Things to remember/fix Things to remember/fix after BS Test Hang, before final hanging of BS.

 * Remove cling wrap in BF and install vacuum-compatible heat shrink.
 * Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter).
 * Rewire PI horizontal steppers with vacuum-compatible cable.
 * Swap out temporary ballast mass in BF.
 * If possible, fix galled pole in BF level of EQ stop.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

KAGRA VIS - Type B - BS Test Hang Issues

Things to remember/fix after BS Test Hang, before final hanging of BS.

  • Remove cling wrap in BF and install vacuum-compatible heat shrink.
  • Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter).
  • Rewire PI horizontal steppers with vacuum-compatible cable.
  • Swap out temporary ballast mass in BF.
  • If possible, fix galled pole in BF level of EQ stop.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.