Differences between revisions 10 and 14 (spanning 4 versions)
Revision 10 as of 2016-03-31 20:26:11
Size: 10842
Editor: AyakaShoda
Comment:
Revision 14 as of 2016-04-01 14:50:30
Size: 12875
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
Participants: Participants: Mark, Tanaka, Takahashi, Fabian, Shoda, Okutomi, Hirata, Fujii, Aso, Ishizaki
Line 10: Line 10:
 * Will have a schedule meeting with Ando-san on April 15th in Kamioka (Takahashi, Mark, Shoda will come)

== Site activities ==
Line 14: Line 16:
  *
Line 20: Line 23:
  * DGS wants to shut down the PR3 computer once, to fix the cablings
Line 24: Line 28:
   (information for the Type-Bp modification)    . (information for the Type-Bp modification)
   . Mounting method is a problem
   . If no available use OSEM as a tilt sensor
Line 28: Line 34:
=== Plan for the next week ===
 * Mon:
 * Tue:
 * Wed:
 * Thu:
 * Fri:
Line 39: Line 40:
== Site work plan for the next week ==
 * Mon:ETMY PZT work
 * Tue: ETMY work, PR3 work
 * Wed:PR3 work, Check the long maraging rod and EQ stop prototype (Type-A)
 * Thu:Remove the LVDT coils from the BS IP to fix them. Try to lower the IP resonant frequency by putting some weights
 * Fri:
Line 41: Line 49:
  * Takahashi:
  * Shoda:
  * Takahashi:6-7
  * Shoda:5-6
Line 44: Line 52:
  * Fabian:
  * Okutomi:6-7
  * Fujii:4-7
  * Ishizaki:7
  * Hirata:
  * Ohishi:

 * Travel (Week of 4/11)
  * Takahashi: 15
  * Shoda:15
  * Mark:15
Line 51: Line 70:
 * Travel (Week of 4/11)
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Ohishi:
Line 64: Line 72:
  * Nothing   * BIO for PR3
Line 67: Line 75:
 * Guardian script for PR3 (Shoda, Okutomi, Fujii)
 
