Differences between revisions 9 and 10
Revision 9 as of 2016-03-18 13:21:22
Size: 9085
Editor: AyakaShoda
Comment:
Revision 10 as of 2016-03-18 13:29:03
Size: 8996
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 157: Line 157:
 * Organize a kick-off meeting in the later half of March, concentrating on the room temperature part. (Takahashi) -> '''Plese reply to the Doodle request. '''
 * Prototype long maraging rods (heat treated) were delivered from Aoyama
  * Will start the test in the TAMA west end room using the dummy loads we have.
  * Check the drift of the length
  * The prototype EQ stop will be transported from Kashiwa to Kamioka on 31th March.
 * The kick-off meeting will be held on 31th March.
 * The test of prototype long maraging rod was started. Detail is here: http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=1077

VIS Meeting on 2016/3/18

2016/3/18 13:30 -

Kamioka NAOJ Room & SeeVogh

Participants:

Schedule

  • Schedule status (Aso)

PR3

  • PR3 Operation Status (Aso)
    • DAC problem
    • Yaw picomotor does not work ?
  • Traverser and Stepper motor remote control (Shoda)

Plan for the next week

  • Mon:Operation of PR3 (Aso)

  • Tue: Operation of PR3 (Aso)
  • Wed: Operation of PR3 (Aso)
  • Thu: Operation of PR3 (Aso)
  • Fri: Operation of PR3 (Aso)

iKAGRA ETM suspension

  • Current status (Ohishi)

Travel Plans

  • Travel (Week of 3/21)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:22-24 (Shift)

    • Okutomi:
    • Fujii:24-27 (Shift)

    • Ishizaki:
    • Hirata:
    • Ohishi:
  • Travel (Week of 3/28)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

Electronics

  • What are necessary in the next few weeks ?
    • Nothing
  • Watch dog system (Tanaka)
    • Tested the prototype board with test input -> Worked fine

    • Put a document on the JGW-Doc

  • Guardian script for PR3 (Shoda, Okutomi, Fujii)
    • Burt restore implemented ?
  • Electronics diagram and review

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi, Okutomi, Ishizaki, a new engineer
    • Type-B (BS and SRC): Leader = Mark, Fabian, Hirata
    • Type-Bp modification: Leader = Shoda, Fujii, A new technician (?)

Common Issues

Type-B

  • KAGRA/Subgroups/VIS/TypeB

  • Task list/schedule

  • Quick summary, week to 3/18
    • Hirata-san made assembly drawings of IM and IMR. IM is almost finished. IMR is still on going.
    • Fabian designed the ballast masses for the payload.
    • Mark confirmed flag concept #4 was easy to make and made concept #5 with no flag tip.
    • Mark/Fabian worked on procedure docs
    • Mark surveyed BS clean booth area while at Kamioka (still need longer trip to discuss with site people).
    • Assorted quotes received.
  • BS prism preparation (Mark)
    • We decided to order 6 to Shinko-sha
      • Meeting with company set for 3/24 in Yokohama.
      • Aso will check with Ohashi-san about the budget -> we can place an order now.

      • We will use the sapphire prisms for the test hanging too
      • Since we need to go forward on the BS and we can't make a decision on SR, we decided to go with tall 6.28 mm prisms, which saves adjusting other parts.
  • Can we make SR wire breakers bigger ?
    • Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016
  • Flag design
    • BS Flag Redesign on OneDrive

    • Optic flag design
      • Hirata-san confirmed with ATC that "BS Optic Flag Concept 4 (Small Magnet, Small Hole).pdf" would be easy to make.
    • IM Flag design
      • Fabian improved rigid IM flag design ("BS_IM_flag_Concept_Screwed2.pdf")
      • Mark would (still) like to make a test flag with magnetic attachment.
      • Mark designed a tool for aligning the magnetically self-assembling IM flag design (drawing to be posted, hopefully before meeting).
    • Widen the OSEM opening (Akutsu)
    • Discussed a possibility to remove the sensing function from the mirror OSEM.
      • Chop off the flag part from the magnet holder
        • Safer (less possibility of flag damage)
        • Wider range
      • OpLev with two QPD sensors may be used instead to sense the longitudinal motion (Virgo is doing this)

