= Type-A Meeting on 2016/10/18 =
2016/10/18 13:00 - 14:30 @Room 210

Participants: Takahashi, Ishizaki, Sato, Okutomi

=== Minutes ===
 0-1 Assy. (Ishizaki)
  * Made 2D assy. drawings (cross section).
 0-2 Simulation (Okutomi)
  * Had the workshop with Miyamoto on 6-8th. Made the model including the cryo-payload.
 2-2 Procurement of cone bellows (Takahashi)
  * Delivered.
 3-2 Assembly of TF+IP (Sato)
  * IP and TF were carried into the clean room in 6-7th.
  * Poles to support upper TF were collapsed in the box. Some screws and magnets for york are broken.
  * Started assembly of pre-isolator on 19th.
 3-5 ACC preparation (Sato)
  * Measured the sensitivity of 3 ACCs at the KAGRA site in 12-14th.
  * Measured sensitivities were 10^-10~10^-9m/rtHz.
 5-2 Assembly of BF (Hirata)
  * Finished the assembly of two BFs. They will be packed on 26th.
 5-7 Procurement of damper (Sato)
  * The bidding was announced on 14th. Open bidding is on 9th November.
 5-8 Test of LVDT (Okutomi)
  * Designing combiner.
 6-5 Procurement of release sensor (Sato)
  * Ordered.
 7-2 Procurement of Maraging rod (Takahashi)
  * Asked ATC redesign of the head with safety margin of 2.
  * Hirata is making 2D drawings.
 9-1 Document of procedure (Takahashi)
  * The review is held on 4th November.
 9-7 Procurement of hoist tool (Ishizaki)
  * Designed the hoist tool using 500kg chain blocks. Consult with a company.
 9-8 Procurement of foot hold (Ishizaki)
  * Order 3 (high) and 2 (low) sets of foot hold.
 9-9 Procurement of handling tool (Ishizaki)
  * Kimura-san is considering floor plate around the cross tube.
  * Total load for the floor comes from the weight of carry lifter and dummy payload.
 9-10 Procurement of other tools (Ishizaki)
  * Consider lope to avoid falling tools.
  * Sato suggested cable tab.

Next meeting: 2016/10/25 13:00

Type-A Meeting on 2016/10/18

2016/10/18 13:00 - 14:30 @Room 210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • Made 2D assy. drawings (cross section).
    0-2 Simulation (Okutomi)
    • Had the workshop with Miyamoto on 6-8th. Made the model including the cryo-payload.
    2-2 Procurement of cone bellows (Takahashi)
    • Delivered.
    3-2 Assembly of TF+IP (Sato)
    • IP and TF were carried into the clean room in 6-7th.
    • Poles to support upper TF were collapsed in the box. Some screws and magnets for york are broken.
    • Started assembly of pre-isolator on 19th.
    3-5 ACC preparation (Sato)
    • Measured the sensitivity of 3 ACCs at the KAGRA site in 12-14th.
    • Measured sensitivities were 10-10~10-9m/rtHz.

    5-2 Assembly of BF (Hirata)
    • Finished the assembly of two BFs. They will be packed on 26th.
    5-7 Procurement of damper (Sato)
    • The bidding was announced on 14th. Open bidding is on 9th November.
    5-8 Test of LVDT (Okutomi)
    • Designing combiner.
    6-5 Procurement of release sensor (Sato)
    • Ordered.
    7-2 Procurement of Maraging rod (Takahashi)
    • Asked ATC redesign of the head with safety margin of 2.
    • Hirata is making 2D drawings.
    9-1 Document of procedure (Takahashi)
    • The review is held on 4th November.
    9-7 Procurement of hoist tool (Ishizaki)
    • Designed the hoist tool using 500kg chain blocks. Consult with a company.
    9-8 Procurement of foot hold (Ishizaki)
    • Order 3 (high) and 2 (low) sets of foot hold.
    9-9 Procurement of handling tool (Ishizaki)
    • Kimura-san is considering floor plate around the cross tube.
    • Total load for the floor comes from the weight of carry lifter and dummy payload.
    9-10 Procurement of other tools (Ishizaki)
    • Consider lope to avoid falling tools.
    • Sato suggested cable tab.

