Differences between revisions 75 and 76
Revision 75 as of 2015-11-23 07:07:34
Size: 10113
Editor: YoichiAso
Comment:
Revision 76 as of 2015-11-26 12:17:31
Size: 10189
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
=== 2015.11.27 ===

[[KAGRA/Subgroups/VIS/VISMinutes20151127|Minutes]]

NAOJ VIS Meeting

  • Every Friday, from 13:30 (JST)
  • Next Meeting: 5 November, 2015


2015.11.27

Minutes

2015.11.20

Minutes

2015.11.13

Minutes

2015.11.05

Minutes

2015.10.30

Minutes

2015.10.21

2015.10.14

2015.10.7

2015.10.2

2015.9.16

2015.9.9

2015.9.2

2015.8.26

2015.8.19

2015.8.12

2015.8.5

2015.7.29

2015.7.22

2015.7.15

2015.7.8

2015.6.17

2015.6.10

2015.6.3

2015.5.27

2015.5.20

2015.5.7

2015.4.30

2015.4.24

2015.4.15

2015.4.8

2015.3.25

2015.3.11

2015.3.4

2015.2.25

2015.2.4

2015.1.28

2015.1.14

2015.1.7

2014.12.24

2014.12.17

2014.12.10

2014.12.3

2014.11.26

2014.11.19

2014.11.5

2014.10.8

2014.9.24

2014.9.17

2014.8.27

2014.8.20

2014.8.13

2014.8.6

2014.7.24

2014.7.16

2014.7.9

2014.7.2

2014.6.25

2014.6.18

2014.6.11

  • Minute

  • 1) Assembly of the payload in the 20m Lab.
  • 2) Calibration of OSEMs.
  • 3) Preparation of TAMA suspension.
  • 4) MISC

2014.6.4

  • Minute

  • 1) Status of payload assembly. File(TBA)

  • 2) Preparation of TAMA suspension and stack. File(TBA)

  • 3) Fishing rod design for KAGRA GAS filters. File

2014.5.21

2014.5.14

  • Minute

  • 1) Status of payload design and prototype assembly. File(TBA)

  • 2) Brief reports, status of Type-C procurement. File

  • 3) Simulation on coil driver circuits. File

2014.5.7

  • Minute

  • 1) Status of payload prototype assembly. File(TBA)

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File(TBA)

  • 4) Vacuum system setup in TAMA west end. Blog

2014.4.30

  • Minute

  • 1) Status of payload prototype assembly. File

  • 2) Measurement on OSEM. File

  • 3) Weight distribution problem on the payload. File

  • 4) Report on G&M and NIKHEF. File

2014.4.23

  • 1) Status of payload assembly in the 20m Lab. File(TBA)

  • 2) Weight distribution problem on the payload. File

2014.4.9

KAGRA/Subgroups/VIS/MeetingNAOJ (last edited 2021-07-21 08:59:45 by KousekiMiyo)