Differences between revisions 2 and 68 (spanning 66 versions)
Revision 2 as of 2018-07-25 07:45:25
Size: 2634
Comment:
Revision 68 as of 2018-12-10 12:59:03
Size: 1811
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= Physical Environment Monitors Subgroup = = Physical Environment Monitors (PEM) Subgroup =
||<#F8E0E0> '''Meeting''' ||<#F8E0E0> '''General Information ''' ||<#F8E0E0> '''Projects''' ||<#F8E0E0> '''Tasks''' ||<#F8E0E0> '''Documents'''||<#F8E0E0> '''Link'''||
|| [[KAGRA/Subgroups/PEM/Meeting|Meeting]] || [[KAGRA/Subgroups/PEM/Channels |KAGRA PEM Channels]] || [[KAGRA/Subgroups/PEM/Monitor | PEM Selection]] || [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]] || [[http://pem.ligo.org|LIGO PEM]]||
|| || [[KAGRA/Subgroups/PEM/List |KAGRA PEM Lists]] || [[KAGRA/Subgroups/PEM/Install | PEM Installation]] || [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term]]|| [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7529|All PEM equipments]] ||
|| || [[KAGRA/Subgroups/PEM/ADC | ADC Channel List]] || [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]] || || -- || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] ||
|| || -- ||[[KAGRA/Subgroups/PEM/XarmComm | Oct. 2018 X-arm commissioning]] ||
|| || || [[KAGRA/Subgroups/PEM/SummaryPage | SummaryPage]] ||
|| || ||
|| || ||
Line 3: Line 11:
== General informations ==
 
 * [[https://calendar.google.com/calendar/embed?src=gnvnsdgg87ir8jmo1j6v9nn4ic%40group.calendar.google.com&ctz=Asia%2FTokyo|Schedule]]
 * [[KAGRA/Subgroups/CAL/Shift|Shift]]
 * [[KAGRA/Subgroups/CAL/Official_figs|Official figures]]
 * [[KAGRA/Subgroups/CAL/CAL_Meeting|CAL Meeting]]
Line 10: Line 12:
== bKAGRA phase3 ==
 * [[KAGRA/Subgroups/CAL/Gcal|Gravity field calibrator]]

== bKAGRA phase2 ==
 * [[KAGRA/Subgroups/CAL/Pcal|Photon Calibrator]]
 * [[KAGRA/Subgroups/CAL/Front-end|Front-end]]
 * [[KAGRA/Subgroups/CAL/Low-latency_and_offline|Low-latency and offline]]
 * [[KAGRA/Subgroups/CAL/DARM_model|DARM model]]
 * [[KAGRA/Subgroups/CAL/Hardware_injection|Hardware injection test]]
 * [[KAGRA/Subgroups/CAL/Pcal_verification|Verification of Calibration]]
 * [[KAGRA/Subgroups/CAL/Sys_error|Systematic errors assignment]]

== bKAGRA phase1 ==
 * [[KAGRA/Subgroups/CAL/phase1|bKAGRA phase1 calibration memo]]
 * [[KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary|Measurements Summary]]
 * [[KAGRA/Commissioning/Phase1/Operation/MeasurementsSummary/CWInjection|CW injections]]
 * [[KAGRA/Commissioning/Phase1/Operation/ChannelList|Important channels]]

== Tasks ==
 * [[KAGRA/Subgroups/CAL/WG/tasks|Tasks and milestones]]

== CAL-related publications and talks ==
 * [[KAGRA/Subgroups/CAL/pubs|Publication and talks]]

== References ==
 * [[http://iopscience.iop.org/article/10.1088/1361-6382/aab658/meta|LIGO h(t) reconstruction CQG 35,095015]]
 * [[https://journals.aps.org/prd/abstract/10.1103/PhysRevD.96.102001|LIGO calibration uncertainty PRD 96, 102001]]
 * [[https://dcc.ligo.org/P1500248/public|aLIGO calibration LIGO-P1500248]]
 * [[https://dcc.ligo.org/LIGO-P1600063/public|aLIGO time dependent calibration LIGO-P1600063]],[[http://iopscience.iop.org/article/10.1088/0264-9381/34/1/015002/meta|CQG 34,1]]
 * [[https://dcc.ligo.org/LIGO-P1500249/public|aLIGO Pcal LIGO-P1500249]],[[https://aip.scitation.org/doi/10.1063/1.4967303|RSI 87, 114503]]
 * [[https://dcc.ligo.org/LIGO-E1300707/public|LIGO Pcal documents tree LIGO-E1300707]]
 * [[https://dcc.ligo.org/public/0122/G1501518/014/darmschematics-v14.pdf|LIGO CAL subway map]]
 
== Others ==
 * [[KAGRA/Subgroups/PEM/TASK/PSLTasksOLD | PSL issue (Done)]]
 * [[KAGRA/Subgroups/PEM/TASK/TYTasks | Yokozawa issue]]
 * [[KAGRA/Subgroups/PEM/TASK/TTTasks | T.Tanaka issue]]
 * [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]]
 * [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term tasks]]
 * [[KAGRA/Subgroups/PEM/Monitors |Monitors information]]
Line 46: Line 22:
 * 灰野 禎一 Sadakazu Haino (Academis Sinica)  * 横澤 孝章 Takaaki Yokozawa (ICRR)
Line 49: Line 25:
 * 井上 優貴 Yuki Inoue (Academia Sinica) - Instrumentation and Verification of the Calibration
 * 山本 尚弘 Takahiro Yamamoto (ICRR) - Online and offline reconstruction
 * 横澤 孝章 Takaaki Yokozawa (ICRR) - Injection and assignment of systematic errors
 * (To be discussed)
Line 53: Line 27:
Members: == Definition and scope ==
 1.
 2.

Physical Environment Monitors (PEM) Subgroup

Meeting

General Information

Projects

Tasks

Documents

Link

Meeting

KAGRA PEM Channels

PEM Selection

Short term tasks

PEM plan(pdf)

LIGO PEM

KAGRA PEM Lists

PEM Installation

Long term

Usefull KnowHow

All PEM equipments

ADC Channel List

Rack and cabling check

--

PEM JGWdoc Tree

--

Oct. 2018 X-arm commissioning

SummaryPage

Others

Member list

Chief:

  • 横澤 孝章 Takaaki Yokozawa (ICRR)

Sub-Chiefs:

  • (To be discussed)

Definition and scope

KAGRA/Subgroups/PEM (last edited 2023-11-08 14:27:12 by tatsuki.washimi)