Next meeting: 2016/10/25 13:00

Type-A Meeting on 2016/10/4

2016/10/4 13:00 - 14:30 @Room 210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • Adding F1 damper and IP base.
    0-2 Simulation (Okutomi)
    • The work with Miyamoto is planed in 6-8th.
    3-1 Transportation of IP and TF (Takahashi)
    • Held on 3rd. Used the fork lift.
    3-2 Assembly of TF+IP (Sato)
    • Inspection of crane in the large clean room is held on 5th.
    • Carry IP and Tf into the clean room in 6-7th.
    3-5 ACC preparation (Sato)
    • Final test is planed at the KAGRA site on 12-14th.
    • Drivers and additional 3 units should be sent within this week.
    5-2 Assembly of BF (Hirata)
    • Assembling the 2nd unit.
    5-7 Procurement of damper (Sato)
    • Asking quotation. Some questions are coming from the company.
    5-8 Test of LVDT (Okutomi)
    • Test report was uploaded.
    6-2 Procurement of EQ stop (Ishizaki)
    • Need holes for cables on the shild plate.
    6-3 Test of prototype (Ishizaki)
    • The next test will be held on 5th.
    6-5 Procurement of release sensor (Sato)
    • Order soon.
    7-2 Procurement of Maraging rod (Takahashi)
    • We concluded that the load during crane operation is not over 2G.
    • We should take care of misoperation.
    9-1 Document of procedure (Takahashi)
    • The review is scheduled in early November.
    9-2 Transportation to 2F (Takahashi)
    • Crawler was prepared at the site.
    9-7 Procurement of hoist tool (Ishizaki)
    • Designing now.

Next meeting: 2016/10/18 13:00

Type-A Meeting on 2016/9/20

2016/9/20 13:00 - 14:30 @4th meeting room

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • Adding the model of BF damper and replacing the model of BF by Hirata.
    • Asking the company the model of IP base.
    0-2 Simulation (Okutomi)
    • The next meeting with Miyamoto has not been scheduled yet.
    3-1 Transportation of IP and TF (Takahashi)
    • Akeno on 3rd October.
    3-2 Assembly of TF+IP (Sato)
    • The place became the large clean room in ATC.
    • Access from the east door of TMT building is available.
    3-5 ACC preparation (Sato)
    • Final test is planed at the KAGRA site on 28-30th.
    5-7 Procurement of damper (Sato)
    • Making the specification document. Add inspection items, baking, S/N, gluing.
    5-8 Test of LVDT (Okutomi)
    • Measured the actuator Efficiency: 76mN/A.
    • Measured the position dependence of the efficiency.
    • Thermal load of 1W is predicted. PEEK is still acceptable.
    6-2 Procurement of EQ stop (Takahashi)
    • Had kick off meeting with the company person on 16th.
    • Length of rods was changed.
    6-3 Test of prototype (Ishizaki)
    • Tuned the weight of dummy payload for BF.
    • The next test will be held in October.
    6-5 Procurement of release sensor (Sato)
    • Ask quotation.
    7-2 Procurement of Maraging rod (Takahashi)
    • The safety margin in Virgo was 2.
    • Show head size roughly.
    9-7 Procurement of hoist tool (Ishizaki)
    • Start design.
    9-8 Procurement of foot hold (Ishizaki)
    • Short holds (~1m) are necessary too.

