Differences between revisions 47 and 50 (spanning 3 versions)
Revision 47 as of 2017-06-09 13:35:14
Size: 2030
Editor: MarkBarton
Comment:
Revision 50 as of 2017-06-16 16:38:22
Size: 2279
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:

=== Design/Purchasing ===
Line 16: Line 18:

== 2017-06-06 ==

=== Facilities ===

=== Design/Purchasing ===
Line 28: Line 24:
=== Main Assembly ===
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * Check pitch/roll of SF and adjust trim as required.

=== Electronics ===
 * --(Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.)--
 * --(Recount cables in box and in test hang, and update Sato-san's spreadsheet.)--
 * --(Cable and test PI vertical LVDT.)--
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Cable and test PI yaw stepper.
 * Cable and test PI vertical stepper.
 * Cable and test PI horizontal steppers.
 * --(Cable and test PI horizontal LVDTs.)--
 * Calibrate PI horizontal LVDTs.
Line 45: Line 25:
 * Adjust OSEM ADC and DAC channel assignments to match cabling changes.
 * Check PI section of k1visbs model.
Line 54: Line 32:

== BS Prism/Flag Gluing ==
 * Locate new flags (Mitaka?).
 * Locate mirror box (Mitaka).
 * Locate prisms (Mitaka?).
 * Arrange time with Hirose-san.
 * Launder, pack clean suits etc for Kashiwa.

== 2017-06-19 ==

=== Facilities ===
 * Remove cling wrap from stuff.
 * Plug stuff back in (charging station, KOACH filters, OL etc).
 * Power up rack.

=== Main Assembly ===
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * Do up all EQ stops etc (except SF).
 * Remove geophones.
 * Crane suspension into tank.
 * Hook LBB Cu ring.
 * Hook LBB.
 * Crane vacuum tank lid+ring black on.
 * Remove vacuum tank lid (only).

=== Electronics ===
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
 * Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
 * Reconnect in-air cables.

=== Real-time and SUMCON models ===
 * Derive and install PI LVDT matrices.
 * Check LSOL section of k1visbs model.
 *

VIS Type B Near Term To-Do List

Archived To-Do Items

Issues to fix after BS Test Hang

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

Longer Term

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.
  • Get another D-Sub breakout (Hirata).
  • Design final SF ballast masses (Fabian).
  • Finish/post assembly drawing for LBB and LBB damper ring (Hirata).
  • Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
  • If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).

Real-time and SUMCON models

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.

BS Prism/Flag Gluing

  • Locate new flags (Mitaka?).
  • Locate mirror box (Mitaka).
  • Locate prisms (Mitaka?).
  • Arrange time with Hirose-san.
  • Launder, pack clean suits etc for Kashiwa.

2017-06-19

Facilities

  • Remove cling wrap from stuff.
  • Plug stuff back in (charging station, KOACH filters, OL etc).
  • Power up rack.

Main Assembly

  • Unlock BF keystone and try running BF fishing rod to fix sag problem.
  • Do up all EQ stops etc (except SF).
  • Remove geophones.
  • Crane suspension into tank.
  • Hook LBB Cu ring.
  • Hook LBB.
  • Crane vacuum tank lid+ring black on.
  • Remove vacuum tank lid (only).

Electronics

  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.
  • Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
  • Reconnect in-air cables.

Real-time and SUMCON models

  • Derive and install PI LVDT matrices.
  • Check LSOL section of k1visbs model.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)