Line 2: Line 2:
 * 2024/01/05(Fri) 17:00-  * 2024/01/12(Fri) 17:00-
Line 68: Line 68:
   * Instruments and facility : no serious damage
   * IMC alignment : need more investigation
    * Alignment of Type-C suspension
   * IMC : Need open in near future
    * Suspension health check, vacuum check, and so on
   * Other suspensions:
    * Type-C : IMMT1,2 OMMT1,2, OSTM health check ongoing
    * TYpe-Bp : Serious drift, check one by one, there are possibility to open the whole area
    * Type-B : No serious damage achieve LOCK_ACQUISITION, start health check soon
    * Type-A : Several drifting in MN oplev when we align with TM, but achive LOCK_AQCUISITION
Line 76: Line 80:
    * 120 K     * 98 K
Line 81: Line 85:
  * Interferometer operation
   * PRFPMI DC readout Succeeded
    * Need to reuducing the DARM RMS to be stable operation
     * 10 Hz noise hunting
      * Current sensitivity curve around 10 Hz is worse compared from O4a (Similar level of O3GK)
      * Some coherence with voltage monitor

  * Q value measurement
   * Mirror Q value measurement at IX, EX, EY
    * Current summary : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15445|JGWDoc15445]]
   * Suspension (violin) Q value measurement

  * New IP control
   * Ongoing
  
Line 121: Line 110:
  * First snow detected
Line 164: Line 154:
  * Automation of the Schumann resonance monitoring
Line 166: Line 155:
    * Seismometers : saturated (https://klog.icrr.u-tokyo.ac.jp/osl/?r=28153)
    * Accelerometers : Clearly obsurved (https://klog.icrr.u-tokyo.ac.jp/osl/?r=28155)
    * Infrasound/Microphones : Tsunami signal was detected at Mozumi outside. Underground microphoned alse detected ~10Hz signal. (https://klog.icrr.u-tokyo.ac.jp/osl/?r=28151)
    * Magnetometers : Glithces at the CS and X-end, but not in the Y-end. (https://klog.icrr.u-tokyo.ac.jp/osl/?r=28179)
    * Voltagemeters : DV level of the GND voltage was changed. (https://klog.icrr.u-tokyo.ac.jp/osl/?r=28175)
    * Water fluid : Total amount though the Y-end was increased. (https://klog.icrr.u-tokyo.ac.jp/osl/?r=28159)
    * Room temperature : No serious behavers. (https://klog.icrr.u-tokyo.ac.jp/osl/?r=28154)
    * Vacuum pressure : EY was getting a little bit worse, but comming back now.(https://klog.icrr.u-tokyo.ac.jp/osl/?r=28147)
Line 176: Line 157:
  * Recovery of suspensions

Weekly PEM meeting

General announcement

  • 新年明けましておめでとうございます。
    • 2024年もよろしくお願いします。
  • Kamioka visiting plan
    • Yokozawa and Washimi-san have several budgets (共同利用)
      • So we want to call not only PEM members but also KAGRA members who are interested in onsite.
      • If you want to visit Kamioka, please contact Yokozawa
    • Hoshino & Sato will stai Kamioka on February (3weeks?)

  • O4b
    • Break : mid-January - mid-March, 2024
    • Virgo : will join in March
    • KAGRA : Three-month observation around here
  • O4a noise budget paper
    • If you have a plan to write the paper using O4a data and PEM, please let me know.

Meeting and Conference issue

If you have some presentation about PEM related, please contact to me.

Business travel (except for conferences)

  • To Kamioka
    • Hoshino (February?)
    • Sato (Febryary?)
  • From Kamioka
    • No plan

General issue

  • Effect of earthquake
    • Noto earthquake at 1/1
    • IMC : Need open in near future
      • Suspension health check, vacuum check, and so on
    • Other suspensions:
      • Type-C : IMMT1,2 OMMT1,2, OSTM health check ongoing
      • TYpe-Bp : Serious drift, check one by one, there are possibility to open the whole area
      • Type-B : No serious damage achieve LOCK_ACQUISITION, start health check soon
      • Type-A : Several drifting in MN oplev when we align with TM, but achive LOCK_AQCUISITION
  • Cooling down
    • IX,EX,EY : Radiation shield cooling down : 84-88 K
    • EY : Started the cooling down duct shield
      • 98 K
    • Temperature change url

    • After starting the cooling down after measuring the Q-value of sapphire fiber
  • Strategy for noise hunting

Jurnal paper issue

Details are here!

  • Micro seismic analysis (Hoshino)
  • Acoustic reverberation time paper (Washimi+, Sato?)
    • Suspend
    • Re-measurement before O4?
  • TCam paper
    • Writing ongoing

Preparation for O4b

  • Snow monitor
    • Ongoing
    • First snow detected
  • PEM installation
    • Waiting the timing of TMSX and TMSY
  • Evaluation of newtonian noise
    • Anoop and Washimi
  • Investigation of the PEM injection
    • Magnetic injection
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Hoshino
    • Seismic motion analysis
  • Sato
    • Sound source analysis
  • Miyamoto
    • Weather analysis
  • Takatani
    • Noise subtraction with machine learning
  • Kume
    • PR3 line injection klog25670

    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Snow monitor
    • Signals from the Noto earthquake and tsunami
  • Yokozawa
    • Recovery of suspensions
    • Noise budget in current IFO

Place for memo