* Will explain the progress at the AEL meeting

  * Can we nicely shut down the current
 * #
Guardian script for PR3 (Shoda, Okutomi, Fujii)
Line 84: Line 96:
 * Policy of the screw types to be used (Mark)  * Policy of the screw types to be used (Mark, Fabian) -> Will upload the document by Tuesday next week.
Line 87: Line 99:
  * '''Each leader must tell Akutsu-kun when and how many OSEMs they need by the next meeting.'''   * '''Each leader must tell Akutsu-kun when and how many OSEMs they need by the next meeting'''
Line 94: Line 106:
  * Takahashi-san met with Shinkosha and worked out a plan for prisms. .   * Mark wrote assembly frame requirements doc for Mirapro: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5037|E1605037]]
  * Mark did a bit of work on a document about the flag issue, but put it on hold: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5033|T1605033]]
  * Takahashi-san met with Shinkosha and worked out a plan for prisms.
Line 96: Line 110:
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3444| D1503444 Assembly intermediate and recoilmass BS]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3445| D1503445 Assembly intermediate recoilmass BS]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3446| D1503446 Recoil mass]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3444| D1605028 Assembly intermediate mass BS]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3444|D1503444 Assembly intermediate and recoilmass BS]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3445|D1503445 Assembly intermediate recoilmass BS]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3446|D1503446 Recoil mass]]
   * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3444|D1605028 Assembly intermediate mass BS]]
Line 102: Line 116:
  * Hirata-san worked to finalize drawings for BS clamp modifications. Now that the prism size is back to 5 mm we want to reinstate lowering the clamp surfaces by 1.28 mm. Some pins will need to be removed to allow this - IJECT is checking feasibility.
  * Fabian did analysis of RM wire thickness versus pitch mode frequency
 * BS prism preparation (Mark)
  * Hirata-san worked to finalize drawings for BS clamp modifications.
  * Fabian did analysis of RM wire thickness versus pitch mode frequency but ran into issues with SumCon, which it turns out does not always update all the downstream numbers that you might hope when changing wire diameters.
  * Fabian wrote up the policy on coating/venting of screws: [[|T16xxTBD]]
 * BS prism preparation
  * Takahashi-san and Hirose-san met with Shinkosha.
Line 107: Line 123:
  * Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016-> Any news on thi   * Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016 -> No update as of 4/1 morning - will ask.
Line 127: Line 143:
 * EQ stop screws, extensions and lock nuts - designed, drawn; will order in new financial year (April)  * EQ stop screws, extensions and lock nuts - ordered - promised for 4/22
 * BS Clamp Mods
  * Now that the prism size is back to 5 mm we would like to reinstate the plan of lowering the clamp surfaces by 1.28 mm. Some pins will need to be removed to allow this and later reinserted - Hirata-san sent the parts to IJECT for them to check feasibility. Even if they can't reduce the clamp surfaces we will have them fix the screw holes (M4 fine->M5 regular).
Line 130: Line 148:
  * Drawing check by Mark, not yet ordered.   * Drawings were checked by Mark, not yet ordered.
Line 132: Line 150:
  * Breadboard spring bases and associated cable clamps: in manufacture   * Breadboard spring bases and associated cable clamps: in manufacture, expected 4/15
Line 134: Line 152:
  * Damper ring mods: in manufacture, expects 4/28   * Damper ring mods: in manufacture, expected 4/28
Line 143: Line 161:
  * Need to request rack for holding vacuum feedthroughs during testing.    * Need to request rack for holding vacuum feedthroughs during testing.
Line 154: Line 172:
 * BS gluing jigs (Tatsumi)  * Mirror box (Tatsumi)
  * Mirror box exists but Tatsumi-san has a list of modifications he'd like to make.
  * Need to get clarity on secondary prism size - 5 mm or 1.28.
  * Mirror box base will need holes to interface to hanging frame trolley. Tatsumi-san has agreed to do the mirror box trolley plate so that it will match the mirror box base plate. Hirata-san will design the rest of the hanging system and ask Mirapro to make it along with the assembly frame.
Line 181: Line 202:
   * Will give them to MIyakawa-san when Shoda-san come to Kamioka for the shifts 
    -> Done (3/28)
   * Will give them to MIyakawa-san when Shoda-san come to Kamioka for the shifts
    . -> Done (3/28)
Line 202: Line 223:
   * Check the mass of the bottom plate and the cap of the standard filter -> Send Uraguchi-san (Shoda) 
    -> Done (3/31)
   * Check the mass of the bottom plate and the cap of the standard filter -> Send Uraguchi-san (Shoda)
    . -> Done (3/31)
Line 206: Line 227:
   * Check the capability to modify the BF cap (Shoda) 
    '''We want the correct CAD model for the original Type-Bp'''
   * Check the capability to modify the BF cap (Shoda)
    . '''We want the correct CAD model for the original Type-Bp'''

VIS Meeting on 2016/4/1

2016/4/1 13:30 -

Room 210 & eZuce

Participants: Mark, Tanaka, Takahashi, Fabian, Shoda, Okutomi, Hirata, Fujii, Aso, Ishizaki

Schedule

  • Schedule status (Aso)
  • Will have a schedule meeting with Ando-san on April 15th in Kamioka (Takahashi, Mark, Shoda will come)

Site activities

PR3

  • PR3 Operation Status (Aso)
    • The fuse of the k1pr0 machine has been tripped.
    • Guardian script is updated (Shoda)
      • saving safe snapshot automatically.
      • The pre-tripped state is added in order to protect from the sudden shut down of the outputs. If PR3 enters the pre-tripped state, it turn off the outputs gradually.
  • Traverser and Stepper motor remote control (Shoda): Not applied yet.
  • April commissioning break plan (Shoda)
    • Offload LVDT using the stepping motor
    • DGS wants to shut down the PR3 computer once, to fix the cablings
    • Add BIO in order to reset analog WD in the LVDT coil driver
      • Add the BIO board
      • Modify the realtime model
    • Put the tilt meter (which is borrowed from Araya-san) in order to check the tilt of the inner frame during the evacuation.
      • (information for the Type-Bp modification)
      • Mounting method is a problem
      • If no available use OSEM as a tilt sensor
    • If possible: LVDT sensitivity optimization
    • If possible: remote control system for motors

iKAGRA ETM suspension

  • Current status (Ohishi)
  • PZT activation at EY (Ohishi)

Site work plan for the next week

  • Mon:ETMY PZT work

  • Tue: ETMY work, PR3 work
  • Wed:PR3 work, Check the long maraging rod and EQ stop prototype (Type-A)

