Differences between revisions 9 and 10
Revision 9 as of 2016-01-29 16:27:56
Size: 10926
Editor: YoichiAso
Comment:
Revision 10 as of 2016-01-29 17:09:17
Size: 11015
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 33: Line 33:
  * They were taken out.   * They were taken out. Handed to IOO.
Line 55: Line 55:
  * Plastic container -> Delivery date 2/2
 * Dummy mirror: Now preparing in Kamioka
  * Plastic container -> Delivery date 2/2(Kashiwa) 2/4 (Mitaka)
 * Dummy mirror: To glue the magnets
Line 59: Line 59:
  * Winding tools: Stocked in the 20m lab.''' '''-> Delivered to Kamioka. Checked it works.
  * Two of Ando lab. students will come to Kamioka to wind the coils from 2/8.Will work in PR3 clean booth.
  * Winding tools: Stocked in the 20m lab.''' '''-> Delivered to Kamioka. Will do test winding on Wed and Thu next week (Takahashi).
  * Two of Ando lab. students will come to Kamioka to wind the coils from 2/8. Will work in PR3 clean booth.
Line 90: Line 90:
  * Inscription of the number on the BF #1 and BS BF should be done.-> Will be done on 1/26. Also plan to install LVDT coils and check the optimal load of BF #5 and #6.   * Inscription of the number on the BF #1 and BS BF. Installation of LVDT coils. Check the optimal load of BF #5 and #6.
Line 95: Line 95:
  * Need to send the wire clams used for the test hanging to I-ject: will send them to I-ject on Monday (Takahashi)   * Need to send the wire clamps used for the test hanging to I-ject: will send them to I-ject on Monday (Takahashi)
Line 98: Line 98:
  * Need to send the old winches back to ATC for repair. Was shipped to Mitaka today. '''We need a coordination with Ikenoue-san for this work (Takahashi) '''   * Shipped to Mitaka today. '''We need a coordination with Ikenoue-san for this work (Takahashi) '''
Line 134: Line 134:
  * [[attachment:20151225_081424000_iOS.png|A diagram from Shoda]]
Line 136: Line 135:
  * Review of PR3 electronics early February-> 2/4 after the group meeting   * Review of PR3 electronics early February-> '''2/4 after the group meeting. '''
Line 164: Line 163:
 * Wire breaker problem (Mark, Tatsumi)
  * Prism removal from PR2
 * Wire breaker problem
  * Prism removal from PR2 (Hirose, Mark)
Line 167: Line 166:
  * BS prism preparation
   * Contacted the company LIGO used for the possibility of buying sapphire prisms (Mark)
   * They are happy to take an order. No Japanese agent. But international order can be taken.
   * Will ask for the lead time to the company (Mark) [[attachment:JGW-D1504344_rev2.pdf|Drawing to be sent]] ([[attachment:D0810033_ADLIGO SUS IMC_PRISM_BREAKOFF_WIRE LOOP_TEST MASS.pdf|LIGO drawing]]) -> Send the drawing to company immediately
  * Can we make SR wire breakers bigger ?
   * Asked Fuskushima-san about the possibility of widening the slits (Takahashi) -> It is possible but there is a risk of slight deformation.
   * We will try to widen the slit using the dirty RM used for the test hanging.
   * We need to decide on how much to widen. Check what happens if we use 5mm tall prism on CAD (Hirata) -> [[attachment:wire and groove position.pdf|Result]]
    * Make the slit wider by 3mm will cut a M5 threaded hole -> Can make a new M5 hole.
    * See what happens if we do that (Hirata) then talk to ATC
    * Check if the BS prism can be used
Line 186: Line 174:
 * BS prism preparation
  * Contacted the company LIGO used for the possibility of buying sapphire prisms (Mark)
  * They are happy to take an order. No Japanese agent. But international order can be taken.
  * Will ask for the lead time to the company (Mark) [[attachment:JGW-D1504344_rev2.pdf|Drawing to be sent]] ([[attachment:D0810033_ADLIGO SUS IMC_PRISM_BREAKOFF_WIRE LOOP_TEST MASS.pdf|LIGO drawing]]) -> '''Send the drawing to the companies immediately '''
 * Can we make SR wire breakers bigger ?
  * Asked Fuskushima-san about the possibility of widening the slits (Takahashi) -> It is possible but there is a risk of slight deformation.
  * We will try to widen the slit using the dirty RM used for the test hanging.
  * We need to decide on how much to widen. Check what happens if we use 5mm tall prism on CAD (Hirata) -> [[attachment:wire and groove position.pdf|Result]]
   * Make the slit wider by 3mm will interfere with a M5 threaded hole
    * The hole is needed to keep the mechanical rigidity
    * Can make a new M5 hole somewhere near by ?
   * Check what happens if we widen the slit by 3.75mm and make a new M5 (Hirata)
    * Then we will talk to Fukushima-san again
   * If the design of the SR prisms can be the same as BS, it will be a good idea to order them at once.
    * Check if the BS prism can be used(Mark)
Line 187: Line 190:
  * Flag is too tall ? (Raffaele) Make the foot print smaller to reduce thermal noise ? (Aso)
  * Mark's calculations[[http://%20http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3239|http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3239]]
 * IP base clamp (Fabian): [[attachment:image.png|Picture]] -> Reduce the number of clamps -> order.
  * Some concerns
   * Flag is too tall ? (Raffaele)
   * Make the foot print smaller to reduce thermal noise ? (Aso)
  * '''Mark will sort out the ideas and organize a specialized meeting.'''
 * IP base clamp (Fabian): [[attachment:image.png|Picture]] -> '''Reduce the number of clamps'''
Line 221: Line 226:

VIS Meeting on 2016/1/29

2015/1/29 13:30 -

Kamioka TV conference room + SeeVogh

Participants:Takahashi, Fujii, Okutomi, Aso, Shoda, Hirata, Tanaka, Ishizaki, Mark, Fabian, Akutsu, Tatsumi, Joris

Schedule

  • Schedule status (Aso)
  • Cleaning of PRM and PR3 chamber from 2/1-2/3. PR2 and BS chambers from 2/4 - 2/6.

PR3

  • PR3 Installation Status (Takahashi)
    • An OSEM flag and a 2nd wire breaker came off. We had a special meeting on this.
    • PR3 dusts: leave them until bKAGRA when we replace the 1st prisms (recommendation from Hirose).
    • #Traverser repair: Repair of the broken ones at Mitaka -> Uraguchi-san is working on it.

    • #Screws to fix the front and back rings the RM were too long, or the tapping in the holes were too short. Couldn't use M5x40. Ordered M5x35 with vent holes. -> Delivered. Remember to replace them

  • PR3 flag and 2nd wire breaker repair status (Tatsumi)
    • Weekly Report

    • Flags and wire breakers will be brought back to Mitaka by Takahashi-san tonight
    • Ishizaki-san will transport PR3 to Kamioka on Friday together with PRM
  • The frame for the clean bag is bent. Aso will contact Mirapro for a stronger frame.

Plan for the next week

  • Mon: Chamber cleaning
  • Tue: Chamber cleaning
  • Wed: Chamber cleaning
  • Thu:
  • Fri:

PR2

  • IOO wants the optical bench back (Aso)
    • They were taken out. Handed to IOO.
  • #OpLev interference check (Akutsu)

Plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

iKAGRA ETM suspension

  • Disassembly (and cleaning) of the suspensions (Ohishi)
    • Everything was cleaned and shipped to Kamioka
  • Assembly of the suspension
    • Damaged one vertical spring -> Replace with CLIO ones (all 4 of them to maintain the balance)

  • Preparation of missing parts (Tatsumi, Takahashi)
    • Connectors: Will use two D-SUB9, one for coils and another one for Pico-motors
    • Plates to fix the connectors on the suspension frame were ordered. -> Expected delivery date Feb. 4th.

