Installation Procedure for Type-Bp suspensions
Contents
Preparation at the NAOJ
- Pre-assembly of the payload parts (RM, IM, IMRM)
- Assembly and shipping of the bottom filters
- Assembly and shipping of the traversers
- Attachment of the magnets on the mirrors
Preparation at Akeno
- Send standard filters and earthquake stops from Akeno to Kamioka
Out sourced works
- Installation of the bottom plates
- Installation of the inner frame
Installation of the bread boards including bread board dampers. -> TO DO: buy wires, damping magnets, hooks, springs, etc
Installation at Kamioka
- Preparation
- Clean up the work area
- Make sure all the necessary components are there
Set up the mirror assembly frame -> TO DO: prepare a table to do this
Suspend the mirror & RM from the IM
Set up the suspension assembly frame -> TO DO: prepare the assembly frame
- Put the mirror+RM+IM into the assembly frame
- Put a bottom filter and a standard filter