Differences between revisions 44 and 46 (spanning 2 versions)
Revision 44 as of 2017-05-26 13:48:12
Size: 1756
Editor: MarkBarton
Comment:
Revision 46 as of 2017-06-05 15:44:29
Size: 2006
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
== 2017-05-29 == == Longer Term ==
 * Do rough mass budget for SR2/SR3/SRM.
 * Design SR assembly frame.

== 2017-06-06 ==
Line 18: Line 22:
 * Order longer threaded rods for arc weights on PI.
 * Get more cable ties.
 * Get another D-Sub breakout.
 * Get another D-Sub breakout (Hirata).
 * Design final SF ballast masses (Fabian).
 * Finish/post assembly drawing for LBB and LBB damper ring (Hirata).
 * Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
 * If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).
Line 23: Line 29:
 * Reinstall blades in LBB blade units.
 * Do load test on LBB blade units.
 * Try rearranging arc weights to make room for magic wand.
 *
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * Check pitch/roll of SF and adjust trim as required.
Line 29: Line 33:
 * Route BF/... cabling up past SF to PI.
 * Route SF cabling up to PI.
 * Add Type 3 extensions to SF/... cables.
 * Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame).
 * Move in-air cabling to match flange positions.
 * Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.
 * Recount cables in box and in test hang, and update Sato-san's spreadsheet.
Line 44: Line 45:
 * Adjust OSEM ADC and DAC channel assignments to match cabling changes.

VIS Type B Near Term To-Do List

Archived To-Do Items

Issues to fix after BS Test Hang

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

Longer Term

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.

2017-06-06

Facilities

Design/Purchasing

  • Get another D-Sub breakout (Hirata).
  • Design final SF ballast masses (Fabian).
  • Finish/post assembly drawing for LBB and LBB damper ring (Hirata).
  • Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
  • If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).

Main Assembly

  • Unlock BF keystone and try running BF fishing rod to fix sag problem.
  • Check pitch/roll of SF and adjust trim as required.

Electronics

  • Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.
  • Recount cables in box and in test hang, and update Sato-san's spreadsheet.
  • Cable and test PI vertical LVDT.
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Cable and test PI yaw stepper.
  • Cable and test PI vertical stepper.
  • Cable and test PI horizontal steppers.
  • Cable and test PI horizontal LVDTs.
  • Calibrate PI horizontal LVDTs.

Real-time and SUMCON models

  • Adjust OSEM ADC and DAC channel assignments to match cabling changes.
  • Check PI section of k1visbs model.
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)