Differences between revisions 38 and 56 (spanning 18 versions)
Revision 38 as of 2010-08-20 16:09:27
Size: 910
Comment:
Revision 56 as of 2012-06-06 17:42:10
Size: 1422
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from LCGT/subgroup/mine
Line 18: Line 19:
 . [[attachment:Tunnel_Ry_100818.pdf]]  . [[attachment:Tunnel_Ry_100921.pdf]]
Line 21: Line 22:
== Life lines == == Life-lines ==
Line 23: Line 24:
 * Water for cooling  * Cooling Water
  . [[attachment:Laser_mio_101012.pdf|For Laser]]
Line 25: Line 27:
 * Network  * Network [Miyoki]
Line 35: Line 37:
 * Air intake from out-of-mine  * Air intake from out-of-mine [Uchiyama]
 * [[attachment:air.pdf|Air ventilation estimation (in Japanese)]]

== Air Conditioning ==
 * [[attachment:humidity_control.pdf|Requirements for humidity]]
 * Basic Plan [Tatsumi]

== GPS antenna ==
 * GPS antenna location [Tatsumi, Aso]
   . [[attachment:GPS_antenna_requirements.pdf|Selection of candidates]] (in Japanese)
 * Link to [[KAGRA/Subgroups/DGS/Projects/Timing|Timing System]]

Infrastructure

Overview of the underground labyrinth

  • alt text

Detailed view of each experimental hall

Center room

End rooms

Tunnel

Life-lines

  • AC Power Supply

  • Cooling Water
  • Network [Miyoki]
    • TCP/IP network
    • For Digital Control
    • GPS and timing system
  • Telehone (IP phone??)

Security & Administration

Cleanliness

Air Conditioning

GPS antenna

KAGRA/Subgroups/TUN (last edited 2012-06-06 17:42:10 by OsamuMiyakawa)