Line 6: Line 6:
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3907|IM assembly procedure]]

Installation Procedure for Type-Bp suspensions

Preparation at the NAOJ

  • Pre-assembly of the payload parts (RM, IM, IMRM)
  • Assembly and shipping of the bottom filters
  • Assembly and shipping of the traversers
  • Attachment of the magnets on the mirrors

Preparation at Akeno

  • Send standard filters and earthquake stops from Akeno to Kamioka

Out sourced works

  • Installation of the bottom plates
  • Installation of the inner frame
  • Installation of the bread boards including bread board dampers. -> TO DO: buy wires, damping magnets, hooks, springs, etc

Installation at Kamioka

  • Preparation
    • Clean up the work area
    • Make sure all the necessary components are there
  • Set up the mirror assembly frame -> TO DO: prepare a table to do this

  • Suspend the mirror & RM from the IM

  • Set up the suspension assembly frame -> TO DO: prepare the assembly frame

  • Put the mirror+RM+IM into the assembly frame
  • Put a bottom filter and a standard filter