Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2022-05-27 06:38:46
Size: 5077
Comment:
Revision 7 as of 2022-05-27 16:47:52
Size: 5386
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2022/05/20(Fri) 17:00-  * 2022/05/27(Fri) 17:00-
Line 8: Line 8:
 * GW astronomy account  * Important discussion with ET people
  * Magnetic field
  * Seismic noise and infrastructure noise
  * If you want to join the discussion, please let Yokozawa know.
Line 10: Line 13:
 * GWADW2022
  
 * VK PEM meeting 2022/05/19
  * Presentation of yesterday VK PEM meeting [[attachment:VKPEM220519|pdf]]
  * KAGRA visiting from Virgo
  * Virgo visiting from KAGRA
   * August and September?
 * Visitting to Virgo site
  * By C2C budget
  * August? : After KAGRA F2F meeting conflict with vacance?
  * September? : After JPS meeting and can join the LVK meeting onsite, concern of the KAGRA schedule.
Line 25: Line 25:
  * KIW9
   * June 6-8 online
   * registration deadline May31 2022
Line 34: Line 30:
  * KIW9 [[https://indico.itp.ac.cn/event/123/|url]]
   * June 6-8 online
   * registration deadline May31 2022
Line 37: Line 37:

  * KAGRA F2F meeting
    * August 1-3
    * Hongo campus

  * LVK meeting
    * 12-15 September
    * Cardiff Unviersity, UK
Line 42: Line 50:

  * 日本天文学会
   * 9/13-15
   * 新潟大学
Line 53: Line 65:
    * Washimi (JpGU, Makuhari)     * Washimi (UGAP, Noda)
Line 58: Line 70:
  * IR recovery
   * Glitch with the angle of PRM
  * Radiation shield cooling Xend
   * IM temperature below 200K
   * Finesse is not changed
Line 64: Line 77:
  * BS First contact done
Line 66: Line 80:
  * Acceptance check
   * Suspension health check IY EY
   * Oplev check IY EY
   * TCam
   * EMSY
   * BafflePD
   * Baffles
   * Vadcuum system
   * Vacuum tank cleaning
   * CryoSystem
  * Pumping down started
   * IY 3.8e-3 Pa
   * EY 9.3e-4 Pa
Line 84: Line 91:
    * TAMA300 (later June?)     * TAMA300 (June 22?)
Line 92: Line 99:
  * Tonga signal paper (Washimi+)   * Tonga paper (Washimi+)
Line 94: Line 101:
    * Internal seminor : 5/18 or 19
    * Plauground data application (KSC board) : until Wednesday May 25th.
    * Internal seminor : 5/18
    * Plauground data application (KSC board) : Approved from KSC board
Line 101: Line 108:
  * Micro seismic analysis   * Micro seismic analysis (Hoshini)
   * writing
Line 105: Line 113:
    * Re-measurement before O4?
Line 107: Line 116:
   * Writing

  * Portable PEMs (Yokozawa+) '''<<Start writing>>'''
   * Sibmitted to CPC
Line 113: Line 120:
  * PEM installation check
   * Electrical box
    * Installed to XY end : Done!
    * Cabling : Mostly done
 * Barometers and infrasound placement underground
  * Discuss by Washimi-san later
  
 * Magnetic field underground
  * Discuss with Virgo member next week
  * Fan, ...
Line 118: Line 127:
  * Barometers and infrasound placement underground
   * Discuss by Washimi-san later
  
