Weekly PEM meeting
- 2024/06/14(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Commissioning leader changed from Miyakawa-san to Ushiba-san
- KAGRA Regular Young Researcher Meeting
- Next 19th June (Wed) 17:00-(JST)
- Several young researcher workshop around F2F
- Several Virgo ENV member have some plan to visit KAGRA about 1 month
- One month around Nov.
- They are also thinking about visiting LIGO
- KAGRA would still be commissioning phase
- Plan
- Noise hunting (PEM injection)
- Magnetic injection
- Additional NN measurement
- Other
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
- KAGRA F2F meeting
- TCU 21st Aug. - 23rd Aug.
Registration url (Deadline 17th Jul.)
- 2024 Annual Meeting of the Physical Society of Japan
- Yokozawa (Seismic noise according to the blasting)
- Washimi (OMC repairment)
- Ohashi(TCU) (Seis with ML)
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- To Kamioka
- Aogaku (6/23-6/27)
- From Kamioka
- No
General issue
- Interferometer recovery
- Closing the vacuum chamber at center area
- Done, no large leaks
- Opened the GV PRM-PR3, BS-IXC and BS-IYC
- Leak test : this week and next week
- EYA work
- Cleaning : Done
- PCal mirror cleaning : Done
- PCal alignment : Done
- PCal characterization : ongoing
- Closing work : Next week
- OMC vibration
- OMC stack repairment : ongoing
Schedule : pdf
- IR/GR alignment recovery : Done
- Xarm GR/IR alignment
- POP table, TMSX table adjustment
- Xarm GR/IR alignment
- Closing the vacuum chamber at center area
出張PEM injection (planning form)
Jurnal paper issue
- Micro seismic analysis (Hoshino)
- Submit to PTEP (2nd submission)
- Acoustic reverberation time paper (Washimi+, Sato?)
- Suspend
- Re-measurement before O4?
Preparation for O4b
- PEM installation
- Waiting the timing of TMSX and TMSY
- Evaluation of newtonian noise
- Anoop and Washimi
- Investigation of the PEM injection
- Magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Sato
- Sound source analysis
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- OMC vibration test
- Yokozawa
- Additional Shindo monitor with raspberry pi