VIS Meeting on 2015/11/13
2015/11/13 13:30 -
Kamioka TV conference room + SeeVogh
Participants:
Schedule
- Schedule Plan (Aso)
PR
- Test Hanging Status (Takahashi)
- Payload weight issue (Takahashi)
- OSEM check (Shoda, Okutomi ?)
- Digital system (Shoda, Okutomi, Fujii)
- Cable status (Takahashi)
- Clean work procedure (Takahashi, Hirose)
- PR CAD model and assembly drawings (Hirata)
- Additional PR mirror box (Tatsumi)
- Production of additional PR winches (Akutsu)
- PR Optical Bench (Akutsu)
- RM compensation mass: do we have enough of them ? (Fabian)
Having some problem with screw model in CAD (density was wrong). -> Status ?
We should order compensation masses with various thickness (Takahashi) -> Status ?
- RM EQ stop screw position (Hirata)
- Next week (from 11/16) plan (Aso)
- Mechanical Assembly (Takahashi, Shoda, Mark, Fabian, Fujii, Okutomi)
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
- Travel plan
- Takahashi:
- Shoda:
- Fujii:
- Okutomi:
- Fabian:
- Mark:
- Ohishi:
- Aso: Mitaka on Mon
- Mechanical Assembly (Takahashi, Shoda, Mark, Fabian, Fujii, Okutomi)
BS
- BS Assembly Frame Design (Aso, Hirata)
- BS magnet size (Michimura)
IM magnet size: -> Shimoda report
- Who will design the new flag ?
- BS gluing jigs (Tatsumi)
- Not enough crane height problem (Hirata, Saito)
- IP Base Clamp (Fabian)
- Bread board springs (Takahashi)
- BS clean bag (Aso)
ETM
- Installation procedure (Takahashi)
Other
- Cleaning of the chamber (Aso)
- Clean suits (Aso)
- Watch dog system (Tanaka)
- Magnetism of the OSEM screw (Akutsu)
- GAS blade inspection by Virgo (Takahashi)
- Safety at the site (Takahashi, Ishizaki)
Next meeting
2015/11/20(Fri) 13:00