Next meeting: 2016/10/4 13:00

Type-A Meeting on 2016/9/13

2016/9/13 13:00 - 14:30 @Room210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • Made assy. model with the chamber. Add the IP base to the mode.
    0-2 Simulation (Okutomi)
    • Making a model of cryo-payload independently.
    1-1 Clean booth (FCL)
    • Cleaning around EYV will be started on 5th December.
    3-2 Assembly of TF+IP (Sato)
    • The place has not decided yet.
    3-5 ACC preparation (Sato)
    • Measured additional 3 units. The last i unit has a different connector.
    5-2 Assembly of BF (Hirata)
    • Started on 7th.
    5-6 Design of damper (Sato)
    • Made the drawings of parts. Make assy. drawings.
    • Showed design of the cabling and the connector plate.
    • The 1st specification document should be prepared by 16th.
    5-8 Test of LVDT (Okutomi)
    • Set up the bench for actuator test using damping rods and an acrylic table.
    • Measured the LVDT. Efficiency: 575V/m, Sensitivity: 10^-8m/rtHz
    6-2 Procurement of EQ stop (Takahashi)
    • Open bidding is on 13th.
    6-3 Test of prototype (Ishizaki)
    • The next setup consists of SF-BF-DP with M12 receptacle.
    • The work is planed on 14th.
    6-5 Procurement of release sensor (Sato)
    • Ask quotation for sensors with short cable.
    7-2 Procurement of maraging rod (Takahashi)
    • New design and test for strength is on going.
    • CFRP is available as material?
    9-8 Procurement of foot hold (Ishizaki)
    • Considering the type used in ATC, which is ready made and folded.

Next meeting: 2016/9/20 13:00

Type-A Meeting on 2016/9/6

2016/9/6 13:00 - 14:00 @Room310

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • This is the first priolity.
    0-2 Simulation (Okutomi)
    • Consulted with Miyamoto at Hongo on 1st. The information was shared.
    • Make a model of cryo-payload independently, and compare each other.
    2-1 Setting of top chamber (VAC)
    • It is difficult to insert the cone bellows later.
    • The pre-isolator will be put on the cone bellows at the time of leak test.
    3-2 Assembly of TF+IP (Sato)
    • The place has not decided yet. Scheduling is pending.
    3-5 ACC preparation (Sato)
    • Other 3 units were taken on 31st.
    5-1 Manufacturing of blade (Takahashi)
    • Ni plating was finished. Some blades were lusterless. They will be plated again.
    5-2 Assembly of BF (Hirata)
    • From 7th.
    5-6 Design of damper (Sato)
    • The support for primary coil and the hole position in coil bobbin will be modified.
    5-8 Test of LVDT (Okutomi)
    • Coil winding and assembly of the prototype was finished.
    • The test will be started in this week.
    6-1 Design of EQ stop (Ishizaki)
    • The length of rods was changed.
    6-2 Procurement of EQ stop (Takahashi)
    • Open bidding will be on 13th.
    6-3 Test of prototype (Ishizaki)
    • The next setup consists of SF-BF-DP with M12 receptacle.
    • It is necessary to disassemble the EQ stop once. The work is planed on 7th.
    6-5 Procurement of release sensor (Sato)
    • Ask quotation for sensors with long cable.
    7-2 Procurement of maraging rod (Takahashi)
    • Calculation and test for strength is on going.
    • The shape of head should be modified. Max. diameter is 8mm.
    9-2 Transportation to 2F (Takahashi)
    • 100kg crawler is in consideration.
    9-5 Installation
    • From 20th in January.
    9-7 Procurement of hoist tool (Ishizaki)
    • Items will be hung by 3 chain blocks.
    • 1.5t chain block is in consideration, but maybe too large.
    9-9 Procurement of handling tool (Ishizaki)
    • Stainless plate is necessary on the fine floor.
    • It is difficult to prepare for a hand lifter with large foot width.

