Weekly PEM meeting
- 2024/01/12(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- 新年明けましておめでとうございます。
- 2024年もよろしくお願いします。
- Kamioka visiting plan
- Yokozawa and Washimi-san have several budgets (共同利用)
- So we want to call not only PEM members but also KAGRA members who are interested in onsite.
- If you want to visit Kamioka, please contact Yokozawa
Hoshino & Sato will stai Kamioka on February (3weeks?)
- Yokozawa and Washimi-san have several budgets (共同利用)
- O4b
- Break : mid-January - mid-March, 2024
- Virgo : will join in March
- KAGRA : Three-month observation around here
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
- VK PEM meeting (Postponed)
- 2024/01/18(Thu) 19:00-(JST), 10:00-(UTC), 11:00- (CET)
- LBGT@Yokokoku
- workshop of underground experiments
- Washimi will have a presentation of rain, snow, underground water
- Miyamoto-kun will have a poster presentation.
- JPS (online) 2024/3/18-21
https://www.jps.or.jp/activities/meetings/spring/spring_index.php
- 一般講演申込(※早期参加登録/概要集申込、原稿送信含む)
- Hoshino (Earthquake)
- Miyamoto (weather)
- Sato (Sound)
- Takatani (Noise subtraction)
- UGAP2024 @ Tohoku U 2024/3/4~6
- international conference of underground experiments
- Washimi will have a presentation of lightnings and thunders
- 第4回新学術「地下宇宙」若手研究会 @ Tohoku U 2024/3/7~8
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel (except for conferences)
- To Kamioka
- Hoshino (February?)
- Sato (Febryary?)
- From Kamioka
- No plan
General issue
- Effect of earthquake
- Noto earthquake at 1/1
- IMC : Need open in near future
- Suspension health check, vacuum check, and so on
- Other suspensions:
- Type-C : IMMT1,2 OMMT1,2, OSTM health check ongoing
- TYpe-Bp : Serious drift, check one by one, there are possibility to open the whole area
- Type-B : No serious damage achieve LOCK_ACQUISITION, start health check soon
- Type-A : Several drifting in MN oplev when we align with TM, but achive LOCK_AQCUISITION
- Cooling down
- IX,EX,EY : Radiation shield cooling down : 84-88 K
- EY : Started the cooling down duct shield
- 98 K
Temperature change url
- After starting the cooling down after measuring the Q-value of sapphire fiber
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submited to Physica Scripta
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
- TCam paper
- Writing ongoing
Preparation for O4b
- Snow monitor
- Ongoing
- First snow detected
- PEM installation
- Waiting the timing of TMSX and TMSY
- Evaluation of newtonian noise
- Anoop and Washimi
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Noise subtraction with machine learning
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Snow monitor
- Signals from the Noto earthquake and tsunami
- Yokozawa
- Recovery of suspensions
- Noise budget in current IFO