Line 6: Line 6:
Participants: Participants:Akutsu, Takahashi, Ishizaki, Tanaka, Fabian, Mark, Shoda, Aso, Okutomi, Raffaele
Line 9: Line 9:
 * Schedule status (Aso)  * Schedule status (Aso) [[attachment:bKAGRA15summer-VIS-20151211.pdf|bKAGRA VIS]]
Line 13: Line 13:
 * Traverser and Stepper motor remote control (Shoda)   * Watchdog tripped. Will disable the watchdog (not yet done ?)
 * Traverser and Stepper motor remote control (Shoda) -> Not yet succeeded (TAMA prototype method cannot be used in KAGRA). Tested in Mitaka, and updated later.
  * Still trying to fix communication problem of the TCP/IP-Serial converter.
 * PR3 OpLev now use a collimator for a large beam to increase the range at the expense of noise. We may need to change it back to the original one if we want to reduce the noise. Probably not necessary for iKAGRA.
Line 16: Line 19:
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:
 * Mon:Operation of PR3 (Aso)
 * Tue: Operation of PR3 (Aso)
 * Wed: Operation of PR3 (Aso)
 * Thu: Operation of PR3 (Aso)
 * Fri: Operation of PR3 (Aso)
Line 24: Line 27:
  * Watchdog disabled
  * Changed the collimator of the OpLev to increase the range: now roughly +/-250urad
Line 54: Line 58:
  * Tested the prototype board with test input -> Worked fine
Line 55: Line 60:
 * Guradian script for PR3 (Shoda, Okutomi, Fujii) -> DONE(16/03/08)   * '''Put a document on the JGW-Doc '''

 * Guardian script for PR3 (Shoda, Okutomi, Fujii) -> DONE(16/03/08)
  * Watching the digital watchdog status. Recover the damping control if the watchdog is tripped.

