Line 3: Line 3:
To-Do List 2017-03-13 [[../ToDoOld|Archived To-Do Items]]
Line 5: Line 5:
== Facilities ==
 * Vacuum and roll floor (All)
 * Wipe ladders (All)
 * Tidy tools, parts (All)
 * Find missing light lent to Kokeyama-san (Mark)
 * Mark/photograph/count peeling patches on the floor.
 * Mark/photograph/count pillars with bare concrete bases.
[[../BSTestHangIssues|Issues to fix after BS Test Hang]]
Line 13: Line 7:
== Electronics == == Every Week ==
=== Facilities ===
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
Line 15: Line 13:
 * Wire up BF roll/pitch picos (Enzo)
 * Work with Miyo-kun to get pico drivers added to BS rack and screens (Enzo, Mark)
 * Grab remaining cables etc per E1605111 and update document (Enzo)
 * Update E1503600 with DIO card for HPCDs, etc, etc. (Enzo)
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san (Enzo, Mark)
 * Debug 900 Hz noise on BF LVDT output (Enzo, Mark)
 * Debug excess noise on TM-H3 OSEM (Enzo, Mark)
== 2017-05-29 ==

=== Facilities ===

=== Design/Purchasing ===
 * Order longer threaded rods for arc weights on PI.
 * Get more cable ties.
 * Get another D-Sub breakout.

=== Main Assembly ===
 * Reinstall blades in LBB blade units.
 * Do load test on LBB blade units.
 * Try rearranging arc weights to make room for magic wand.
 *

=== Electronics ===
 * Route BF/... cabling up past SF to PI.
 * Route SF cabling up to PI.
 * Add Type 3 extensions to SF/... cables.
 * Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame).
 * Move in-air cabling to match flange positions.
 * Cable and test PI vertical LVDT.
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Cable and test PI yaw stepper.
 * Cable and test PI vertical stepper.
 * Cable and test PI horizontal steppers.
 * Cable and test PI horizontal LVDTs.
 * Calibrate PI horizontal LVDTs.

=== Real-time and SUMCON models ===
 * Check PI section of k1visbs model.
Line 24: Line 46:
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== PI Prep ==
 * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
 * Identify missing PI parts (Hirata, Mark)
 * Find and reattach repaired LVDT coil(s) (???)

== Hanging BF/IRM/IM/RM/BS ==
 * Correct orientation of SF cap (Mark, Fabian, Perry)
 * Correct orientation of SF (Mark, Fabian, Perry)
 * Find/attach cable clamps for SF (Fabian)

== Real-time and SUMCON models ==
 * Update SUMCON model of full BS (Perry?, Okitomi?, Mark?)
 * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
 * Compare measured TFs to cut-down model
 * Create a proper DAC Monitor MEDM screen
 * Improve ADC Monitor MEDM screen
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.

VIS Type B Near Term To-Do List

Archived To-Do Items

Issues to fix after BS Test Hang

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

2017-05-29

Facilities

Design/Purchasing

  • Order longer threaded rods for arc weights on PI.
  • Get more cable ties.
  • Get another D-Sub breakout.

Main Assembly

  • Reinstall blades in LBB blade units.
  • Do load test on LBB blade units.
  • Try rearranging arc weights to make room for magic wand.

Electronics

  • Route BF/... cabling up past SF to PI.
  • Route SF cabling up to PI.
  • Add Type 3 extensions to SF/... cables.
  • Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame).
  • Move in-air cabling to match flange positions.
  • Cable and test PI vertical LVDT.
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Cable and test PI yaw stepper.
  • Cable and test PI vertical stepper.
  • Cable and test PI horizontal steppers.
  • Cable and test PI horizontal LVDTs.
  • Calibrate PI horizontal LVDTs.

Real-time and SUMCON models

  • Check PI section of k1visbs model.
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.