To-Do List 2017-03-13 [[../ToDoOld|Archived To-Do Items]]
Line 5: Line 5:
== Facilities ==
 * Vacuum and roll floor (All)
 * Wipe ladders (All)
 * Tidy tools, parts (All)
 * Find missing light lent to Kokeyama-san (Mark)
 * Mark/photograph/count peeling patches on the floor.
 * Mark/photograph/count pillars with bare concrete bases.
[[../BSTestHangIssues|Issues to fix after BS Test Hang]]
Line 13: Line 7:
== Electronics == == Every Week ==
=== Facilities ===
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
Line 15: Line 13:
 * Wire up BF roll/pitch picos (Enzo)
 * Work with Miyo-kun to get pico drivers added to BS rack and screens (Enzo, Mark)
 * Grab remaining cables etc per E1605111 and update document (Enzo)
 * Update E1503600 with DIO card for HPCDs, etc, etc. (Enzo)
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san (Enzo, Mark)
 * Debug 900 Hz noise on BF LVDT output (Enzo, Mark)
 * Debug excess noise on TM-H3 OSEM (Enzo, Mark)
== Longer Term ==

=== Design/Purchasing ===
 * Do rough mass budget for SR2/SR3/SRM.
 * Design SR assembly frame.
 * Get another D-Sub breakout (Hirata).
 * Design final SF ballast masses (Fabian).
 * Finish/post assembly drawing for LBB and LBB damper ring (Hirata).
 * Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
 * If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).

=== Real-time and SUMCON models ===
 * --(Adjust OSEM ADC and DAC channel assignments to match cabling changes.)--
 * --(Check PI section of k1visbs model.)--
Line 24: Line 28:
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)  * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.
Line 26: Line 35:
== PI Prep ==
 * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
 * Identify missing PI parts (Hirata, Mark)
 * Find and reattach repaired LVDT coil(s) (???)
== 2017-06-12 ==
Line 31: Line 37:
== Hanging BF/IRM/IM/RM/BS ==
 * Correct orientation of SF cap (Mark, Fabian, Perry)
 * Correct orientation of SF (Mark, Fabian, Perry)
 * Find/attach cable clamps for SF (Fabian)
=== Facilities ===
Line 36: Line 39:
== Real-time and SUMCON models ==
 * Update SUMCON model of full BS (Perry?, Okitomi?, Mark?)
 * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
 * Compare measured TFs to cut-down model
 * Create a proper DAC Monitor MEDM screen
 * Improve ADC Monitor MEDM screen
=== Main Assembly ===
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * --(Check pitch/roll of SF and adjust trim as required.)--
 * --(Prepare LBB.)--
  * --(Attach LBB outriggers and rod receptacles.)--
 * --(Prepare LBB Cu ring.)--
  * --(Remove from tank, fix incompletely threaded holes, reinstall in tank.)--
  * --(Lay down spacers to protect magnets (in next step).)--
 * --(Prepare LBB magnet ring.)--
  * --(Disassemble.)--
  * --(Pass pieces into tank.)--
  * --(Reassemble on top of Cu ring.)--
 * --(Install LBB damper.)--
  * --(Bind LBB damper rings together with slings.)--
  * --(Remove vacuum tank lid and ring.)--
  * --(Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.)--
 * Crane suspension into tank.
 * Hook LBB Cu ring.
 * Hook LBB.
 * Crane vacuum tank lid+ring black on.
 * Remove vacuum tank lid (only).
 * Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
 * Reconnect in-air cables.

=== Electronics ===
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * --(Cable and test PI yaw stepper.)--
 * --(Cable and test PI vertical stepper.)--
 * --(Cable and test PI horizontal steppers.)--
 * --(Cable and test PI horizontal LVDTs.)--
 * Calibrate PI horizontal LVDTs.
 * --(Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.)--
 * --(Recount cables in box and in test hang, and update Sato-san's spreadsheet.)--
 * --(Cable and test PI vertical LVDT.)--
 * --(Debug/fix PI vertical LVDTs #0 and #2.)--
 * --(Debug/fix geophone #1.)--

VIS Type B Near Term To-Do List

Archived To-Do Items

Issues to fix after BS Test Hang

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

Longer Term

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.
  • Get another D-Sub breakout (Hirata).
  • Design final SF ballast masses (Fabian).
  • Finish/post assembly drawing for LBB and LBB damper ring (Hirata).
  • Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
  • If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).

Real-time and SUMCON models

  • Adjust OSEM ADC and DAC channel assignments to match cabling changes.

  • Check PI section of k1visbs model.

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

2017-06-12

Facilities

Main Assembly

  • Unlock BF keystone and try running BF fishing rod to fix sag problem.
  • Check pitch/roll of SF and adjust trim as required.

  • Prepare LBB.

    • Attach LBB outriggers and rod receptacles.

  • Prepare LBB Cu ring.

    • Remove from tank, fix incompletely threaded holes, reinstall in tank.

    • Lay down spacers to protect magnets (in next step).

  • Prepare LBB magnet ring.

    • Disassemble.

    • Pass pieces into tank.

    • Reassemble on top of Cu ring.

  • Install LBB damper.

    • Bind LBB damper rings together with slings.

    • Remove vacuum tank lid and ring.

    • Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.

  • Crane suspension into tank.
  • Hook LBB Cu ring.
  • Hook LBB.
  • Crane vacuum tank lid+ring black on.
  • Remove vacuum tank lid (only).
  • Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
  • Reconnect in-air cables.

Electronics

  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Cable and test PI yaw stepper.

  • Cable and test PI vertical stepper.

  • Cable and test PI horizontal steppers.

  • Cable and test PI horizontal LVDTs.

  • Calibrate PI horizontal LVDTs.
  • Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.

  • Recount cables in box and in test hang, and update Sato-san's spreadsheet.

  • Cable and test PI vertical LVDT.

  • Debug/fix PI vertical LVDTs #0 and #2.

  • Debug/fix geophone #1.