  * http://klog.icrr.u-tokyo.ac.jp/osl/?r=950
Line 61: Line 71:
   * Type-Bp will be controlled by Shoda but the diagram update will be done by Mark
   * Type-A may be maintained by a new engineer. Will be discussed with the person later.
  * We need to count electronics and cables needed for the tests, such as temporary sensors and so on.
Line 65: Line 78:
  * Type-A: Leader = Takahashi
  * Type-B (BS and SRC): Leader = Mark
  * Type-Bp modification: Leader = Shoda
  * Type-A: Leader = Takahashi, Okutomi, Ishizaki, a new engineer
  * Type-B (BS and SRC): Leader = Mark, Fabian, Hirata
  * Type-Bp modification: Leader = Shoda, Fujii, A new technician (?)
Line 75: Line 88:
  * Kick off meeting within February (Mark)
Line 78: Line 90:
   * '''Takahashi will call the compnay to have a meeting '''
   * '''Aso will check with Ohashi-san about the budget '''
   * We will use the Sapphire prisms for the test hanging too
   * '''Takahashi will call the company to have a meeting '''
   * Aso will check with Ohashi-san about the budget -> we can place an order now.
   * We will use the sapphire prisms for the test hanging too
   *
Since we need to go forward on the BS and we can't make a decision on SR, we decided to go with tall 6.28 mm prisms, which saves adjusting other parts.
Line 83: Line 95:
  * We will ask ATC to widen one RM first.
  * Brought back one RM to Mitaka
   * It will take more than 1 month to machine (Fukushima-san)
   * Iwashita-san is preparing some tools for the machining. May take more than one month.
 * Flag design (Mark)
  * Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016
 * Flag design
Line 89: Line 98:
  * Could make BS optic flag shorter by about 4 mm ("BS Optic Flag Concept 3 (Small Magnet, Short)") but it would cause work for Tatsumi-san for little benefit.
  * Recommend "BS Optic Flag Concept 2 (Small Magnet)"
  * '''Will make a smaller foot print flag design (Mark) '''
  * Fabian did rigid IM flag design ("TBD")
   * Mark would like to make a test flag with magnetic attachment.
   * Use a key to determine the rotation angle of the flag
  * Optic flag design
   * Mark made a medium footprint flag design "BS Optic Flag Concept 4 (Small Magnet, Small Hole).pdf".
  * IM Flag design
   * Fabian improved rigid IM flag design ("BS_IM_flag_Concept_Screwed2.pdf")
   * Mark would (still) like to make a test flag with magnetic attachment.
   * Mark designed a tool for aligning the magnetically self-assembling IM flag design (drawing to be posted, hopefully before meeting).
Line 96: Line 105:
  * Discussed a possibility to remove the sensing function from the mirror OSEM.
   * Chop off the flag part from the magnet holder
    * Safer (less possibility of flag damage)
    * Wider range
   * OpLev with two QPD sensors may be used instead to sense the longitudinal motion (Virgo is doing this)
   * Question is whether the sensing noise is good enough or not
   * Raffaele will look for documents/data in Virgo
   * Akutsu will consider if this option is possible in KAGRA OpLev
Line 97: Line 114:
  * http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4811
  *
The above design seems fine.
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4811|T1604811]]
Line 100: Line 116:
 * IP base clamp (Fabian): Ordered
 * Bread board spring (Takahashi): Got a quotation, but expensive. Looking for other companies.
 * Issues with lower optical bench and damper ring.
  * Last week's problem solved: support blocks on damper ring can be moved circumferentially to match support blocks on lower optical bench.
  * New problem: damper ring needs to have central hole enlarged to allow passage of suspension during installation.
   * Asking Mirapro to make a modification(Takahashi)
  * New problem: nail-head parts are too short to hook in support blocks - need to be remade longer (and rods shortened to match).
   * Will make a design change.(Takahashi)
 * BS secondary prisms (no action)
 * EQ stop screws, extensions and lock nuts - designed, drawn; will order in new financial year (April)
 * Lower breadboard stuff
  * Breadboard spring bases and associated cable clamps: in manufacture
  * Breadboard springs: in manufacture
  * Damper ring needs to have central hole enlarged to allow passage of suspension during installation.
   * Mirapro contacted - will remove rings from clean booth ≈3/12, inspect and quote.
  * Nail-head parts too short
   * Hirata-san has adjusted design and made new drawings.
 * Extension springs for IM pico motors: need to do new drawing from Promec, have made
Line 111: Line 129:
   * Mark did initial mass budget ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4966|E1604966]]) and wrote up some specs for load gauge adapter.
Line 112: Line 131:
  * With check the structural strength
  * Will talk with Mirapro ('''contact Nakamura-san : Hirata''')
  * '''Take photos of the BS area to see where is the optimal location of the assembly frame (Aso) '''
 * Making assembly drawings for BS (Hirata)
  * Need to check the structural strength, did mass budget (see above)
  * Hirata-san contacted Mirapro: they will suggest a date after the iKAGRA vacuum work is done this week.
 * 2D and 3D CAD
  * Hirata-san worked on IM assembly drawing for BS
  * BS 3D Assembly
   * Hirata-san made much more up-to-date version of BS in chamber.
    * Has cable clamps, lower breadboard stuff.
    * Needs updates for BF and SF blade spring configuration.
 * '''BS team need to trip to the site in the first week of April for checking the installation procedure'''. Having a draft procedure document ready before this is important.
Line 124: Line 148:
 * '''Organize a kick-off meeting in the later half of March, concentrating on the room temperature part. (Takahashi) '''  * Organize a kick-off meeting in the later half of March, concentrating on the room temperature part. (Takahashi) -> '''Plese reply to the Doodle request. '''
Line 126: Line 150:
  * Will start the test in the TAMA west end room using the dummy loads we have.
  * Check the drift of the length
 * Simultion: Okutomi will work with Fujii
  * Will have a draft simulation results by the Type-A kick-off meeting.
Line 136: Line 164:
 