Next meeting: 2016/9/13 13:00

Type-A Meeting on 2016/8/30

2016/8/30 13:00 - 15:00 @Room210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • This is the first priolity.
    0-2 Simulation (Okutomi)
    • Showed the yaw spectrum of the BF.
    • Requirement for dynamic range has not been shown yet.
    • Requirement for sensor is 10^-10m/rtHz, if the BF is controlled all the time.
    • Meet Miyamoto to discuss on the cryo-payload on 1st September.
    2-1 Setting of top chamber (VAC)
    • Leak test will be postponed for half of month due to delay of cooling test.
    3-2 Assembly of TF+IP (Sato)
    • Takahashi had a meeting on the place with Flaminio and Aso on 25th.
    • The place has not decided yet. Still negotiating.
    3-5 ACC preparation (Sato)
    • Calibration is postponed to the end of September.
    • Other 3 units will be taken on 31st.
    5-2 Assembly of BF (Hirata)
    • From September.
    5-6 Design of damper (Sato)
    • Amount of lift-up should be decided before the design of support ring.
    • Rotational position of BF cover should be fixed.
    • How to keep cables to cryostat? Connected or disconnected.
    • Bracket was modified. The lowest frequency was 120Hz.
    • Shape of bobbin depends on the prototype test.
    • Connectors for coils are mounted on the support frame.
    5-8 Test of LVDT (Okutomi)
    • Amplitude of oscillator was increased in 5 times. Efficiency became 5 times.
    • Test of sensor was finished. Test of actuator has not been yet.
    6-2 Procurement of EQ stop (Takahashi)
    • Two companies bid. Technical examination will be held.
    6-3 Test of prototype (Ishizaki)
    • Takahashi will make the test plan and Ishizaki will make the schedule.
    • Keep one day per week at least for the test.
    6-6 Circuit for release sensor (Sato)
    • The test circuit will be used in installation.
    • Final circuit is necessary by July in 2017.
    • Consult with AEL.
    7-2 Procurement of maraging rod (Takahashi)
    • Calculation and test for strength is necessary for all rods.
    • If the strength is not large enough, the shape of head should be modified.
    7-3 Design of support (Takahashi)
    • The rod for cryo-payload can stay in the cryostat.
    9-3 Cable assembly (Sato)
    • Plates for connectors should procured with the items on BF damping.
    • Add 20 plates for Type-Bp.
    9-10 Other tools (Ishizaki)
    • Added as new items.

Next meeting: 2016/9/6 13:00

Type-A Meeting on 2016/8/23

2016/8/23 13:00 - 14:30 @Large meeting room

Participants: Takahashi, Sato, Okutomi

Minutes

  • 0-2 Simulation (Okutomi)
    • Calculating requirement for actuators and sensors.
    • Estimated the case using F7 LVDT, and the case using actual LVDT.
    • Summarized within today, and present in the f2f meeting.
    2-1 Setting of top chamber (VAC)
    • Leak test should be performed in December, 2016.
    3-2 Assembly of TF+IP (Sato)
    • Takahashi had a meeting on the place with Flaminio and Aso.
    • The place has not decided yet. Next meeting will be held on 25th.
    3-5 ACC preparation (Sato)
    • Measured 6 sets were transported to Kamioka.
    • Calibration is planed at the site from 5th in September.
    4-4 Transportation of SF (Hirata)
    • 6 sets were transported to Kamioka on 17th.
    5-6 Design of damper (Sato)
    • Structure analysis was applied to the model.
    • Bracket of primary coil: 102Hz, bracket of secondary coil: 124Hz, including ring (t=20mm): 100Hz
    • The shape of adjustment hole will be changed from long circle to large circle.
    5-8 Test of LVDT (Okutomi)
    • Designed adapter for primary coil.
    • Considering set up for actuator.
    • Coil bobbins of prototype were delivered on 19th.
    • Amplitude of oscillator should be larger (now 1V).
    6-2 Procurement of EQ stop (Takahashi)
    • The bidding was announced on 17th. Two companies had contact.
    6-3 Test of prototype (Ishizaki)
    • Suspension test using maraging wires was performed on 18th.
    6-6 Circuit for release sensor (Sato)
    • This item should be added.
    9-6~9 Installation (Ishizaki)
    • Protection net, hoist tool, foot hold, handling tool were added as new items.

