Weekly PEM meeting
- 2024/03/22(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- SEO PEM budget 2024
- Maintenance
- Towards O5
- Several Virgo ENV member have some plan to visit KAGRA about 1 month
- One month Aug. - Dec.
- They are also thinking about visiting LIGO
- KAGRA would still be commissioning phase
- Plan
- Noise hunting (PEM injection)
- Magnetic injection
- Additional NN measurement
- Other
- Authorlist 2024
- If you have an opinion, please let us know.
- O4b
- ER16 20th Mar.
- O4b 3rd Apr.
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
- Please reserve the hotel in Hokkaido if you plan to join the Autum JPS meeting next time
- JPS (online) 2024/3/18-21
https://www.jps.or.jp/activities/meetings/spring/spring_index.php
- Hoshino (Earthquake)
- Miyamoto (weather)
- Sato (Sound)
- Takatani (Noise subtraction)
- KIW11
- Taiwan (2024/04/16-20)
- Yokozawa : Exploring the Mesoscale Meteorology on the KAGRA Gravitational Wave Detector
- Washimi : Earthquake Effects on KAGRA
- 4/19 afternoon meeting with deepclean member
- GWADW
- Australia (2024/05/12-18)
- GWPAW
- Israel (2024/05/27-31)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- To Kamioka
- None
- From Kamioka
- Yokozawa (3/27-29 Kashiwa)
- Yokozawa (4/13-21 Taiwan)
General issue
- Interferometer recovery
- IMC
- Plan
- Final check : Done
- vibration check, photo session : today planned
- Closing : 3/25 -
- Pumping : 3/26-
- Plan
- Type-Bp
- First contac trial
- Wait next step (IR alignment after IMC closing)
- Type-A
- IX
- Oplev viewport cleaning
- Roll realignment
- Earthquake check oplev path check ??
- EX
- Earthquake check oplev path check : Done
- Health check : Ongoing
- We found several viewport window cleaning
- EY
- BF coil : Done
- PF cabling : Planned
- Roll alignment
- Earthquake check oplev path check ??
- IY
- Pick up the information
- IX
- Green alignment recovery
- Both GRX and GRY reached end
- Found POP POS table for reflection beam from ETMs
- Pcal
- X
- Final check before closing chamber
- Y
- After finalize X
- X
- TCam
- Photo taking with major : Done
- Taking picture with GRX flash
- End Y cleaning
- IMC
- Strategy for noise hunting
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submit to PTEP
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
Preparation for O4b
- Snow monitor
- Ongoing
- First snow detected
- PEM installation
- Waiting the timing of TMSX and TMSY
- Evaluation of newtonian noise
- Anoop and Washimi
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Hoshino
- Seismic motion analysis
- Sato
- Sound source analysis
- Miyamoto
- Weather analysis
- Takatani
- Noise subtraction with machine learning
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- Yokozawa
- TCam