  * Magnetic field underground
   * Discuss with Virgo member next week
   * Fan, ...
 * Seismic and infrastructure noise
Line 125: Line 129:
  * Magnetmeters for the Schumann resonance
   * ADU (Washimi)
  * Discussing with technicians (AEL, FCL)
 * Magnetmeters for the Schumann resonance
  * ADU (Washimi)
  * Discussing with technicians (AEL, FCL)
Line 129: Line 133:
  * PEM injection ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14016|planning form]])
  * Low-frequency sound injector[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16829|klog16829]]
   * Acoustic injection at X/Y-end
  * Magnetic injection (I want to start the preparation soon)
 * PEM injection ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14016|planning form]])
  * Low-frequency sound injector[[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16829|klog16829]]
  * Acoustic injection at X/Y-end
  * Magnetic injection (I want to start the preparation soon)
Line 135: Line 139:
  * RF monitor with mokugo
   * Tiltmeter
  * RI detector
  * Newtonian noise
  * RF monitor with mokugo
  * Tiltmeter
  * RI detector
  * Newtonian noise
Line 172: Line 176:
  * Tonga seminar   * JpGU report [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14088|JGW-G2214088]]

Weekly PEM meeting

General announcement

  • Important discussion with ET people
    • Magnetic field
    • Seismic noise and infrastructure noise
    • If you want to join the discussion, please let Yokozawa know.
  • Visitting to Virgo site
    • By C2C budget
    • August? : After KAGRA F2F meeting conflict with vacance?
    • September? : After JPS meeting and can join the LVK meeting onsite, concern of the KAGRA schedule.

Meeting and Conference issue

  • GWADW 2022 url

    • 5/23 ~ 5/27, online
    • Suzuki (Water NN)
    • Washimi (Tonga)
  • JpGU 2022 (日本地球惑星科学連合2022年大会)
  • KIW9 url

    • June 6-8 online
    • registration deadline May31 2022
  • UGAP2022 url

    • 6/13-15 @ Tokyo University of Science (Noda)
    • Washimi (lightning monitor)
  • KAGRA F2F meeting
    • August 1-3
    • Hongo campus
  • LVK meeting
    • 12-15 September
    • Cardiff Unviersity, UK
  • JPS meeting
    • url

    • 2022/9/6-8 Okayama
    • Registration 6/2
  • 日本天文学会
    • 9/13-15
    • 新潟大学
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • No
  • From Kamioka
    • Washimi (UGAP, Noda)

General issue

  • Procedure toward X arm commissioning
    • Radiation shield cooling Xend
      • IM temperature below 200K
      • Finesse is not changed
  • Mid-size baffle
    • First contact -> Suspension health check -> Mid size baffle install

    • PRM -> Done

    • BS First contact done
  • Y arm commissioning
    • Pumping down started
      • IY 3.8e-3 Pa
      • EY 9.3e-4 Pa
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

    • TAMA300 (June 22?)
    • TOBA (FY2022?)

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

  • Tonga paper (Washimi+)
    • Overleaf, JGW-P2214043

    • Internal seminor : 5/18
    • Plauground data application (KSC board) : Approved from KSC board
    • PWT circulation : 5/25
    • CPC submission (target) : 5/30
    • Journal submission (target) : 6/13
  • Micro seismic analysis (Hoshini)
    • writing
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
    • Re-measurement before O4?
  • ICA for E-run/O3GK (Kume, Kobayashi)
    • Sibmitted to CPC

Preparation for O4

  • Barometers and infrasound placement underground
    • Discuss by Washimi-san later
  • Magnetic field underground
    • Discuss with Virgo member next week
    • Fan, ...
  • Seismic and infrastructure noise
  • Magnetmeters for the Schumann resonance
    • ADU (Washimi)
    • Discussing with technicians (AEL, FCL)
  • PEM injection (planning form)

    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection (I want to start the preparation soon)
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • IMMT1 glitch
    • TCam
    • Data Quality Report
    • Data quality evaluation
  • Suzuki
    • Poster for GWADW2022
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Take over Kobayashi-san's work
  • Nishizawa
    • Magnetic field analysis
  • Washimi
  • Yokozawa

Place for memo

KAGRA/Subgroups/PEM/Meeting/220527/Agenda (last edited 2022-05-27 17:00:27 by tatsuki.washimi)