Weekly PEM meeting
- 2023/06/16(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- O4a run started from 24th May
- 4 weeks run it will finish 21st June 8:00(JST)
- KAGRA visiting plan
- If you want to visit Kamioka, please contact to Yokozawa
- Kiban S application
- 高精度レーザーひずみ計観測網の広域展開による地殻活動の時空間マルチスケール観測
- Yokozawa and Washimi would be co-investigator, about KAGRA environment and strain-mater
Meeting and Conference issue
ICRC 2023 url
- Nagoya
- Yokozawa will present about KAGRA PEM (oral)
- Washimi will present about Schumann resonance and SGWB
- LVK meeting at Toyama
- 11-14 September 2023
- F2F meeting during this meeting(?)
- JPS meeting (Tohoku U)
- 16-19 September 2023
- Presentation about PEM
- Yokozawa (Status)
- Washimi (Noise hunting)
- Hoshino (Seismic forecast)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- Depending on the situation of COVID-19
- To Kamioka
- Hoshino(planned)
- From Kamioka
- No
General issue
- Status
- Schedule after O4a
- CAL/DET week (1 week)
- Calibration measurement
- Remaining measurement for O4a
- Switch to high power laser (1-2 week)
- Check the sensitivity
- Turned off and on the cryocooler (1 week)
- Same timing with switch high power laser
- IX, IY, EY. Not perform EX
- Open the OMC chamber (1 week)
- Treatment the ghost beam
- Commissioning toward 10 Mpc
- CAL/DET week (1 week)
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submit to CQG soon
- Acoustic reverberation time paper (Washimi+)
- Suspend
- Re-measurement before O4?
- Tonga GIF paper
- Accepted
Preparation for O4
- Check the seismic motion around mozumi area
- Daytime ground motion
- Schumann resonance measurement
- Start the O4a observation
- Fixed the PRMs
PEM working check klog25527
- Investigation of the PEM injection
- Magnetic injection
- After O4a?
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
- After O4
- RF monitor with mokugo
- Tiltmeter
- RI detector
- Newtonian noise
- Discussion with DET members
- Daily summary page PEM
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysid
- Miyamoto
- Weather analysis
- Takatani
- Calculation of Schumann resonance
- Kume
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Noise O4a
- Yokozawa
- PEM check during O4a
- Lock loss study O4a