Scraps of text for incorporation in the VIS Meeting Minutes

KAGRA/Subgroups/VIS/MeetingNAOJ

Type B

Report for the week of the 19th of October 2020.

[Fabian]

General

Type B

Report of the week of the 12th of October

Type B

Report of the week of the 28th of Septermber

Type B

Report for the week of the 7th of September 2020.

Type B

Report for the week of the 27th of April 2020.

In the context of the Type-B paper I checked the noise level of the gephones: I did a calculation of the expected sensitivity and campared with Fujii-kun's measurements:

In the context of the writing

Type B

Report

Report

Report for the week 16-12-2019

Plan for next week

Report for the week 09-12-2019

Plan for next week

Vacation/Travel Info

Type B

Report for the week 23-09-2019

Plan for next week

Vacation/Travel Info

Report for the week 23-09-2019

Plan for next week

Vacation/Travel Info

Type B

Report for the week 13-09-2019

Type B

Report for the week 02-09-2019

Plan for next week

Report for the week 26-08-2019 (Written by Fabian)

Plan for the week 02-09-2019

Type B

Report for the week 15-08-2019 (Written by Fabian)

Plan for the week 19-08-2019

Type B

Report for the week 05-08-2019 (Written by Fabian)

Plan for the week 15-08-2019

Report for the week 7/29 (Written by Fabian)

Plan for the week 8/5

Type B

Report for the week 7/22 (Written by Fabian)

Plan for the week 7/29

Vacation/Travel Info

Type B (Mark)

Report for the week 7/15 (Written by Fabian)

Plan for the week 7/22

Vacation/Travel Info

Type B (Mark)

Report for the week 7/8 (Written by Fabian)

Plan for the week 15/8

Vacation/Travel Info

Type B (Mark)

Report for the week 7/1 (Written by Fabian)

Plan for the week 7/8

Type B (Mark)

Report for the week 6/24 (Written by Terrence and Fabian)

Plan for the week 7/1

Vacation/Travel Info

Type B (Mark)

Report for the week 6/17

Plan for the week 6/24

Vacation/Travel Info

Type B (Mark)

Report for the week 6/10

BS

Type B (Mark)

Report for the week 6/3

SRM Inertial Damping and Residual Motion Stuff

RMS Displacement:

Requirement

Result

L

0.4 µm

0.1076 µm

P

1 µrad

0.0569 µrad

Y

1 µrad

0.0598 µrad

RMS Velocity:

Requirement

Result

L

0.5 µm

0.1014 µm/s

P

/

0.2165 µrad/s

Y

/

0.1776 µrad/s

SR3 Inertial Damping

Type B (Mark)

Report for the week 5/27 (written by Fabian)

Type B (Mark)

Report for the week 5/20 (written by Fabian)

Plan for the week 5/25

Report for Golden Week

Report for the week of 5/6

Report for week of 5/13

Plan for week of 5/20

Vacation/Travel Info