Weekly PEM meeting
- 2022/05/20(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- GW astronomy account
- GWADW2022
- VK PEM meeting 2022/05/19
Presentation of yesterday VK PEM meeting pdf
- KAGRA visiting from Virgo
- Virgo visiting from KAGRA
- August and September?
Meeting and Conference issue
GWADW 2022 url
- 5/23 ~ 5/27, online
- Suzuki (Water NN)
- Washimi (Tonga)
- KIW9
- June 6-8 online
- registration deadline May31 2022
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
Washimi JGWDoc14006 (Submitted)
UGAP2022 url
- 6/13-15 @ Tokyo University of Science (Noda)
- Washimi (lightning monitor)
- JPS meeting
- 2022/9/6-8 Okayama
- Registration 6/2
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- Washimi (JpGU, Makuhari)
General issue
- Procedure toward X arm commissioning
- IR recovery
- Glitch with the angle of PRM
- IR recovery
- Mid-size baffle
First contact -> Suspension health check -> Mid size baffle install
PRM -> Done
- Y arm commissioning
- Acceptance check
- Suspension health check IY EY
- Oplev check IY EY
- TCam
- EMSY
- BafflePD
- Baffles
- Vadcuum system
- Vacuum tank cleaning
- Acceptance check
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
出張PEM injection (planning form)
- TAMA300 (later June?)
- TOBA (FY2022?)
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Tonga signal paper (Washimi+)
- Internal seminor : 5/18 or 19
- Plauground data application (KSC board) : until Wednesday May 25th.
- PWT circulation : 5/25
- CPC submission (target) : 5/30
- Journal submission (target) : 6/13
- Micro seismic analysis
- Acoustic reverberation time paper (Washimi+)
- Suspend
- ICA for E-run/O3GK (Kume, Kobayashi)
- Writing
Portable PEMs (Yokozawa+) <<Start writing>>
Preparation for O4
- PEM installation check
- Electrical box
- Installed to XY end : Done!
- Cabling : Mostly done
- Electrical box
- Barometers and infrasound placement underground
- Discuss by Washimi-san later
- Magnetic field underground
- Discuss with Virgo member next week
- Fan, ...
- Magnetmeters for the Schumann resonance
- ADU (Washimi)
- Discussing with technicians (AEL, FCL)
PEM injection (planning form)
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection (I want to start the preparation soon)
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- IMMT1 glitch
- TCam
- Data Quality Report
- Data quality evaluation
- Suzuki
- Poster for GWADW2022
- Water simulation
- Hoshino
- Seismic motion analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Take over Kobayashi-san's work
- Nishizawa
- Magnetic field analysis
- Washimi
- Tonga seminar
- Yokozawa