      • Question is whether the sensing noise is good enough or not
      • Raffaele will look for documents/data in Virgo
      • Akutsu will consider if this option is possible in KAGRA OpLev

      • Mark made stub flag (no vane for sensor): "BS Optic Flag Concept 5 (Small Magnet, Stub).pdf"
      • Tatsumi-san is OK with both designs - just need to choose.
  • BS dummy optics design (Fabian)
    • T1604811

    • Hirata-san received one quote, is waiting on a second.
  • BS secondary prisms (no action)
  • EQ stop screws, extensions and lock nuts - designed, drawn; will order in new financial year (April)
  • Ballast masses for payload (new item) - Fabian designed Dropbox link

  • Lower breadboard stuff
    • Breadboard spring bases and associated cable clamps: in manufacture
    • Breadboard springs: in manufacture
    • Damper ring needs to have central hole enlarged to allow passage of suspension during installation.
      • Received quote from Mirapro. Rings were removed from KAGRA.
    • Nail-head parts too short
      • No progress since last week but Hirata-san will ask for quote from Mirapro.
  • Extension springs for IM pico motors: need to do new drawing from Promec, have made
  • BS Assembly Frame Design (Mark, Hirata)
    • Design is almost complete
    • Need to add some mechanism to hook a load gauge
    • Need to add some attachment points (e.g., ferromagnetic plates) for placing wind-shield panels.
    • Need to check the structural strength, did mass budget (see above)
    • Mirapro postponed setting a meeting date till after 3/25.
  • 2D and 3D CAD
    • Assembly drawings
      • Hirata-san worked on IM assembly drawing for BS - nearly finished.
      • IRM on-going.
    • BS 3D Assembly
      • Needs updates for BF and SF blade spring configuration.
  • Procedure documents
    • BS team need to visit the site in the first week of April for checking the installation procedure.

    • Mark worked on main assembly.
    • Fabian worked on payload assembly.
  • #BS gluing jigs (Tatsumi)
  • #Not enough crane height problem (Hirata, Saito)
  • #BS clean bag (Aso)

Type A

  • Task list (Takahashi)

  • Thinking about a possibility of testing the long filter chain using the prototype EQ stop in Kashiwa.
    • The prototype EQ stop will be transported from Kashiwa to Kamioka on 31th March.
  • The kick-off meeting will be held on 31th March.
  • The test of prototype long maraging rod was started. Detail is here: http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=1077

  • Simultion: Okutomi will work with Fujii
    • Will have a draft simulation results by the Type-A kick-off meeting.
  • #Type-A Filters Optimal Load Measurements
    • #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.

    • #How to manufacture the long maraging wires ?
      • One prototype was machined by Ojima
      • Aoyama can do the heat treatment for the long rod. Will ask them soon (Takahashi) -> Still waiting for a quotation.

      • How to test it ?
        • We can use the prototype assembly frame in TAMA.

Type-Bp modification

  • Traverser motor driver (Shoda)
    • Need a box for stepping motor driver. Miyakawa-san is thinking about ordering chassis and boxes for motors. We discussed and agreed that the design of the boxes will be unified. The boxes will be designed and ordered together with those. (16/03/10)
    • Miyakawa-san wants to have a driver and a motor to test
  • PR2 Wire breaker problem
    • Prism removal from PR2 (Hirose, Mark)
      • Spare mirror is now back to Kashiwa
  • CLIO suspension
    • Ishizaki-san will come to pick it up
  • Modification for bKAGRA
    • wiki

      • Uraguchi-san proposed us the new IP plan
      • Shoda updated the proposal(concerns?) for the BF active damping plan
    • Will have a brainstorming after the JSPS meeting
    • Review in April

Other

  • Safety
  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2016/3/25 (Fri) 13:30 -

Next F2F 2016/4/1

KAGRA/Subgroups/VIS/VISMinutes20160318 (last edited 2016-03-23 05:47:44 by YoichiAso)