Size: 1224
Comment:
|
← Revision 56 as of 2012-06-06 17:42:10 ⇥
Size: 1422
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
## page was renamed from LCGT/subgroup/mine | |
Line 23: | Line 24: |
* Water for cooling . [[attachment:Laser_mio_101012.pdf|Laser]] |
* Cooling Water . [[attachment:Laser_mio_101012.pdf|For Laser]] |
Line 26: | Line 27: |
* Network | * Network [Miyoki] |
Line 36: | Line 37: |
* Air intake from out-of-mine * [[attachment:air.pdf|Air ventilation estimation (in Japanese)]] |
* Air intake from out-of-mine [Uchiyama] * [[attachment:air.pdf|Air ventilation estimation (in Japanese)]] == Air Conditioning == * [[attachment:humidity_control.pdf|Requirements for humidity]] * Basic Plan [Tatsumi] |
Line 40: | Line 45: |
* GPS antenna location | * GPS antenna location [Tatsumi, Aso] |
Line 42: | Line 47: |
* Link to [[LCGT/subgroup/ifo/digital/Timing|Timing System]] | * Link to [[KAGRA/Subgroups/DGS/Projects/Timing|Timing System]] |
Infrastructure
Overview of the underground labyrinth
Detailed view of each experimental hall
Center room
- Layout planned by each sub-groups
- IFO group
End rooms
Tunnel
Life-lines
- Cooling Water
- Network [Miyoki]
- TCP/IP network
- For Digital Control
- GPS and timing system
- Telehone (IP phone??)
Security & Administration
Cleanliness
- Air intake from out-of-mine [Uchiyama]
Air Conditioning
- Basic Plan [Tatsumi]
GPS antenna
- GPS antenna location [Tatsumi, Aso]
Selection of candidates (in Japanese)
Link to Timing System