Next meeting: 2016/8/30 13:00

Type-A Review on 2016/8/10

http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5516

Type-A Meeting on 2016/8/9

2016/8/9 13:00 - 14:00 @Room210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • Made the model of EQ stop.
    0-2 Simulation (Okutomi)
    • Calculated coupling to the yaw mode assuming asymmetry of 1mm and 3mm. The result was linear.
    • Updating the calculation (Next by 8/10).
    3-5 ACC preparation (Sato)
    • Additional 3 sets have not been extracted yet.
    3-6 Procurement of counter weight
    • Delay.
    4-2,3 Standard filter (Hirata)
    • The 6th set will be finished on 10th.
    5-6 Design of damper (Sato)
    • Design of frame and jigs was progressed.
    • We consulted with a company on procurement.
    5-8 Test of LVDT (Okutomi)
    • Measured responce of LVDT sample. The signal was linear in 20mm range.
    • Found phase noise at the level of 10^-6m/rtHz.
    • Bracket for prototype is necessary.
    6-1 Design of EQ stop (Ishizaki)
    • Made 2D drawings for the bidding.
    • Tolerance and surface accuracy should be indicated.
    • The tolerance for the rods with the same length must be less than 0.2mm.
    • The specification document and drawings should be sent by the 12th.
    6-4 Design of release sensor (Sato)
    • Height of base was 56mm. Changed to 50mm.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • The length of Hook was reduced.
    9-1 Installation procedure (Takahashi)
    • The document will be revised by the review.
    9-3 Cable assembly (Sato)
    • Total 20 system.
    • 7 interfaces are necessary.

Next meeting: 2016/8/16 13:00

Type-A Meeting on 2016/8/1

2016/8/1 13:00 - 16:00 @Room210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • Made the model of EQ stop and pre-isolator.
    • Each filter is placed at the side stopper.
    • The IP is put on the top plate directly at present, but a gap is necessary.
    • Take account of stretch of the wires.
    0-2 Simulation (Okutomi)
    • Introduction of coupling to the yaw mode was wrong in the last calculation.
    • Updating the calculation.
    1-1 Clean booth (FCL)
    • The lighting is made by the LED inside the booth.
    3-2 Assembly of TF+IP (Sato)
    • The assembly work will be started on 30th August at the KAGRA site.
    3-5 ACC preparation (Sato)
    • Additional 3 sets have not been extracted yet.
    4-2,3 Standard filter (Hirata)
    • The 5th set was finished.
    5-1 Manufacturing of blade (Takahashi)
    • The thermal process for the blades was finished.
    5-6 Design of damper (Sato)
    • The plate for damper is independent of EQ stop frame.
    • Each LVDT has position adjustment.
    5-8 Test of LVDT (Okutomi)
    • Set the test bench for LVDT sample at ATC lab.
    • Making 2-pin lemo cables.
    • A summer student will join to the test.
    6-1 Design of EQ stop (Ishizaki)
    • Made 2D drawings for the bidding.
    • The date for the announce of bidding is the 17th August.
    • The specification document and drawings should be fixed by the 10th.
    6-3 Test of prototype (Ishizaki)
    • Tested connection and lift down of the EQ stop prototype on 27th July.
    6-4 Design of release sensor (Sato)
    • Set at 5mm under of each filter.
    • The shape of jigs will be modified with thick base.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • The bottom should be a breadboard with 50mm interval.
    9-1 Installation procedure (Takahashi)
    • The first draft was shown and discussed.
    • The height setting for each filter is important.

