Weekly PEM meeting
- 2023/12/22(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- 2023年も大変お世話になりました。
- PEM subsystemは今年もたくさんの結果を残すことができました。ありがとうございます。
- 2024年もよろしくお願いします。
- Kamioka visiting plan
- Yokozawa and Washimi-san have several budgets (共同利用)
- So we want to call not only PEM members but also KAGRA members who are interested in onsite.
- If you want to visit Kamioka, please contact Yokozawa
Hoshino & Sato will stai Kamioka on February (3weeks?)
- Yokozawa and Washimi-san have several budgets (共同利用)
- O4b
- Break : mid-January - mid-March, 2024
- Virgo : will join in March
- KAGRA : Three-month observation around here
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
- VK PEM meeting (Postponed)
- 2023/12/21(Thu) 19:00-(JST), 10:00-(UTC), 11:00- (CET)
- January next year.
- ET SCB/SPB/ANM workshop @ Nikhef, December 6-7
- Washimi attended in person
- KAGRA F2F @ Hongo, 12/14-15
- The registration deadline is on November 27 (Mon) at 24:00 JST.
- Students who are writing their thesis with KAGRA data need to report it in the F2F.
DeepClean meeting on 12/13 15:00-
- Annouce later
- LBGT@Tokokoku
- workshop of underground experiments
- Washimi will have a presentation of rain, snow, underground water
- Miyamoto-kun will have a poster presentation.
- JPS (online) 2024/3/18-21
https://www.jps.or.jp/activities/meetings/spring/spring_index.php
- 一般講演申込(※早期参加登録/概要集申込、原稿送信含む)
- Hoshino (Earthquake)
- Miyamoto (weather)
- Sato (Sound)
- Takatani (Noise subtraction)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Hoshino (February?)
- Sato (Febryary?)
- From Kamioka
- No plan
General issue
Strategy (JGWDoc15522)
- Cooling down
- IX,EX,EY : Radiation shield cooling down : 84-88 K
- EY : Started the cooling down duct shield
- 200 K
Temperature change url
- After starting the cooling down after measuring the Q-value of sapphire fiber
- Interferometer operation
- PRFPMI DC readout Succeeded
- Need to reuducing the DARM RMS to be stable operation
- Resonant frequency measurement
- Wideband ASC
- Treatment for large micro-seismic
- Need to reuducing the DARM RMS to be stable operation
- Initial alignment procedure
- Touch the alignment of GRX and GRY
- PRFPMI DC readout Succeeded
- Q value measurement
- Mirror Q value measurement at IX, EX, EY
Current summary : JGWDoc15445
- Suspension (violin) Q value measurement
- Mirror Q value measurement at IX, EX, EY
- New IP control
- Ongoing
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to Physica Scripta
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Snow monitor
- Ongoing
- PEM installation
- Waiting the timing of TMSX and TMSY
- Evaluation of newtonian noise
- Anoop and Washimi
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Noise subtraction with machine learning
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Magnetic field analysis
- Snow monitor
- Yokozawa
- Noise budget in current IFO