      • Set QPD to POP forward
    • TCam check
      • Script to find the edge of the sapphire mirror
      • Mirror position check during cooling down
  • Mid-size baffle
    • SR2 completed
  • IO commissioning
    • IMC will open next week (or Today?)
  • Y arm commissioning
    • ETMY health check
      • Hardware done, software ongoing
    • Yarm commissioning
      • Green lock succeeded(~1s), need the suspension commissioning
    • ITMY suspension health check : ongoing
    • Oplev preparation : IY, EY done
    • Green laser performance
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

  • Invited review paper (Washimi+) JGW-P2113549

    • Under reviewing
  • Tonga signal paper (Washimi+)
    • Writing
    • meeting with GIF : 3/23 13:00~ @zoom3
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
  • ICA for E-run/O3GK (Kume, Kobayashi)
    • Writing
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM installation check
    • Electrical box
      • Installed to XY end : Done!
      • Cabling : Mostly done
      • ACO power supply : Thanks to technician, Done! pic

  • MN oplev noise investigation
    • Light source
    • Sent to Toyama university and start investigation
      • Temperature dependence
      • Environment?
  • New oplev noise budget
    • EX
    • Main work : Wind, vibration and sound injection FFU on/off
    • Prepare to set the PEMs
      • Accelerometers
      • Seismometer (Move from BS)
      • Magnetometer
      • Microphone
      • PEM injection
  • Magnetmeters for the Schumann resonance
    • Discussing with technicians (AEL, FCL)
  • PEM injection
    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report
    • Data quality evaluation
  • Suzuki
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Kobayashi
    • Investigation of ICA analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Take over Kobayashi-san's work
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Tonga analysis
  • Yokozawa
    • Report of Aoyama gakuin group