  • Thu:Remove the LVDT coils from the BS IP to fix them. Try to lower the IP resonant frequency by putting some weights

  • Fri:

Travel Plans

  • Travel (Week of 4/4)
    • Takahashi:6-7

    • Shoda:5-6

    • Mark:
    • Fabian:
    • Okutomi:6-7

    • Fujii:4-7

    • Ishizaki:7

    • Hirata:
    • Ohishi:
  • Travel (Week of 4/11)
    • Takahashi: 15
    • Shoda:15

    • Mark:15

    • Fabian:
    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:
    • Ohishi:

Electronics

  • What are necessary in the next few weeks ?
    • BIO for PR3
  • Watch dog system (Tanaka)
    • Will explain the progress at the AEL meeting
    • Can we nicely shut down the current
  • #Guardian script for PR3 (Shoda, Okutomi, Fujii)
  • #Electronics diagram and review

bKAGRA preparation

  • Three big categories of the tasks
    • Type-A: Leader = Takahashi, Okutomi, Ishizaki, a new engineer
    • Type-B (BS and SRC): Leader = Mark, Fabian, Hirata
    • Type-Bp modification: Leader = Shoda, Fujii, A new technician (?)

Common Issues

  • Policy of the screw types to be used (Mark, Fabian) -> Will upload the document by Tuesday next week.

  • OSEM assembly (Akutsu)
    • Schedule for each suspension is necessary
    • Each leader must tell Akutsu-kun when and how many OSEMs they need by the next meeting

Type-B

  • KAGRA/Subgroups/VIS/TypeB

  • Task list/schedule

  • Past Week Summary
    • Mark worked on schedule and task list(see above) - aiming to start suspending around 5/22.
    • Mark wrote assembly frame requirements doc for Mirapro: E1605037

    • Mark did a bit of work on a document about the flag issue, but put it on hold: T1605033

    • Takahashi-san met with Shinkosha and worked out a plan for prisms.
    • Hirata-san released assembly drawings for checking:
    • Hirata-san also did drawings for two types of BS optic flags (regular and stub) and IM flags (rigid and magnetic) (D1503487, D1605087, D1605088, ?? - not yet posted)
    • Mark checked the above for completeness and screw info - a handful of errors will be corrected.
    • Hirata-san worked to finalize drawings for BS clamp modifications.
    • Fabian did analysis of RM wire thickness versus pitch mode frequency but ran into issues with SumCon, which it turns out does not always update all the downstream numbers that you might hope when changing wire diameters.

    • Fabian wrote up the policy on coating/venting of screws: [[|T16xxTBD]]
  • BS prism preparation
    • Takahashi-san and Hirose-san met with Shinkosha.
    • 6 prisms were ordered, to arrive just after Golden Week. Prisms will be polished and cut parallel to the correct axis for strength. Size will be 5 mm for compatibility with SR. Plan is to use for test hanging but have metal dummy prisms as a backup.
  • Can we make SR wire breakers bigger ?
    • Fukushima-san preparing test: 3/4/2016 + 1 month = ≈4/1/2016 -> No update as of 4/1 morning - will ask.

  • Flag design
    • BS Flag Redesign on OneDrive

    • Optic flag design
      • Drawings done - two types.
    • IM Flag design
      • Drawings done - two types.
    • Widen the OSEM opening (Akutsu)
    • A new local length sensing
      • Need to decide the strategy for BS: three choices
        • Use OSEMs as originally planned
        • Use OpLev, No OSEM flag

        • Use reflection type sensors, No OSEM flag
      • Decide later!
  • BS dummy optics design (Fabian)
  • BS dummy and secondary prisms
    • Dummy prisms will be 5 mm to match SR - need to adjust BS clamp blocks.
    • Mark trying to find out from Tatsumi-san what height of prism is assumed by current jig.
  • EQ stop screws, extensions and lock nuts - ordered - promised for 4/22
  • BS Clamp Mods
    • Now that the prism size is back to 5 mm we would like to reinstate the plan of lowering the clamp surfaces by 1.28 mm. Some pins will need to be removed to allow this and later reinserted - Hirata-san sent the parts to IJECT for them to check feasibility. Even if they can't reduce the clamp surfaces we will have them fix the screw holes (M4 fine->M5 regular).

