== 2017-06-06 ==

=== Facilities ===

=== Design/Purchasing ===
Line 28: Line 24:
=== Main Assembly ===
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * Check pitch/roll of SF and adjust trim as required.

=== Electronics ===
 * --(Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.)--
 * --(Recount cables in box and in test hang, and update Sato-san's spreadsheet.)--
 * --(Cable and test PI vertical LVDT.)--
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Cable and test PI yaw stepper.
 * Cable and test PI vertical stepper.
 * Cable and test PI horizontal steppers.
 * --(Cable and test PI horizontal LVDTs.)--
 * Calibrate PI horizontal LVDTs.
Line 45: Line 25:
 * Adjust OSEM ADC and DAC channel assignments to match cabling changes.
 * Check PI section of k1visbs model.
 * --(Adjust OSEM ADC and DAC channel assignments to match cabling changes.)--
 * --(Check PI section of k1visbs model.)--
Line 54: Line 34:

== 2017-06-12 ==

=== Facilities ===

=== Main Assembly ===
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * --(Check pitch/roll of SF and adjust trim as required.)--
 * --(Prepare LBB.)--
  * --(Attach LBB outriggers and rod receptacles.)--
 * --(Prepare LBB Cu ring.)--
  * --(Remove from tank, fix incompletely threaded holes, reinstall in tank.)--
  * --(Lay down spacers to protect magnets (in next step).)--
 * --(Prepare LBB magnet ring.)--
  * --(Disassemble.)--
  * --(Pass pieces into tank.)--
  * --(Reassemble on top of Cu ring.)--
 * --(Install LBB damper.)--
  * --(Bind LBB damper rings together with slings.)--
  * --(Remove vacuum tank lid and ring.)--
  * --(Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.)--
 * Crane suspension into tank.
 * Hook LBB Cu ring.
 * Hook LBB.
 * Crane vacuum tank lid+ring black on.
 * Remove vacuum tank lid (only).
 * Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
 * Reconnect in-air cables.

=== Electronics ===
 * Cabling:
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * --(Cable and test PI yaw stepper.)--
 * --(Cable and test PI vertical stepper.)--
 * --(Cable and test PI horizontal steppers.)--
 * --(Cable and test PI horizontal LVDTs.)--
 * Calibrate PI horizontal LVDTs.
 * --(Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.)--
 * --(Recount cables in box and in test hang, and update Sato-san's spreadsheet.)--
 * --(Cable and test PI vertical LVDT.)--
 * --(Debug/fix PI vertical LVDTs #0 and #2.)--
 * --(Debug/fix geophone #1.)--
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * --(Cable and test PI horizontal LVDTs.)--
 * Calibrate PI horizontal LVDTs.

VIS Type B Near Term To-Do List

Archived To-Do Items

Issues to fix after BS Test Hang

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

Longer Term

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.
  • Get another D-Sub breakout (Hirata).
  • Design final SF ballast masses (Fabian).
  • Finish/post assembly drawing for LBB and LBB damper ring (Hirata).
  • Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
  • If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).

Real-time and SUMCON models

  • Adjust OSEM ADC and DAC channel assignments to match cabling changes.

  • Check PI section of k1visbs model.

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

2017-06-12

Facilities

Main Assembly

  • Unlock BF keystone and try running BF fishing rod to fix sag problem.
  • Check pitch/roll of SF and adjust trim as required.

  • Prepare LBB.

    • Attach LBB outriggers and rod receptacles.

  • Prepare LBB Cu ring.

    • Remove from tank, fix incompletely threaded holes, reinstall in tank.

    • Lay down spacers to protect magnets (in next step).

  • Prepare LBB magnet ring.

    • Disassemble.

    • Pass pieces into tank.

    • Reassemble on top of Cu ring.

  • Install LBB damper.

    • Bind LBB damper rings together with slings.

    • Remove vacuum tank lid and ring.

    • Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.

  • Crane suspension into tank.
  • Hook LBB Cu ring.
  • Hook LBB.
  • Crane vacuum tank lid+ring black on.
  • Remove vacuum tank lid (only).
  • Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
  • Reconnect in-air cables.

Electronics

  • Cabling:
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Cable and test PI yaw stepper.

  • Cable and test PI vertical stepper.

  • Cable and test PI horizontal steppers.

  • Cable and test PI horizontal LVDTs.

  • Calibrate PI horizontal LVDTs.
  • Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.

  • Recount cables in box and in test hang, and update Sato-san's spreadsheet.

  • Cable and test PI vertical LVDT.

  • Debug/fix PI vertical LVDTs #0 and #2.

  • Debug/fix geophone #1.

  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Cable and test PI horizontal LVDTs.

  • Calibrate PI horizontal LVDTs.