Line 148: Line 175:
 * Modification for bKAGRA
  * [[KAGRA/Subgroups/VIS/TypeBp|wiki]]
   * Uraguchi-san proposed us the new IP plan
   * Shoda updated the proposal(concerns?) for the BF active damping plan
  * Will have a brainstorming after the JSPS meeting
  * Review in April
Line 150: Line 184:
  * Using Bel wires for the safety of working on the 2F may be good
   * '''Ishizaki will check if there is clean compatible ones<<BR>>'''
  * A student hit his head on the edge of an OpLev table at the end station. Always wear a helmet.
Line 157: Line 190:
2016/3/11 (Fri) 13:30 - 2016/3/18 (Fri) 13:30 -

VIS Meeting on 2016/3/11

2016/3/11 13:00 -

Kamioka NAOJ Room & SeeVogh

Participants:Akutsu, Takahashi, Ishizaki, Tanaka, Fabian, Mark, Shoda, Aso, Okutomi, Raffaele

Schedule

PR3

  • PR3 Operation Status (Fujii)
    • Watchdog tripped. Will disable the watchdog (not yet done ?)
  • Traverser and Stepper motor remote control (Shoda) -> Not yet succeeded (TAMA prototype method cannot be used in KAGRA). Tested in Mitaka, and updated later.

    • Still trying to fix communication problem of the TCP/IP-Serial converter.
  • PR3 OpLev now use a collimator for a large beam to increase the range at the expense of noise. We may need to change it back to the original one if we want to reduce the noise. Probably not necessary for iKAGRA.

Plan for the next week

  • Mon:Operation of PR3 (Aso)

  • Tue: Operation of PR3 (Aso)
  • Wed: Operation of PR3 (Aso)
  • Thu: Operation of PR3 (Aso)
  • Fri: Operation of PR3 (Aso)

iKAGRA ETM suspension

  • Current status (Ohishi)
    • Watchdog disabled
    • Changed the collimator of the OpLev to increase the range: now roughly +/-250urad

Travel Plans

  • Travel (Week of 3/14)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:
  • Travel (Week of 3/21)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

Electronics

  • What are necessary in the next few weeks ?
    • Nothing
  • Watch dog system (Tanaka)
    • Tested the prototype board with test input -> Worked fine

    • Put a document on the JGW-Doc

  • Guardian script for PR3 (Shoda, Okutomi, Fujii) -> DONE(16/03/08)

  • Electronics diagram and review

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi, Okutomi, Ishizaki, a new engineer
    • Type-B (BS and SRC): Leader = Mark, Fabian, Hirata
    • Type-Bp modification: Leader = Shoda, Fujii, A new technician (?)

Common Issues

  • #OSEM assembly status (Akutsu)

Type-B

  • KAGRA/Subgroups/VIS/TypeB

  • Task list/schedule

  • BS prism preparation (Mark)
    • We decided to order 6 to Shinko-sha
      • Takahashi will call the company to have a meeting

      • Aso will check with Ohashi-san about the budget -> we can place an order now.

      • We will use the sapphire prisms for the test hanging too
      • Since we need to go forward on the BS and we can't make a decision on SR, we decided to go with tall 6.28 mm prisms, which saves adjusting other parts.
  • Can we make SR wire breakers bigger ?
    • Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016
  • Flag design
    • BS Flag Redesign on OneDrive

    • Optic flag design
      • Mark made a medium footprint flag design "BS Optic Flag Concept 4 (Small Magnet, Small Hole).pdf".
    • IM Flag design
      • Fabian improved rigid IM flag design ("BS_IM_flag_Concept_Screwed2.pdf")
      • Mark would (still) like to make a test flag with magnetic attachment.
      • Mark designed a tool for aligning the magnetically self-assembling IM flag design (drawing to be posted, hopefully before meeting).
    • Widen the OSEM opening (Akutsu)
    • Discussed a possibility to remove the sensing function from the mirror OSEM.
      • Chop off the flag part from the magnet holder
        • Safer (less possibility of flag damage)
        • Wider range
      • OpLev with two QPD sensors may be used instead to sense the longitudinal motion (Virgo is doing this)