    • We have connector shells, pins and cables.
    • Coil bobin: Delivery date-> Feb. 4th.

  • PRM transportation (Tatsumi)
    • Thin plates to protect magnets arrived
    • Plastic container -> Delivery date 2/2(Kashiwa) 2/4 (Mitaka)

  • Dummy mirror: To glue the magnets
  • Coil winding (Takahashi)
    • Wires: will use the capton wires prepared for the LVDT coils. Coil Spec.

    • Winding tools: Stocked in the 20m lab. -> Delivered to Kamioka. Will do test winding on Wed and Thu next week (Takahashi).

    • Two of Ando lab. students will come to Kamioka to wind the coils from 2/8. Will work in PR3 clean booth.

Plan for the next week

  • Takahashi: Wed-Thu: Coil winding check, picomotor check, TF check.

Travel Plans

  • Travel (Week of 2/1)
    • Takahashi:Wed-Thu

    • Shoda:Mon-Wed

    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki: Fri
    • Hirata:
    • Ohishi:
  • Travel (Week of 2/8)
    • Takahashi: Mon-Wed
    • Shoda:Mon-Fri

    • Mark:
    • Fabian:
    • Okutomi:Mon-Fri

    • Fujii:Mon-Fri

    • Ishizaki:
    • Hirata:
    • Ohishi:

Other Mechanical Issues

  • BF Optimal Weight (Takahashi)
    • Inscription of the number on the BF #1 and BS BF. Installation of LVDT coils. Check the optimal load of BF #5 and #6.
      • #5: optimal weight 52.3kg consistent with the previous measurement
      • #6: optimal weight 53.2kg consistent with the previous measurement
    • Balast masses: Delivered to Mitaka. Will send them to Kamioka (Hirata)
  • IM wire clamps
    • Need to send the wire clamps used for the test hanging to I-ject: will send them to I-ject on Monday (Takahashi)
  • Wire winches
    • Shipped to Mitaka today. We need a coordination with Ikenoue-san for this work (Takahashi)

  • #Traverser actuation check (Shoda)
  • #PR CAD model and assembly drawings (Hirata)
    • Aso calculated the rotation angle
      • PR3: 0.786deg counter clockwise from the line connecting the centers of the PR3 and BS chambers.
      • Will make a report soon.
  • #Clean work procedure
    • Order clean wipes (Aso)
    • KAGRA should have a special meeting for clean requirements: Will propose another meeting. (Aso)
  • #Wire cleaning (Hirata)
    • Hirata will order 20m more wires. -> Delivered. Will wipe in the next week. -> Finished. Will send to Kamioka soon.

    • Will wash Tungsten wire delivery status -> Delivered. Will wipe in the next week -> Finished. Will send to Kamioka soon.

  • #Production of additional PR winches (Akutsu)
    • Shipping status (Takahashi, Hirata) -> Wrapped. Will be shipped with IP in the next week.

  • #OSEM assembly status (Akutsu)
  • #List of what should be changed for PR3 hanging
  • #Missing items(to be purchased soon)
    • #Traverser motor driver (Shoda) -> Will discuss Uraguchi-san. Need a box for stepping motor driver. -> These are for PR2. Will be ordered sometime.

Electronics

  • What are necessary in the next few weeks ?
    • Nothing
  • Electronics diagram and review
    • Mark will make overview diagrams of VIS electronics by the end of Jan.
    • Review of PR3 electronics early February-> 2/4 after the group meeting.

  • Watch dog system (Tanaka)
    • Test circuit was produced
    • Working on the prototype for mass production
    • Presentation at the next AEL meeting
  • #LVDT distributor connector problem
    • Miyakawa-san circulated a design of the conversion cable (D9-D15): drawing

  • #Digital System (Okutomi, Fujii)
  • #Cable status (Takahashi)
    • Need to send more PTFE cable to finish the remaining two -> Will do it in the next week

    • Need to send the cables used for the test hanging once it is finished. -> Will send them once the test hanging is disassembled.

