Differences between revisions 63 and 121 (spanning 58 versions)
Revision 63 as of 2018-12-10 12:54:42
Size: 1810
Editor: KousekiMiyo
Comment:
Revision 121 as of 2018-12-17 15:42:02
Size: 2454
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
||<#F8E0E0> '''Meeting''' ||<#F8E0E0> '''General Information ''' ||<#F8E0E0> '''Projects''' ||<#F8E0E0> '''Tasks''' ||<#F8E0E0> '''Documents'''||<#F8E0E0> '''Link'''||
|| [[KAGRA/Subgroups/PEM/Meeting|Meeting]] || [[KAGRA/Subgroups/PEM/Channels |KAGRA PEM Channels]] || [[KAGRA/Subgroups/PEM/Monitor | PEM Selection]] || [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]] || [[http://pem.ligo.org|LIGO PEM]]||
|| || [[KAGRA/Subgroups/PEM/List |KAGRA PEM Lists]] || [[KAGRA/Subgroups/PEM/Install | PEM Installation]] || [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term]]|| [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] ||
|| || [[KAGRA/Subgroups/PEM/ADC |ADC and Racks for PEM]] || [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]] || || ||
|| || [[KAGRA/Subgroups/PEM/SummaryPage | SummaryPage]] ||[[KAGRA/Subgroups/PEM/XarmComm | Oct. 2018 X-arm commissioning]] ||
|| || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7529|All PEM equipments]] ||
|| || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] ||
|| || || || ||
||<#A9D0F5> '''Meeting''' ||<#A9D0F5> '''General Information ''' ||<#A9D0F5> '''Current Github Projects''' ||<#A9D0F5> '''Documents'''||<#A9D0F5> '''Link'''||<#A9D0F5> '''Current Github Project'''||
|| [[KAGRA/Subgroups/PEM/Meeting|PEM Meeting]] || [[KAGRA/Subgroups/PEM/Channels |PEM Channels]] || [[https://github.com/gw-pem/kagra-pem/projects/5|Argent Problem]] || [[http://pem.ligo.org|LIGO PEM]]|| [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8435|PEM plan(pdf)]] || ||
|| [[KAGRA/Commissioning|Commisioning Meeting]] || [[KAGRA/Subgroups/PEM/List |PEM Equipments]] || [[KAGRA/Subgroups/PEM/PemInjection |PEM Injection]] || [[KAGRA/Subgroups/PEM/knowhow|Usefull KnowHow]] || -- || [[https://github.com/gw-pem/kagra-pem/projects/3|Monitor Characterization ]] ||
|| || [[KAGRA/Subgroups/PEM/ADC | Available ADC list]] || [[KAGRA/Subgroups/PEM/QualityFlag | Quality Flag]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9295|PEM JGWdoc Tree]] || [[https://www.icrr.u-tokyo.ac.jp/~yamat/KAGRA/bruco | BrucoSummary]] ||
|| || || [[KAGRA/Subgroups/PEM/Bruco | KAGRA-Bruco]] || [[KAGRA/Subgroups/PEM/SummaryPage | SummaryPageInfo]] || -- ||
Line 11: Line 8:
== Definition and scope ==
 1. ~+PEM is sensing system to check the detector health, noise source and h(t) data quality+~
 2. ~+__'''Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks'''__ so that the data necessary for commissioning procedure are collected.+~
From [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8401| JGW-E1808401]]
== Others ==
 * [[KAGRA/Subgroups/PEM/TASK/OLD | Old issue]]
Line 12: Line 15:

== Others ==
 * [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term]]
 * [[KAGRA/Subgroups/PEM/TASK/ShortTerm | Short term tasks]]
Line 20: Line 23:
== Member list ==

Chief:
 * 横澤 孝章 Takaaki Yokozawa (ICRR)

Sub-Chiefs:
 * (To be discussed)

== Definition and scope ==
 1.
 2.
 * [[KAGRA/Subgroups/PEM/Monitor | PEM Selection]]
 * [[KAGRA/Subgroups/PEM/Install | PEM Installation]]
 * [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]]
 * [[KAGRA/Subgroups/PEM/XarmComm | Oct. 2018 X-arm commissioning]]

Physical Environment Monitors (PEM) Subgroup

Meeting

General Information

Current Github Projects

Documents

Link

Current Github Project

PEM Meeting

PEM Channels

Argent Problem

LIGO PEM

PEM plan(pdf)

Commisioning Meeting

PEM Equipments

PEM Injection

Usefull KnowHow

--

Monitor Characterization

Available ADC list

Quality Flag

PEM JGWdoc Tree

BrucoSummary

KAGRA-Bruco

SummaryPageInfo

--

Definition and scope

  1. PEM is sensing system to check the detector health, noise source and h(t) data quality

  2. Selection, installation and maintenance of PEMs in KAGRA detector are the main tasks so that the data necessary for commissioning procedure are collected.

From JGW-E1808401

Others

KAGRA/Subgroups/PEM (last edited 2023-11-08 14:27:12 by tatsuki.washimi)