Weekly PEM meeting
- 2023/12/01(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Kamioka visiting plan
- Yokozawa and Washimi-san have several budgets (共同利用)
- So we want to call not only PEM members but also KAGRA members who are interested in onsite.
- If you want to visit Kamioka, please contact Yokozawa
- O4b
- Break : mid-January - mid-March, 2024
- Virgo : will join in March
- KAGRA : Three-month observation around here
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
- VK PEM meeting
- 2023/12/21(Thu) 19:00-(JST), 10:00-(UTC), 11:00- (CET)
- ET SCB/SPB/ANM workshop @ Nikhef, December 6-7
- Washimi will attend in person
- satellite meeting before/after the workshop?
- discussing with poland group
- KAGRA F2F @ Hongo, 12/14-15
- The registration deadline is on November 27 (Mon) at 24:00 JST.
- Students who are writing their thesis with KAGRA data need to report it in the F2F.
DeepClean meeting on 12/13 15:00-
- Annouce later
- JPS (online) 2024/3/18-21
https://www.jps.or.jp/activities/meetings/spring/spring_index.php
- 一般講演申込(※早期参加登録/概要集申込、原稿送信含む) 11月21日(9時)〜12月6日(14時)
- Hoshino (Earthquake)
- Sato? (Sound)
- Miyamoto (weather)
- Takatani? (Noise subtraction)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Miyamoto(- 12/8)
- From Kamioka
- 12/2-10 Washimi (Nikhef@Amsteldam)
12/13-15 YokozaWashimi (F2F@Hongo)
General issue
- Cooling down
- EX : Radiation shield cooling down : 87 K
- EY : Started the cooling down duct shield
- 273 K
- IX, IY ongoing : about 85-87 K in IM
Temperature change url
- After starting the cooling down after measuring the Q-value of sapphire fiber
- Interferometer operation
- PRFPMI DC readout Succeeded :
- Several Alignment sensing and control
- Reducing the RMS of DARM (Deducing the fluctuation of suspension)
- Treatment for large micro-seismic
- Q value measurement
- Mirror Q value measurement at IX
- Suspension (violin) Q value measurement
- New IP control
- Ongoing
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to Physica Scripta
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- PEM maintenance
- Checked the response for CS PEMs
- Status of IX and IY PEMs
- Prepared the TMSX and TMSY ACC and MIC
- PEM installation
- Start planning
- Evaluation of newtonian noise
- Anoop and Washimi
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Noise subtraction with machine learning
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Magnetic field analysis
- Barometer
- Yokozawa
- About OMC area