Line 7: Line 7:

 * Commissioning leader changed from Miyakawa-san to Ushiba-san
Line 64: Line 66:
    * Schedule :     * Schedule : [[attachment:OMC stack schedule 0612.pdf|pdf]]
Line 67: Line 69:
    * Check the beam position at various mirrors (adjust good alignment for O4a ASC)     * Xarm GR/IR alignment
     * POP table, TMSX table adjustment

Weekly PEM meeting

General announcement

  • Commissioning leader changed from Miyakawa-san to Ushiba-san
  • KAGRA Regular Young Researcher Meeting
  • Several Virgo ENV member have some plan to visit KAGRA about 1 month
    • One month around Nov.
    • They are also thinking about visiting LIGO
    • KAGRA would still be commissioning phase
    • Plan
      • Noise hunting (PEM injection)
      • Magnetic injection
      • Additional NN measurement
      • Other
  • O4a noise budget paper
    • If you have a plan to write the paper using O4a data and PEM, please let me know.

Meeting and Conference issue

  • 2024 Annual Meeting of the Physical Society of Japan
    • Yokozawa (Seismic noise according to the blasting)
    • Washimi (OMC repairment)
    • Ohashi(TCU) (Seis with ML)
  • GWPAW
    • England (2024/05/27-31)
  • Other meetings url

If you have some presentation about PEM related, please contact to me.

Business travel

  • To Kamioka
    • Aogaku (6/23-6/27)
  • From Kamioka
    • No

General issue

  • Interferometer recovery
    • Closing the vacuum chamber at center area
      • Done, no large leaks
      • Opened the GV PRM-PR3, BS-IXC and BS-IYC
      • Leak test : this week and next week
    • EYA work
      • Cleaning : Done
      • PCal mirror cleaning : Done
      • PCal alignment : Done
      • PCal characterization : ongoing
      • Closing work : Next week
    • OMC vibration
      • OMC stack repairment : ongoing
      • Schedule : pdf

    • IR/GR alignment recovery : Done
      • Xarm GR/IR alignment
        • POP table, TMSX table adjustment

Jurnal paper issue

Details are here!

Preparation for O4b

  • PEM installation
    • Waiting the timing of TMSX and TMSY
  • Evaluation of newtonian noise
    • Anoop and Washimi
  • Investigation of the PEM injection
    • Magnetic injection
  • Voltmeter preparation
    • AC power monitor installation
    • DC power monitor installation

Progress report

  • Yuzurihara
    • Pastavi
    • Data Quality Report slide

    • Data quality evaluation
  • Sato
    • Sound source analysis
  • Kume
    • PR3 line injection klog25670

    • Noise subtraction
  • Nishizawa
    • Water newtonian noise
    • Magnetic field analysis
  • Washimi
    • Vibration test around IMC area (Yokozawa?)
    • OMC vibration test
  • Yokozawa
    • Additional Shindo monitor with raspberry pi

Place for memo