Weekly PEM meeting
- 2022/05/27(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Important discussion with ET people
- Magnetic field
- Seismic noise and infrastructure noise
- If you want to join the discussion, please let Yokozawa know.
- Visitting to Virgo site
- By C2C budget
- August? : After KAGRA F2F meeting conflict with vacance?
- September? : After JPS meeting and can join the LVK meeting onsite, concern of the KAGRA schedule.
Meeting and Conference issue
GWADW 2022 url
- 5/23 ~ 5/27, online
- Suzuki (Water NN)
- Washimi (Tonga)
- JpGU 2022 (日本地球惑星科学連合2022年大会)
- 2022年5月22日(日)~6月3日(金) @ 幕張メッセ
緊急セッション「気象津波の発生を伴ったトンガ海底火山噴火」https://www.jpgu.org/meeting_j2022/program.php#late-breaking_session
Washimi JGWDoc14006 (Submitted)
KIW9 url
- June 6-8 online
- registration deadline May31 2022
UGAP2022 url
- 6/13-15 @ Tokyo University of Science (Noda)
- Washimi (lightning monitor)
- KAGRA F2F meeting
- August 1-3
- Hongo campus
- LVK meeting
- 12-15 September
- Cardiff Unviersity, UK
- JPS meeting
- 2022/9/6-8 Okayama
- Registration 6/2
- 日本天文学会
- 9/13-15
- 新潟大学
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- Washimi (UGAP, Noda)
General issue
- Procedure toward X arm commissioning
- Radiation shield cooling Xend
- IM temperature below 200K
- Finesse is not changed
- Radiation shield cooling Xend
- Mid-size baffle
First contact -> Suspension health check -> Mid size baffle install
PRM -> Done
- BS First contact done
- Y arm commissioning
- Pumping down started
- IY 3.8e-3 Pa
- EY 9.3e-4 Pa
- Pumping down started
- Schedule
- PEM schedule
- Re-installation of PEMs toward O4
出張PEM injection (planning form)
- TAMA300 (June 22?)
- TOBA (FY2022?)
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405
- Tonga paper (Washimi+)
- Internal seminor : 5/18
- Plauground data application (KSC board) : Approved from KSC board
- PWT circulation : 5/25
- CPC submission (target) : 5/30
- Journal submission (target) : 6/13
- Micro seismic analysis (Hoshini)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- ICA for E-run/O3GK (Kume, Kobayashi)
- Sibmitted to CPC
Preparation for O4
- Barometers and infrasound placement underground
- Discuss by Washimi-san later
- Magnetic field underground
- Discuss with Virgo member next week
- Fan, ...
- Seismic and infrastructure noise
- Magnetmeters for the Schumann resonance
- ADU (Washimi)
- Discussing with technicians (AEL, FCL)
PEM injection (planning form)
Low-frequency sound injectorklog16829
- Acoustic injection at X/Y-end
- Magnetic injection (I want to start the preparation soon)
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
- IMMT1 glitch
- TCam
- Data Quality Report
- Data quality evaluation
- Suzuki
- Poster for GWADW2022
- Water simulation
- Hoshino
- Seismic motion analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Take over Kobayashi-san's work
- Nishizawa
- Magnetic field analysis
- Washimi
JpGU report JGW-G2214088
- Yokozawa