Weekly PEM meeting
- 2023/02/10(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
- SEO budget
- For maintenance, observation and toward O5
Meeting and Conference issue
- JPS meeting (Online)
- Registration : Finished
- Washimi(Schumann resonance)
- Fukunaga(Schumann resonance)
- Miyamoto(Weather)
- Registration : Finished
- ICRC 2023
- Nagoya
- Deadline abstract submission 20th Feb(?)
- 電離層とシューマン共振スペクトルの時間変動
- 2/21(Tue) 16:00-
- LVK meeting
- 13 - 16 Mar
- ILANCE conference
- 27 - 30 Mar
- Kyoto University
- GWADW 2023
- 21 - 27 May, Elba, Italy
- One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
- The 3rd generation can be a large topics because ET is now proceeding.
- LVK Meeting
- 11 - 14 Sep.
- Toyama, Japan
- 10th KIW
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Miyamoto (2/12-18)
- Fukunaga (2/20-2/24)
- From Kamioka
- No
General issue
- PRFPMI with AS17 + OMC DC readout done
- 1.2 W output from IMC (7 W when O3GK)
- Roll off the MICH and PRCL control
- Same feed forward for MICH and PRCL from O3GK
- Future work
- Check the scattering light
- Improve the suspension control
- Alignment sensing and control
- Interferometer characterization
- Increased the laser power
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Playground application
Preparation for O4
- Investigation of the PEM injection is just started
- Acoustic injection preparation
- Portable + SR3 PEM system recovery
- Magnetic injection
- After O4a?
- Acoustic injection preparation
- Finalize the PEM installation
- Accelerometer to C chamber and TMS table
- Microphone to C chamber
- Do we need both booth and field?
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- We made the PEM channel
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- VK mag
- SEM update
- Microseismic
- Yokozawa
- Morning interferometer work