  • #Cable check
    • Liu-kun Zhao-kun finished checking all the cables. They found another broken cable.
    • Will send the broken cables together with the other cable related items (Takahashi).

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi: Task list, team members
    • Type-B (BS and SRC): Leader = Mark: Task list, team members
    • Type-Bp modification: Continue discussion (Aso, Raffaele)

Common Issues

  • Wire breaker problem
    • Prism removal from PR2 (Hirose, Mark)
      • Not yet ready
  • #RM cleaning (Takahashi)
    • Which RMs are really clean ?-> 1st one and the 2nd one have different finish. So only the 1st one is dirty.

    • For the cleaning purpose, using a leutor seems enough

BS and SR

  • Task list (Mark): Present a list at the next VIS meeting. KAGRA/Subgroups/VIS/TypeB/TaskList

    • Kick off meeting within February (Mark)
  • BS prism preparation
    • Contacted the company LIGO used for the possibility of buying sapphire prisms (Mark)
    • They are happy to take an order. No Japanese agent. But international order can be taken.
    • Will ask for the lead time to the company (Mark) Drawing to be sent (LIGO drawing) -> Send the drawing to the companies immediately

  • Can we make SR wire breakers bigger ?
    • Asked Fuskushima-san about the possibility of widening the slits (Takahashi) -> It is possible but there is a risk of slight deformation.

    • We will try to widen the slit using the dirty RM used for the test hanging.
    • We need to decide on how much to widen. Check what happens if we use 5mm tall prism on CAD (Hirata) -> Result

      • Make the slit wider by 3mm will interfere with a M5 threaded hole
        • The hole is needed to keep the mechanical rigidity
        • Can make a new M5 hole somewhere near by ?
      • Check what happens if we widen the slit by 3.75mm and make a new M5 (Hirata)
        • Then we will talk to Fukushima-san again
      • If the design of the SR prisms can be the same as BS, it will be a good idea to order them at once.
        • Check if the BS prism can be used(Mark)
  • Flag design (Mark)
    • Some concerns
      • Flag is too tall ? (Raffaele)
      • Make the foot print smaller to reduce thermal noise ? (Aso)
    • Mark will sort out the ideas and organize a specialized meeting.

  • IP base clamp (Fabian): Picture -> Reduce the number of clamps

  • Bread board spring (Takahashi): Slides

  • New accelerometer tests for BS IP (Joris)
  • #BS Assembly Frame Design (Aso, Hirata)
  • #BS gluing jigs (Tatsumi)
  • #Not enough crane height problem (Hirata, Saito)
  • #BS clean bag (Aso)

Type A

  • Task list (Takahashi): Present at the next VIS meeting.
  • Fishing rod production status (Takahashi)
    • Ordered the material for the blades.
    • Stepping motors were ordered.
    • Mechanical parts remaining to be ordered (have drawings already)
  • #Type-A Filters Optimal Load Measurements
    • #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.

    • #How to manufacture the long maraging wires ?
      • One prototype was machined by Ojima
      • Aoshima can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation.

      • How to test it ?
        • We can use the prototype assembly frame in TAMA.

#Type-Bp modification

Other

  • Clean wear
  • Safety
    • No incident
  • #Work reports
    • Both on-site and off-site works should be reported in the KAGRA e-log.
    • A weekly summary entry should be posted before the weekly meeting: the entry should be an itemized list of things done with links to detailed e-log entries.
  • #Installation procedure document
    • Many people need to contribute to the document. However, we need one person responsible for the consistency of the document.
    • BS installation document: Mark will be the editor.
  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2015/2/5 (Fri) 13:00 -

The next F2F at Mitaka: 2/19

KAGRA/Subgroups/VIS/VISMinutes20160129 (last edited 2016-01-29 17:09:17 by YoichiAso)