VIS Meeting on 2016/1/29
2015/1/29 13:30 -
Kamioka TV conference room + SeeVogh
Participants:Takahashi, Fujii, Okutomi, Aso, Shoda, Hirata, Tanaka, Ishizaki, Mark, Fabian, Akutsu, Tatsumi, Joris
Schedule
- Schedule status (Aso)
- Cleaning of PRM and PR3 chamber from 2/1-2/3. PR2 and BS chambers from 2/4 - 2/6.
PR3
- PR3 Installation Status (Takahashi)
- An OSEM flag and a 2nd wire breaker came off. We had a special meeting on this.
- PR3 dusts: leave them until bKAGRA when we replace the 1st prisms (recommendation from Hirose).
#Traverser repair: Repair of the broken ones at Mitaka -> Uraguchi-san is working on it.
#Screws to fix the front and back rings the RM were too long, or the tapping in the holes were too short. Couldn't use M5x40. Ordered M5x35 with vent holes. -> Delivered. Remember to replace them
- PR3 flag and 2nd wire breaker repair status (Tatsumi)
- Flags and wire breakers will be brought back to Mitaka by Takahashi-san tonight
- Ishizaki-san will transport PR3 to Kamioka on Friday together with PRM
The frame for the clean bag is bent. Aso will contact Mirapro for a stronger frame.
Plan for the next week
- Mon: Chamber cleaning
- Tue: Chamber cleaning
- Wed: Chamber cleaning
- Thu:
- Fri:
PR2
- IOO wants the optical bench back (Aso)
- They were taken out. Handed to IOO.
#OpLev interference check (Akutsu)
Plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
iKAGRA ETM suspension
- Disassembly (and cleaning) of the suspensions (Ohishi)
- Everything was cleaned and shipped to Kamioka
- Assembly of the suspension
Damaged one vertical spring -> Replace with CLIO ones (all 4 of them to maintain the balance)
- Preparation of missing parts (Tatsumi, Takahashi)
- Connectors: Will use two D-SUB9, one for coils and another one for Pico-motors
Plates to fix the connectors on the suspension frame were ordered. -> Expected delivery date Feb. 4th.
- We have connector shells, pins and cables.
Coil bobin: Delivery date-> Feb. 4th.
- PRM transportation (Tatsumi)
- Thin plates to protect magnets arrived
Plastic container -> Delivery date 2/2(Kashiwa) 2/4 (Mitaka)
- Dummy mirror: To glue the magnets
- Coil winding (Takahashi)
Wires: will use the capton wires prepared for the LVDT coils. Coil Spec.
Winding tools: Stocked in the 20m lab. -> Delivered to Kamioka. Will do test winding on Wed and Thu next week (Takahashi).
- Two of Ando lab. students will come to Kamioka to wind the coils from 2/8. Will work in PR3 clean booth.
Plan for the next week
- Takahashi: Wed-Thu: Coil winding check, picomotor check, TF check.
Travel Plans
- Travel (Week of 2/1)
Takahashi:Wed-Thu
Shoda:Mon-Wed
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki: Fri
- Hirata:
- Ohishi:
- Travel (Week of 2/8)
- Takahashi: Mon-Wed
Shoda:Mon-Fri
- Mark:
- Fabian:
Okutomi:Mon-Fri
Fujii:Mon-Fri
- Ishizaki:
- Hirata:
- Ohishi:
Other Mechanical Issues
- BF Optimal Weight (Takahashi)
- Inscription of the number on the BF #1 and BS BF. Installation of LVDT coils. Check the optimal load of BF #5 and #6.
- #5: optimal weight 52.3kg consistent with the previous measurement
- #6: optimal weight 53.2kg consistent with the previous measurement
- Balast masses: Delivered to Mitaka. Will send them to Kamioka (Hirata)
- Inscription of the number on the BF #1 and BS BF. Installation of LVDT coils. Check the optimal load of BF #5 and #6.
- IM wire clamps
- Need to send the wire clamps used for the test hanging to I-ject: will send them to I-ject on Monday (Takahashi)
- Wire winches
Shipped to Mitaka today. We need a coordination with Ikenoue-san for this work (Takahashi)
- #Traverser actuation check (Shoda)
- #PR CAD model and assembly drawings (Hirata)
- Aso calculated the rotation angle
- PR3: 0.786deg counter clockwise from the line connecting the centers of the PR3 and BS chambers.
- Will make a report soon.
- Aso calculated the rotation angle
- #Clean work procedure
- Order clean wipes (Aso)
- KAGRA should have a special meeting for clean requirements: Will propose another meeting. (Aso)
- #Wire cleaning (Hirata)
Hirata will order 20m more wires. -> Delivered. Will wipe in the next week. -> Finished. Will send to Kamioka soon.
Will wash Tungsten wire delivery status -> Delivered. Will wipe in the next week -> Finished. Will send to Kamioka soon.
- #Production of additional PR winches (Akutsu)
Shipping status (Takahashi, Hirata) -> Wrapped. Will be shipped with IP in the next week.
- #OSEM assembly status (Akutsu)
- #List of what should be changed for PR3 hanging
- People should share ideas whenever they come up with missing thigns.
