Weekly PEM meeting
- 2024/10/04(Fri) 17:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
General announcement
- Virgo ENV member have some plan to visit KAGRA about 1 month
- Changed from Dec. to Jan. or Feb. next year
- They are also thinking about visiting LIGO
- KAGRA would still be commissioning phase
- Plan
- Noise hunting (PEM injection)
- Magnetic injection
- Additional NN measurement
- Other
- O4a noise budget paper
- If you have a plan to write the paper using O4a data and PEM, please let me know.
Meeting and Conference issue
Other meetings url
If you have some presentation about PEM related, please contact to me.
Business travel
- To Kamioka
- No
- From Kamioka
- Washimi (NAOJ)
General issue
- Commissioning
- PRFPMI
- PRFPMI RF lock succeeded
- Minimum Alignment Sensing and Control closed
- Moved to DC readout
- Schedule
- PRFPMI DC readout characterization (-10/20)
- OMC repairing (10/21-25)
- PRFPMI
出張PEM injection (planning form)
Jurnal paper issue
Preparation for O4b
- Coil preparation for magnetic injection
- Voltmeter preparation
- AC power monitor installation
- DC power monitor installation
Progress report
- Yuzurihara
- Pastavi
Data Quality Report slide
- Data quality evaluation
- Sato
- Sound source analysis
- Ohashi
- Microseismic noise with machine learning
- Kume
PR3 line injection klog25670
- Noise subtraction
- Nishizawa
- Water newtonian noise
- Magnetic field analysis
- Washimi
- OMC test at NAOJ
- Yokozawa
- Noise hunting