Acceptance Test
(A) Design phase
=== A01===
- hoge
(B) Installation phase
B01
- Cable connection
- Resistance (Ohom)
- Continuity (O/X)
(C) Integration phase
C01
C02
Check items on Hardware
Cable connection
- Resistance (Ohom)
- Continuity (O/X)
Calibration (LVDT, ACC)
- Calibration (plot, polarity, coefficient)
- Sensor noise (plot)
Working point and dynamic range with FR, Limit SW
- Range (from -mm to +mm)
- Minimum range (mm)
- Optimal point (mm)
- Limit SW (on/off)
Tuned frequencies of GAS Filter/IP
- Frequency (TF, actuator efficiency)
- Maximum frequency (Hz)
Check items on Software (Control)
Healthy check template
- Transfer function (plot)
- Resonant frequencies (PreQUA)
Damping time
- RMS in spectrum (plot)
Noise budget
- Spectrum (plot)