Size: 1419
Comment:
|
← Revision 56 as of 2012-06-06 17:42:10 ⇥
Size: 1422
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 47: | Line 47: |
* Link to [[LCGT/subgroup/ifo/digital/Timing|Timing System]] | * Link to [[KAGRA/Subgroups/DGS/Projects/Timing|Timing System]] |
Infrastructure
Overview of the underground labyrinth
Detailed view of each experimental hall
Center room
- Layout planned by each sub-groups
- IFO group
End rooms
Tunnel
Life-lines
- Cooling Water
- Network [Miyoki]
- TCP/IP network
- For Digital Control
- GPS and timing system
- Telehone (IP phone??)
Security & Administration
Cleanliness
- Air intake from out-of-mine [Uchiyama]
Air Conditioning
- Basic Plan [Tatsumi]
GPS antenna
- GPS antenna location [Tatsumi, Aso]
Selection of candidates (in Japanese)
Link to Timing System