Weekly PEM meeting
- 2023/02/03(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
- SEO budget
- For maintenance, observation and toward O5
Meeting and Conference issue
- JPS meeting (Online)
- Registration : Finished
- Washimi(Schumann resonance)
- Fulunaga(Schumann resonance)
- Miyamoto(Weather)
- Registration : Finished
- LVK meeting
- 13 - 16 Mar
- ILANCE conference
- 27 - 30 Mar
- Kyoto University
- GWADW 2023
- 21 - 27 May, Elba, Italy
- One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
- The 3rd generation can be a large topics because ET is now proceeding.
- LVK Meeting
- 11 - 14 Sep.
- Toyama, Japan
- 10th KIW
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Miyamoto (2/12-18)
- From Kamioka
- No
General issue
- Site work
- 1/30 - 2/3 Repair the leak at OMC area : Done
- PLL with new laser : Done
- PRFPMI lock trial
- PRFPMI with AS17 + XY IR TRANS(TRAS) was succeeded
- MICH, PRCL control optimization
- Suspension commissioning
- DC readout with OMC
- Bottle neck is the noise level of ALS
- If Microseismic motion large, the pick of mirror may fluctuate a lot
- They are on the suspension table at PR2 and SR2
- Implementation of the PNC(Phase Noise Cancellation) to reduce the 0.4Hz resonant peak
- If Microseismic motion large, the pick of mirror may fluctuate a lot
- PRFPMI with AS17 + XY IR TRANS(TRAS) was succeeded
- ASC implementation
- Evaluate offset map
- Trial of the implementation of the ASC loop
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Playground application
Preparation for O4
- Investigation of the PEM injection is just started
- Preparing the function generator
- Portable acoustic injection done
- Testing the remote control
- Acoustic injection preparation
- Magnetic injection
- After O4a?
- Preparing the function generator
- Finalize the PEM installation
- Accelerometer to C chamber and TMS table
- Microphone to C chamber
- Do we need both booth and field?
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- We made the PEM channel
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- VK mag
- SEM update
- Microseismic
- Yokozawa
- Preparation for acoustic injection