Weekly PEM meeting
- 2023/05/26(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- O4a run started from 24th May
- 4 weeks run it will finish 21st June
- SEO budget to PEM is limiting
- KAGRA visiting plan
- If you want to visit Kamioka, please contact to Yokozawa
- Kiban S application
- 高精度レーザーひずみ計観測網の広域展開による地殻活動の時空間マルチスケール観測
- Yokozawa and Washimi would be co-investigator, about KAGRA environment and strain-mater
Meeting and Conference issue
- GWADW 2023
- 21 - 27 May, Elba, Italy
- One day could be the day for "KAGRA commissioning support" and "experiences/results in KAGRA" presentation
- The 3rd generation can be a large topics because ET is now proceeding.
- 10th KIW
- 29,30th May
- Washimi (SOC)
- Hoshino
ICRC 2023 url
- Nagoya
- Deadline 2/20
- Yokozawa will present about KAGRA PEM (oral)
- Washimi will present about Schumann resonance and SGWB
- JPS meeting (Tohoku U)
- Start the abstract submission
- Abstract submission limit : 7th June, 14:00(JST)
- Presentation about PEM
- Yokozawa (Status(?))
- Washimi (Noise hunting(?))
- Other speaker?
- Start the abstract submission
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Hoshino(planned)
- From Kamioka
- Washimi (KIW)
General issue
- Status
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submit to CPC soon
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Referee comments
Preparation for O4
- Check the seismic motion around mozumi area
- After Washimi-san back to Japan
- Daytime ground motion
- Start the O4a observation
- Fixed the PRMs
- No portable PEMs
- Investigation of the PEM injection
- Magnetic injection
- After O4a?
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Takatani
- Calculation of Schumann resonance
- Kume
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
PEM injection sumnmary KAGRA/Subgroups/PEM/PEMinjection/O4
- Street view
- Yokozawa
- PR3 oplev