Differences between revisions 5 and 6
Revision 5 as of 2022-05-27 13:14:50
Size: 5247
Comment:
Revision 6 as of 2022-05-27 16:44:25
Size: 5339
Comment:
Deletions are marked like this. Additions are marked like this.
Line 65: Line 65:
    * Washimi (JpGU, Makuhari)     * Washimi (UGAP, Chiba)
Line 174: Line 174:
  * Tonga seminar   * JpGU report [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14088|JGW-G2214088]]

Weekly PEM meeting

General announcement

  • Important discussion with ET people
    • Magnetic field
    • Seismic noise and infrastructure noise
    • If you want to join the discussion, please let Yokozawa know.
  • Visitting to Virgo site
    • By C2C budget
    • August? : After KAGRA F2F meeting conflict with vacance?
    • September? : After JPS meeting and can join the LVK meeting onsite, concern of the KAGRA schedule.

Meeting and Conference issue

  • GWADW 2022 url

    • 5/23 ~ 5/27, online
    • Suzuki (Water NN)
    • Washimi (Tonga)
  • JpGU 2022 (日本地球惑星科学連合2022年大会)
  • KIW9 url

    • June 6-8 online
    • registration deadline May31 2022
  • UGAP2022 url

    • 6/13-15 @ Tokyo University of Science (Noda)
    • Washimi (lightning monitor)
  • KAGRA F2F meeting
    • August 1-3
    • Hongo campus
  • LVK meeting
    • 12-15 September
    • Cardiff Unviersity, UK
  • JPS meeting
    • url

    • 2022/9/6-8 Okayama
    • Registration 6/2
  • 日本天文学会
    • 9/13-15
    • 新潟大学
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • Depending on the situation of COVID-19
  • To Kamioka
    • No
  • From Kamioka
    • Washimi (UGAP, Chiba)

General issue

  • Procedure toward X arm commissioning
    • Radiation shield cooling Xend
      • IM temperature below 200K
      • Finesse is not changed
  • Mid-size baffle
    • First contact -> Suspension health check -> Mid size baffle install

    • PRM -> Done

    • BS First contact done
  • Y arm commissioning
    • Pumping down started
      • IY 3.8e-3 Pa
      • EY 9.3e-4 Pa
  • Schedule
  • PEM schedule
    • Re-installation of PEMs toward O4
  • 出張PEM injection (planning form)

    • TAMA300 (later June?)
    • TOBA (FY2022?)

Jurnal paper issue

Details are here!

  • PTEP (2) : noise budget(K.Yamamoto, Kokeyama, Washimi) JGW-P2113405

  • Tonga signal paper (Washimi+)
    • Overleaf, JGW-P2214043

    • Internal seminor : 5/18 or 19
    • Plauground data application (KSC board) : until Wednesday May 25th.
    • PWT circulation : 5/25
    • CPC submission (target) : 5/30
    • Journal submission (target) : 6/13
  • Micro seismic analysis
  • Acoustic reverberation time paper (Washimi+)
    • Suspend
  • ICA for E-run/O3GK (Kume, Kobayashi)
    • Writing

Preparation for O4

  • Barometers and infrasound placement underground
    • Discuss by Washimi-san later
  • Magnetic field underground
    • Discuss with Virgo member next week
    • Fan, ...
  • Seismic and infrastructure noise
  • Magnetmeters for the Schumann resonance
    • ADU (Washimi)
    • Discussing with technicians (AEL, FCL)
  • PEM injection (planning form)

    • Low-frequency sound injectorklog16829

    • Acoustic injection at X/Y-end
    • Magnetic injection (I want to start the preparation soon)
  • After O4
    • RF monitor with mokugo
    • Tiltmeter
    • RI detector
    • Newtonian noise
  • Discussion with DET members
    • Daily summary page PEM

Progress report

  • Yuzurihara
    • Pastavi
    • IMMT1 glitch
    • TCam
    • Data Quality Report
    • Data quality evaluation
  • Suzuki
    • Poster for GWADW2022
    • Water simulation
  • Hoshino
    • Seismic motion analysis
  • Kume
    • Report of paper progress
  • Fukunaga
    • Schumann resonance
  • Kiyota
    • Take over Kobayashi-san's work
  • Nishizawa
    • Magnetic field analysis
  • Washimi
  • Yokozawa

Place for memo

KAGRA/Subgroups/PEM/Meeting/220527/Agenda (last edited 2022-05-27 17:00:27 by tatsuki.washimi)