Weekly PEM meeting
- 2023/06/23(Fri) 17:00-
 - Regular meeting
 Zoom2 : https://zoom.us/j/6676627462
General announcement
- O4a run finished successfully  
- 4 weeks run has been finished on 21st June 8:00(JST)
 - CAL/DET week now
 
 - KAGRA visiting plan 
- If you want to visit Kamioka, please contact to Yokozawa
 
 
Meeting and Conference issue
ICRC 2023 url 7/26 - 8/3
- Nagoya
 - Yokozawa will present about KAGRA PEM (oral)
 - Washimi will present about Schumann resonance and SGWB (oral)
 
- LVK meeting at Toyama 
- 11-14 September 2023
 
 - KAGRA F2F meeting on Sep. 15
 - JPS meeting (Tohoku U) 
- 16-19 September 2023
 - Presentation about PEM 
- Yokozawa (Status)
 - Washimi (Noise hunting)
 - Hoshino (Seismic forecast)
 
 
 Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka 
- Hoshino(planned)
 
 - From Kamioka 
- No
 
 
General issue
- Status  
Sensitivity 1.1~1.4 Mpc latest
Summary url
- CAL/DET week 
- Calibration measurement done : No significant change from previous measurement
 - Some additional measurement toward O4b Saturday
 
 - Noise budget measurement 
- Interferometer (MICH, PRCL, ISS, CARM, ...)
 - Suspensions
 - PEMs
 - etc.
 
 - IPC glitch 
- The rate didn't change
 - Need to investigate the reason
 
 - Lock loss investigation 
- Ongoing
 
 
 - Schedule after O4a 
- CAL/DET week (1 week) 
- Calibration measurement
 - Remaining measurement for O4a
 
 - Switch to high power laser (1-2 week) 
- Check the sensitivity
 
 - Turned off and on the cryocooler (1 week) 
- Same timing with switch high power laser
 - IX, IY, EY. Not perform EX
 
 - Open the OMC chamber (1 week) 
- Set the geophone inside the chamber and evaluate the vibration
 - Treatment the ghost beam
 
 - Commissioning toward 10 Mpc
 
 - CAL/DET week (1 week) 
 出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino) 
- Submited to CQG
 
 - Acoustic reverberation time paper (Washimi+, Sato?)  
- Suspend
 - Re-measurement before O4?
 
 - Tonga GIF paper 
- Published
 
 - TCam paper  
- Writing ongoing
 
 
Preparation for O4b
- Check the seismic motion around mozumi area 
- Daytime ground motion
 - It may appeared in DARM sensitivity (SR3?)
 
 - Schumann resonance measurement 
- Ongoing
 
 - Acoustic injection post O4a 
- OMC  
Portable PEM reinstallation klog25673
 - PSL room 
- Next week?
 
 - TMSX/TMSY 
- Prepared today
 
 - SR3 
- If we have a time
 
 - other area? 
- Any idea?
 
 
 - OMC  
 - Investigation of the PEM injection 
- Magnetic injection  
- After O4a?
 
 
 - Magnetic injection  
 - Voltmeter preparation 
- AC power monitor installation
 - DC power monitor installation
 
 - After O4  
- RF monitor with mokugo
 - Tiltmeter
 - RI detector
 - Newtonian noise
 
 - Discussion with DET members 
- Daily summary page PEM
 
 
Progress report
- Yuzurihara 
- Pastavi
 Data Quality Report slide
- Data quality evaluation
 
 - Hoshino 
- Seismic motion analysis
 
 - Sato 
- Sound source analysid
 
 - Miyamoto 
- Weather analysis
 
 - Takatani 
- Applying the deepclean
 - Calculation of Schumann resonance
 
 - Kume 
PR3 line injection klog25670
- Noise subtraction
 
 - Nishizawa 
- Water newtonian noise
 - Magnetic field analysis
 
 - Washimi  
Schumann resonance study JGW-G2315046
 - Yokozawa  
- Lock loss study O4a
 - Preparing for the acoustic injection in both end
 
 