Next meeting: 2016/8/9 13:00

Type-A Meeting on 2016/7/26

2016/7/26 13:00 - 14:20 @Room210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assy. (Ishizaki)
    • The modeling of EQ stop was almost finished.
    • The model of chamber will be added to it.
    0-2 Simulation (Okutomi)
    • Calculated the effect due to actuation point for BF.
    • Noise will be induced to the actuators taking account of measured LVDT.
    1-1 Clean booth (FCL)
    • Design of suspended booth was shown.
    • The lighting is OK?
    3-2 Assembly of TF+IP (Sato)
    • Decision on the working place is under negosiation.
    • From August 30.
    3-5 ACC preparation (Sato)
    • Additional 3 sets will be taken by the end of July.
    4-2,3 Standard filter (Hirata)
    • The 4th set is on going.
    4-5 Procurement of damper magnet
    • Ordered.
    5-1 Manufacturing of blade (Takahashi)
    • Blades are in the thermal process.
    5-6 Design of damper (Sato)
    • Made drawings for LVDT prototype.
    • Make drawings for EQ stop side.
    5-8 Test of LVDT (Okutomi)
    • Set the sample from VIRGO in the 20m lab.
    • Making connector cables.
    • Micrometer stage and some jigs are necessary.
    6-1 Design of EQ stop (Ishizaki)
    • Made 3D model and 2D drawings.
    • Bottom support for the dummy payload is necessary.
    • Gap of the side stopper should be 10mm.
    • Adjustment of top ring position is not necessary.
    6-3 Test of prototype (Ishizaki)
    • Outer diameter of the plate was reduced on 20th.
    6-4 Design of release sensor (Sato)
    • The shape of jigs was modified with 30mm in height.
    • Gutter for cables is necessary.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • The height was reduced.
    9-3 Cable assembly (Sato)
    • This task was postponed.
    9-6 Protection net (Okutomi)
    • The smallest bolt size was M3.

Next meeting: 2016/8/1 13:00

Type-A Meeting on 2016/7/19

2016/7/19 13:00 - 15:00 @Room210

Participants: Takahashi, Ishizaki, Sato, Okutomi(Skype)

Minutes

  • 0-1 Assy, (Ishizaki)
    • The plate for BF is in the center of cross tube.
    0-2 Simulation (Okutomi)
    • Calculate the effect due to actuation point for BF.
    2-3 Setting of cross chamber (VAC)
    • Remained horizontal deviation between the top flange on the cryostat and the top chamber was 1-4mm.
    3-2 Assembly of TF+IP (Sato)
    • The assembly work was rescheduled. From the end of August at the site.
    3-5 ACC preparation (Sato)
    • Additional 3 sets will be taken from NM1 in TAMA by the end of July.
    • ACCs will be calibrated at the site.
    4-2,3 Standard filter (Hirata)
    • 3 sets were finished.
    5-1 Manufacturing of blade (Takahashi)
    • Blades are in the thermal process.
    5-6 Design of damper (Sato)
    • Samples of LVDT have been delivered from VIRGO.
    • Design work is going.
    6-1 Design of EQ stop (Ishizaki)
    • Made 3D model and some 2D drawings.
    • Guide for lift down is necessary.
    6-3 Test of prototype (Ishizaki)
    • Outer diameter of the plate will be reduced on 20th.
    6-4 Design of release sensor (Sato)
    • Length of the present lead cable is too short. Longer ones will be prepared for actual setup.
    7-2 Long Maraging rod (Takahashi)
    • Rod for cryo-payload should be lift down at beginning and fixed on the protection net temporally.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • Made drawings. The present design is too tall.
    • Confirm the height of mounted items.
    9-6 Protection net (Okutomi)
    • Check the small bolts size to decide the mesh of net.

