Project
Sprint
09/28 - 10/09
Holiday:
09/14 - 09/25
Scope: Holiday: 09/21,09/22
Done #49: Make the new directory structure to avoid messy workspace.
Done #53: same as #49. Duplicated issue.
Done #11: We decided not to divide the VIS RT-model into the tower and payload part towards O4.
Done #16: Made the test point for CAL to inject the excitation signal to the VIS suspensions.
Done #23: Made VIS_OVERVIEW.adl
Done #12: We still open the discussion whether we should do the hard-code the static value in the RT-model so that someone doesn't change the value accidentally in medm.
Done #142: Ikeda-san prepared the test environment in his desk for the stepper motor which have a new limit switch made by Sato-san.
Done #125: Sato-san checked the direction of rotation for the stepper motor.
Done #141: Make new repository named 'pcas-controller' for stepper motor. I hope this repository will integrate all controllers in KAGRA, e.g. picomotor, half wave plate, and function generator.
Done #xx:
Done #xx:
Done #xx:
Done #xx: