Weekly PEM meeting
- 2023/03/24(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- 2022年度、PEM groupはたくさんの成果を残すことができました。ありがとうございます。2023年度もよろしくお願いします。
- KAGRA visiting plan
- Now, the budget of KAGRA is limiting, but if you want to visit Kamioka, please contact to Yokozawa
- RRT shift
Meeting and Conference issue
- JPS meeting (Online)
- Washimi(Schumann resonance)
- Fukunaga(Schumann resonance)
- Miyamoto(Weather)
- ICRC 2023
- Nagoya
- Deadline 2/20
- Yokozawa will present about KAGRA PEM
- LVK meeting
- 13 - 16 Mar
- ILANCE conference
- 27 - 30 Mar
- Kyoto University
- GWADW 2023
- 21 - 27 May, Elba, Italy
- One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
- The 3rd generation can be a large topics because ET is now proceeding.
- 10th KIW
- 29,30th May
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- No
- From Kamioka
- No
General issue
- PRFPMI locked
- 1.2 W output from IMC (7 W when O3GK)
- Best ~0.9 Mpc
- Several morning silent run
- Activities this week
- ISS servo investigation
- ASC using wave front sensors and ADS, BPC and so on
- Tapping test POP/PSL
- MICH and PRCL feed forward implementation
- More tuning will be performed
- Suspension sensing noise
- Peak suppression
- (Future) Interferometer characterization
- Increasing the power at REFL table
- MICH controls investigation
- POP table to REFL table
- Simulation
- Alignment sensing and controls
- Control filter optimization
- Suspension control
- Now evaluating the suspension control noise
- Increased the laser power
- 1.2 W output from IMC (7 W when O3GK)
出張PEM injection (planning form)
Jurnal paper issue
- ICA for E-run/O3GK (Kume, Kobayashi)
- Published
- Micro seismic analysis (Hoshino)
- writing
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Referee comments
Preparation for O4
- Discussion of the portable PEM channels
- Still under investigation with the results of the tapping test
- Finalize the PEM installation
- Accelerometer to C chamber and TMS table (Maybe postpone after O4a, lower priority)
- Microphone to C chamber (Maybe postpone after O4a, lower priority)
- Investigation of the PEM injection is just started
- Tapping test is higher priority
- Acoustic injection preparation
- Output sound smaller compared from O3GK's
- Magnetic injection
- After O4a?
- Voltmeter preparation
- We made the PEM channel
- K1:PEM-VOLT_{PSL,IMCREFL,REFL,ISS,AS}_TABLE_{GND,FLOAT,DIFF}
- K1:PEM-VOLT_OMC_CHAMBER_{GND,FLOAT,DIFF}
- AC power monitoring
- Bought transreducer
- Prepared
- DC power monitoring
- Arrived at Kamioka
- We made the PEM channel
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Suzuki
- Water simulation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Kume
- Report of paper progress
- Fukunaga
- Schumann resonance
- Kiyota
- Power line noise investigation
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Yokozawa
- Morning silent run
- Clean up portable PEMs