Next meeting: 2016/7/26 13:00

Type-A Meeting on 2016/7/12

2016/7/12 11:00 - 12:30 @Kashiwa

Participants: Takahashi, Ishizaki(Skype), Sato, Okutomi

Minutes

  • 0-2 Simulation (Okutomi)
    • The frequency shift was due to damping model.
    • Setting for GAS filters was corrected.
    • Going BF damping simulation by manual tuning.
    • Result will be reported by the VIS meeting.
    2-3 Setting of cross chamber (VAC)
    • Horizontal position of the top flange on the cryostat was different from the center of the top chamber by 25mm along beam axis.
    3-2 Assembly of TF+IP (Sato)
    • The place should be in the center room of KAGRA considering DGS setup.
    3-5 ACC preparation (Sato)
    • 6 sets of ACC were measured.
    • Additional 3 sets will be taken from NM1 in TAMA on 14th.
    • Tube for the spot cooler was set.
    4-2,3 Standard filter (Hirata)
    • 2 sets were finished.
    5-1 Manufacturing of blade (Takahashi)
    • Cutting of 22 blades was finished.
    5-6 Design of damper (Sato)
    • Original design from VIRGO does not fit to the space around BF.
    • The bending point is higher than the suspension point.
    6-1 Design of EQ stop (Ishizaki)
    • Made outer shape of end plate.
    6-3 Test of prototype (Ishizaki)
    • Assembling of the EQ stop prototype was started.
    • Thin dummy weights were prepared.
    • I-bolts on the plate were interfered with connection rods.
    • Outer diameter of the stop plate was larger than inner diameter of the frame lock.
    6-4 Design of release sensor (Sato)
    • 3 sensors were attached to the plate for the prototype test.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • Circular type weight is suitable for combined dummy load.
    • Okutomi will send a cartoon soon.
    9-5 Installation
    • Protection for falling items is necessary. Check the small bolts size to decide the mesh of net.
    • Discuss on evacuation of the chamber.

Next meeting: 2016/7/19 13:00

Type-A Meeting on 2016/7/5

2016/7/5 13:00 - 14:00 @Kamioka

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-2 Simulation (Okutomi)
    • The frequency shift might be due to damping model.
    • Matlab model was remade.
    • Sensors and actuators were added to the BF stage.
    1-1 Clean Booth (FCL)
    • The booth will be ready in December.
    2-1 Setting of top chamber (VAC)
    • The schedule was shifted to December.
    2-3 Setting of cross chamber (VAC)
    • From 8th July, presence on 11th.
    3-2 Assembly of TF+IP (Sato)
    • The place should be considered again.
    3-5 ACC preparation (Sato)
    • 5 sets of ACC were measured.
    5-1 Manufacturing of blade (Takahashi)
    • Cutting of 12 blades was finished.
    5-2 Assembly of BF (Hirata)
    • Will be started in September.
    6-3 Test of prototype (Ishizaki)
    • The first setup and its procedure were shown.
    • Thin dummy weight and short hoock should be prepared.
    • Some cap screws on stop plates should be replaced to stop screws.
    6-4 Design of release sensor (Sato)
    • Under cable connection.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • Interferometer test was canceld.
    • The EQ stop and the dummy payload should be ordered together in August.
    9-2 Transportation to 2F (Takahashi, Ishizaki)
    • Situation of the Y-end was investigated.
    • Maximum box width, which can go through the tunnel, was 1.5m.
    • Access road from Mozumi entrance was improved.
    9-3 Cable assembly (Sato)
    • Ask CRY number of cables.

Next meeting: 2016/7/12 11:00

Type-A Meeting on 2016/6/28

2016/6/28 13:00 - 14:30 @The 4th meeting room

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assembly model (Ishizaki)
    • Made the test setup.
    0-2 Simulation (Okutomi)
    • No progress. The results will be reported in the next VIS meeting.
    1-1 Clean Booth (FCL)
    • Present design: The booth is hung from the ceiling.
    2-3 Setting of cross chamber (VAC)
    • From 8th July, presence on 11th.
    3-5 ACC preparation (Sato)
    • Working space: The 20m lab was arranged on 27th.
    4-3 Standard filter (Hirata)
    • Assembly of FR and measurement: 1 set was finished.
    5-1 Manufacturing of blade (Takahashi)
    • Cutting: 6 blades by July + 6 blades by Sep.
    5-6 Design of damper (Sato)
    • Device: It is difficult to put the devices at the center of suspension point.
    6-1 Design of EQ stop (Ishizaki)
    • Modeling: 3D model for the test setup was built.
    6-3 Test of prototype
    • Frame lock, extension rods, adjusters were delivered.
    • Hoist's tool will be necessary.
    • Test items related to the frame design have high priority. Target date is 22th July.
    6-4 Design of release sensor (Sato)
    • Bases and shims were delivered.
    • Plate additional machining: Delivery on 29th.
    • Circuit: LED box was made. Cabling has not been applied yet.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • Cartoon: Okutomi should send to Ishizaki soon!
    9-1 Establishment of procedure (Takahashi, Okutomi)
    • Test plan is made parallel with test work. Check the list of test items.
    9-2 Transportation to 2F (Takahashi, Ishizaki)
    • Situation of the site will be checked in 5-7th July.
    • Electric crawler is limitted, for example, for 200kg load.
    9-3 Cable assembly (Sato)
    • Number of cables: CRY will decide it by the end of June.