- Shoda made a spread sheet for keep tracking the ideas
https://docs.google.com/spreadsheets/d/1zZaLObWjDSEOTrr85Hz0ApXxEUChK3xJ_chk0f7r5nY/edit?usp=sharing
- All the items are now done or being taken care of
- #Missing items(to be purchased soon)
#Traverser motor driver (Shoda) -> Will discuss Uraguchi-san. Need a box for stepping motor driver. -> These are for PR2. Will be ordered sometime.
Electronics
- What are necessary in the next few weeks ?
- Nothing
- Electronics diagram and review
- Mark will make overview diagrams of VIS electronics by the end of Jan.
Review of PR3 electronics early February-> 2/4 after the group meeting.
- Watch dog system (Tanaka)
- Test circuit was produced
- Working on the prototype for mass production
- Presentation at the next AEL meeting
- #LVDT distributor connector problem
Miyakawa-san circulated a design of the conversion cable (D9-D15): drawing
- #Digital System (Okutomi, Fujii)
- #Cable status (Takahashi)
Need to send more PTFE cable to finish the remaining two -> Will do it in the next week
Need to send the cables used for the test hanging once it is finished. -> Will send them once the test hanging is disassembled.
- #Cable check
- Liu-kun Zhao-kun finished checking all the cables. They found another broken cable.
- Will send the broken cables together with the other cable related items (Takahashi).
bKAGRA preparation
- Three big categories of the tasks
- Type-A: Leader = Takahashi: Task list, team members
- Type-B (BS and SRC): Leader = Mark: Task list, team members
- Type-Bp modification: Continue discussion (Aso, Raffaele)
Common Issues
- Wire breaker problem
- Prism removal from PR2 (Hirose, Mark)
- Not yet ready
- Prism removal from PR2 (Hirose, Mark)
- #RM cleaning (Takahashi)
Which RMs are really clean ?-> 1st one and the 2nd one have different finish. So only the 1st one is dirty.
- For the cleaning purpose, using a leutor seems enough
BS and SR
Task list (Mark): Present a list at the next VIS meeting. KAGRA/Subgroups/VIS/TypeB/TaskList
- Kick off meeting within February (Mark)
- BS prism preparation
- Contacted the company LIGO used for the possibility of buying sapphire prisms (Mark)
- They are happy to take an order. No Japanese agent. But international order can be taken.
Will ask for the lead time to the company (Mark) Drawing to be sent (LIGO drawing) -> Send the drawing to the companies immediately
- Can we make SR wire breakers bigger ?
Asked Fuskushima-san about the possibility of widening the slits (Takahashi) -> It is possible but there is a risk of slight deformation.
- We will try to widen the slit using the dirty RM used for the test hanging.
We need to decide on how much to widen. Check what happens if we use 5mm tall prism on CAD (Hirata) -> Result
- Make the slit wider by 3mm will interfere with a M5 threaded hole
- The hole is needed to keep the mechanical rigidity
- Can make a new M5 hole somewhere near by ?
- Check what happens if we widen the slit by 3.75mm and make a new M5 (Hirata)
- Then we will talk to Fukushima-san again
- If the design of the SR prisms can be the same as BS, it will be a good idea to order them at once.
- Check if the BS prism can be used(Mark)
- Make the slit wider by 3mm will interfere with a M5 threaded hole
- Flag design (Mark)
- Some concerns
- Flag is too tall ? (Raffaele)
- Make the foot print smaller to reduce thermal noise ? (Aso)
Mark will sort out the ideas and organize a specialized meeting.
- Some concerns
IP base clamp (Fabian): Picture -> Reduce the number of clamps
Bread board spring (Takahashi): Slides
- New accelerometer tests for BS IP (Joris)
- #BS Assembly Frame Design (Aso, Hirata)
- #BS gluing jigs (Tatsumi)
- #Not enough crane height problem (Hirata, Saito)
- #BS clean bag (Aso)
Type A
- Task list (Takahashi): Present at the next VIS meeting.
- Fishing rod production status (Takahashi)
- Ordered the material for the blades.
- Stepping motors were ordered.
- Mechanical parts remaining to be ordered (have drawings already)
- #Type-A Filters Optimal Load Measurements
#Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.
- #How to manufacture the long maraging wires ?
- One prototype was machined by Ojima
Aoshima can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation.
- How to test it ?
- We can use the prototype assembly frame in TAMA.
#Type-Bp modification
Other
- Clean wear
- Clean inner wears are given to individuals. Wash them yourself.
http://www.guardner.co.jp/product/products/detail.php?product_id=143
- Safety
- No incident
- #Work reports
- Both on-site and off-site works should be reported in the KAGRA e-log.
- A weekly summary entry should be posted before the weekly meeting: the entry should be an itemized list of things done with links to detailed e-log entries.
- #Installation procedure document
- Many people need to contribute to the document. However, we need one person responsible for the consistency of the document.
- BS installation document: Mark will be the editor.
- #GAS blade inspection by Virgo (Takahashi)
- Shipped the blades. Will get results in 1-2 months.
Next meeting
2015/2/5 (Fri) 13:00 -
The next F2F at Mitaka: 2/19