Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Type B Past Week Summary
Fabian worked on IM and dummy BS assembly: photos1, photos2
- A hole in a picomotor holder was too small. ATC staff solved this isue quickly and Hirata-san cleaned the piece.
- Some ballast discs for the dummy optic were dirty (seen by visual inspection). Hirata-san cleaned them.
- Some arrows were cleaned from the mirrors for the dummy optic.
- Hirata-san worked on checking Mirapro's assembly frame design - some minor issues with rail system found.
- Hirata-san measured another filter.
- Hirata-san washed a large batch of parts.
Mark worked on solutions to allow a larger mirror on dummy BS
- Mark worked on list of items for purchase in FY2016.
Mark worked more on E1504235 BS Assembly Procedure (Draft on OneDrive)