Next meeting: 2016/7/5 13:00

Type-A Meeting on 2016/6/21

2016/6/21 13:00 - 14:00 by Skype

Participants: Takahashi, Ishizaki, Sato

Minutes

  • 0-1 Assembly model (Ishizaki)
    • Made the test setup.
    0-2 Simulation (Okutomi)
    • Deadline: The end of June
    2-3 Setting of cross chamber (VAC)
    • Work: From 8th July, presence on 11th.
    3-5 ACC preparation (Sato)
    • Make working space in the 20m lab on 27th June.
    4-3 Standard filter (Hirata)
    • Assembly of FR and measurement: by August for 6 sets.
    4-5 Procurement of magnets (Takahashi)
    • Size: 13mm, 72PSC for each
    5-1 Manufacturing of blade (Takahashi)
    • Cutting: 6 blades by July + 6 blades by Sep.
    5-6 Design of damper (Sato)
    • Device: The last one was too small, actually about 125mm. Design for vertical as well.
    6-1 Design of EQ stop (Ishizaki)
    • Modeling: 3D model for the test setup was build.
    6-3 Test of prototype
    • Frame lock: Delivered by 24th.
    • Other parts (rod, adjuster, bolts) will be ordered.
    6-4 Design of release sensor (Sato)
    • Base: Making in ATC.
    • Plate additional machining: Ordered.
    • Circuit: LED will be tested.
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • Cartoon: Okutomi should send to Ishizaki soon!
    • Mirror holder: Refer the mirror box for PR.
    9-1 Establishment of procedure (Takahashi, Okutomi)
    • Test plan: Check FR for 2 BFs.
    9-3 Cable assembly
    • Number of cables: Thermocouples are added. Ask Tomaru total number.

Next meeting: 2016/6/28 13:00

Type-A Meeting on 2016/6/14

2016/6/14 13:00 - 15:00 @ Room 210

Participants: Takahashi, Ishizaki, Sato, Okutomi

Minutes

  • 0-1 Assembly model (Ishizaki)
    • Step: From EQ stop, next with chamber.
    0-2 Simulation (Okutomi)
    • Problem: Conversion to Simulink was ok. The structure of control has a problem in Matlab. Reconstructing now.
    3-5 ACC preparation (Sato)
    • Space: Make working space in the 20m lab.
    5-1 Manufacturing of blade (Takahashi)
    • Design: 5 blades are used for 200kg load.
    5-6 Design of damper (Sato)
    • Device: Asking design of LVDT-Act. to VIRGO. The device is located at the center of mass.
    6-1 Design of EQ stop (Ishizaki)
    • Structure analysis: Two cases were calculated. Share stress was 1/6 of limit, and principal stress was 1/7 of limit respectively in the maximum case.
    • Modeling: Making with consideration of procedure and tools.
    • Frame lock: Maximum stress was 160MPa with thickness of 30mm (limit 180MPa).
    6-4 Design of release sensor (Sato)
    • Position: Inner side of the stage. Need to addtional machining to the EQ stop plate.
    • Electronics: Circuit is simple in the test (handmade).
    8-1 Design of dummy payload (Okutomi, Ishizaki)
    • Condition: 25cm mirror, alignment by moving mass. Make a cartoon.
    • Actuation: Length control is necessary? Check PZT actuator.
    9-1 Establishment of procedure (Takahashi, Okutomi)
    • Test plan: Prepare for 2 sets of release sensors. Check FR for 2 BFs.

Next meeting: 2016/6/21 13:00