      • Question is whether the sensing noise is good enough or not
      • Raffaele will look for documents/data in Virgo
      • Akutsu will consider if this option is possible in KAGRA OpLev

  • BS dummy optics design (Fabian)
    • T1604811

    • Hirata-san is waiting for quotes from three companies
  • BS secondary prisms (no action)
  • EQ stop screws, extensions and lock nuts - designed, drawn; will order in new financial year (April)
  • Lower breadboard stuff
    • Breadboard spring bases and associated cable clamps: in manufacture
    • Breadboard springs: in manufacture
    • Damper ring needs to have central hole enlarged to allow passage of suspension during installation.
      • Mirapro contacted - will remove rings from clean booth ≈3/12, inspect and quote.
    • Nail-head parts too short
      • Hirata-san has adjusted design and made new drawings.
  • Extension springs for IM pico motors: need to do new drawing from Promec, have made
  • BS Assembly Frame Design (Mark, Hirata)
    • Design is almost complete
    • Need to add some mechanism to hook a load gauge
      • Mark did initial mass budget (E1604966) and wrote up some specs for load gauge adapter.

    • Need to add some attachment points (e.g., ferromagnetic plates) for placing wind-shield panels.
    • Need to check the structural strength, did mass budget (see above)
    • Hirata-san contacted Mirapro: they will suggest a date after the iKAGRA vacuum work is done this week.
  • 2D and 3D CAD
    • Hirata-san worked on IM assembly drawing for BS
    • BS 3D Assembly
      • Hirata-san made much more up-to-date version of BS in chamber.
        • Has cable clamps, lower breadboard stuff.
        • Needs updates for BF and SF blade spring configuration.
  • BS team need to trip to the site in the first week of April for checking the installation procedure. Having a draft procedure document ready before this is important.

  • #BS gluing jigs (Tatsumi)
  • #Not enough crane height problem (Hirata, Saito)
  • #BS clean bag (Aso)

Type A

  • Task list (Takahashi)

  • Thinking about a possibility of testing the long filter chain using the prototype EQ stop in Kashiwa.
  • Organize a kick-off meeting in the later half of March, concentrating on the room temperature part. (Takahashi) -> Plese reply to the Doodle request.

  • Prototype long maraging rods (heat treated) were delivered from Aoyama
    • Will start the test in the TAMA west end room using the dummy loads we have.
    • Check the drift of the length
  • Simultion: Okutomi will work with Fujii
    • Will have a draft simulation results by the Type-A kick-off meeting.
  • #Type-A Filters Optimal Load Measurements
    • #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.

    • #How to manufacture the long maraging wires ?
      • One prototype was machined by Ojima
      • Aoyama can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation.

      • How to test it ?
        • We can use the prototype assembly frame in TAMA.

Type-Bp modification

  • Traverser motor driver (Shoda)
    • Need a box for stepping motor driver. Miyakawa-san is thinking about ordering chassis and boxes for motors. We discussed and agreed that the design of the boxes will be unified. The boxes will be designed and ordered together with those. (16/03/10)
    • Miyakawa-san wants to have a driver and a motor to test
  • PR2 Wire breaker problem
    • Prism removal from PR2 (Hirose, Mark)
      • Spare mirror is now back to Kashiwa
  • CLIO suspension
    • Ishizaki-san will come to pick it up
  • Modification for bKAGRA
    • wiki

      • Uraguchi-san proposed us the new IP plan
      • Shoda updated the proposal(concerns?) for the BF active damping plan
    • Will have a brainstorming after the JSPS meeting
    • Review in April

Other

  • Safety
    • A student hit his head on the edge of an OpLev table at the end station. Always wear a helmet.

  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2016/3/18 (Fri) 13:30 -

Next F2F 2016/4/1