Line 13: Line 13:
  * Presentation of yesterday VK PEM meeting   * Presentation of yesterday VK PEM meeting [[attachment:VKPEM220519|pdf]]
  * KAGRA visiting from Virgo
  * Virgo visiting from KAGRA
   * August and September?
Line 19: Line 22:
     * Registration Deadline : 15 May 2022
Line 32: Line 34:
  * UGAP2022 [[]https://www.lowbg.org/ugap/ws/am2022/index.html|url]   * UGAP2022 [[https://www.lowbg.org/ugap/ws/am2022/index.html|url]]
    * 6/13-15 @ Tokyo University of Science (Noda)
    * Washimi (lightning monitor)

  * JPS meeting
   * [[https://www.jps.or.jp/activities/meetings/autumn/autumn_index.php|url]]
   * 2022/9/6-8 Okayama
   * Registration 6/2
Line 51: Line 60:
   * IMMT1 IMMT2 ASC using POP forward QPD
   * Finesse measurement
   * Duct shield cooling and mirror position
Line 57: Line 63:
  * PRM ->   * PRM -> Done
Line 60: Line 66:
  * ITMY and ETMY health check
   * Mostly done

 * Yarm commissioning
  * Green lock succeeded(~1s), need the suspension commissioning

 * PCal finalize
  * Cleaning the mirror surface
  * Alignment check
  * Acceptance check
   * Suspension health check IY EY
   * Oplev check IY EY
   * TCam
   * EMSY
   * BafflePD
   * Baffles
   * Vadcuum system
   * Vacuum tank cleaning
   * CryoSystem
Line 84: Line 91:

  * Invited review paper (Washimi+) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13549|JGW-P2113549]]
    * Published
Line 149: Line 153:
  * Poster for GWADW2022
Line 167: Line 172:
  * Tonga analysis
  * Barometer and infrasound measurement at analysis building
  * Tonga seminar
Line 171: Line 175:
  * Yend PCal hammering test [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14049|JGWDoc]]   *

Weekly PEM meeting

General announcement

  • GW astronomy account
  • GWADW2022
  • VK PEM meeting 2022/05/19
    • Presentation of yesterday VK PEM meeting pdf

    • KAGRA visiting from Virgo
    • Virgo visiting from KAGRA
      • August and September?

Meeting and Conference issue

  • GWADW 2022 url

    • 5/23 ~ 5/27, online
    • Suzuki (Water NN)
    • Washimi (Tonga)
  • KIW9
    • June 6-8 online
    • registration deadline May31 2022
  • JpGU 2022 (日本地球惑星科学連合2022年大会)
  • UGAP2022 url

    • 6/13-15 @ Tokyo University of Science (Noda)
    • Washimi (lightning monitor)
  • JPS meeting
    • url

    • 2022/9/6-8 Okayama
    • Registration 6/2
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • No
  • From Kamioka
    • Washimi (JpGU, Makuhari)

General issue

  • Procedure toward X arm commissioning
    • IR recovery
      • Glitch with the angle of PRM
  • Mid-size baffle
    • First contact -> Suspension health check -> Mid size baffle install

    • PRM -> Done

  • Y arm commissioning
    • Acceptance check
      • Suspension health check IY EY
      • Oplev check IY EY
      • TCam
      • EMSY
      • BafflePD
      • Baffles
      • Vadcuum system
      • Vacuum tank cleaning
      • CryoSystem

  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

    • TAMA300 (later June?)
    • TOBA (FY2022?)

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

  • Tonga signal paper (Washimi+)
    • Overleaf, JGW-P2214043

    • Internal seminor : 5/18 or 19
    • Plauground data application (KSC board) : until Wednesday May 25th.
    • PWT circulation : 5/25
    • CPC submission (target) : 5/30
    • Journal submission (target) : 6/13
  • Micro seismic analysis
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
  • ICA for E-run/O3GK (Kume, Kobayashi)
    • Writing
  • Portable PEMs (Yokozawa+) <<Start writing>>

Preparation for O4

  • PEM installation check
    • Electrical box
      • Installed to XY end : Done!
      • Cabling : Mostly done
  • Barometers and infrasound placement underground
    • Discuss by Washimi-san later
  • Magnetic field underground
    • Discuss with Virgo member next week
    • Fan, ...
  • Magnetmeters for the Schumann resonance
    • ADU (Washimi)
    • Discussing with technicians (AEL, FCL)
  • PEM injection (planning form)

    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection (I want to start the preparation soon)
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • IMMT1 glitch
    • TCam
    • Data Quality Report
    • Data quality evaluation
  • Suzuki
    • Poster for GWADW2022
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Take over Kobayashi-san's work
  • Nishizawa
    • Magnetic field analysis
  • Washimi
    • Tonga seminar
  • Yokozawa