  • Ballast masses for payload
    • Hirata-san created drawings DropBox link

    • Drawings were checked by Mark, not yet ordered.
  • Lower breadboard stuff
    • Breadboard spring bases and associated cable clamps: in manufacture, expected 4/15
    • Breadboard springs: in manufacture
    • Damper ring mods: in manufacture, expected 4/28
    • Nail-head parts: quote from Mirapro received, not yet ordered
  • BS Assembly Frame Design (Mark, Hirata)
    • Mark wrote requirements doc for Mirapro: E1605037

    • Meeting with Mirapro 4/1, 11 am at Mitaka.
    • Need to add some mechanism to hook a load gauge
    • Need to request some attachment points (e.g., ferromagnetic plates) for placing wind-shield panels.
    • Need to request work platforms for standing on.
    • Need to request rack for holding vacuum feedthroughs during testing.
    • Need to request frame to hold clean bag.
    • Need to check the structural strength.
    • Clean bag needs to be ordered soon. Mark will make a design. Aso will contact the company.
  • 2D and 3D CAD
    • Assembly drawings
      • Individual mass assemblies for payload all done.
    • BS 3D Assembly
      • Needs updates for BF and SF blade spring configuration.
  • Procedure documents
    • Fabian worked on payload assembly.
  • Mirror box (Tatsumi)
    • Mirror box exists but Tatsumi-san has a list of modifications he'd like to make.
    • Need to get clarity on secondary prism size - 5 mm or 1.28.
    • Mirror box base will need holes to interface to hanging frame trolley. Tatsumi-san has agreed to do the mirror box trolley plate so that it will match the mirror box base plate. Hirata-san will design the rest of the hanging system and ask Mirapro to make it along with the assembly frame.
  • Not enough crane height problem (Hirata, Saito)

Type A

  • Task list (Takahashi)

  • Thinking about a possibility of testing the long filter chain using the prototype EQ stop in Kashiwa.
    • The prototype EQ stop will be transported from Kashiwa to Kamioka on 31th March.
    • Pre-assembly of the EQ stop prototypr on 6-7 April.
    • Demonstration of installation procedure using prototype filters (SFx1 + BFx2) from May.
  • The kick-off meeting will be held on 31th March.
  • The test of prototype long maraging rod was started. Detail is here: http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=1185

    • Load dependence was measured using a laser position sensor. Extension of 2.84mm was observed for the load of 272.8kg. The extension is consistent with the calculation (2.75mm).
  • Please notice humidity keeping maraging steel to avoid cracking noise.
  • Simultion: Okutomi will work with Fujii
    • Will have a draft simulation results by the Type-A kick-off meeting.
      • Got simulation information from Fujii-kun and Cryo group.
      • Now able to run simulation code
      • Need to confirm parameters with the actually delivered ones (like the weight): Some parameters are not consistent between some data.
  • #Type-A Filters Optimal Load Measurements
    • #Takahashi will make a plan for the optimal load check and ask ATC.-> Check two filters per month from April 2016. -> Will be presented to the ATC steering committee.

Type-Bp modification

  • Traverser motor driver (Shoda)
    • Need a box for stepping motor driver. Miyakawa-san is thinking about ordering chassis and boxes for motors. We discussed and agreed that the design of the boxes will be unified. The boxes will be designed and ordered together with those. (16/03/10)
    • Miyakawa-san wants to have a driver and a motor to test
      • Will give them to MIyakawa-san when Shoda-san come to Kamioka for the shifts
        • -> Done (3/28)

        • Shoda is also asking Uraguchi-san to provide one more Traverser motor driver for the test.
  • #PR2 Wire breaker problem
    • Prism removal from PR2 (Hirose, Mark)
      • Spare mirror is now back to Kashiwa
  • #CLIO suspension
    • Ishizaki-san will come to pick it up
  • Modification for bKAGRA
    • wiki

      • Uraguchi-san proposed us the new IP plan
      • Shoda updated the proposal(concerns?) for the BF active damping plan
    • Will have a brainstorming after the JSPS meeting -> Done (3/23)

      • We also discussed with Uraguchi-san, and tell him our concerns raised in our brainstorming discussion. (3/25)

    • Action items for Type-Bp modification
      • Calculate the upper limit of the resonant fequency for IP (Fujii)
      • Check if we need the magnetic damper for the bottom filter (Fujii)
      • Check the mass of the bottom plate and the cap of the standard filter -> Send Uraguchi-san (Shoda)

        • -> Done (3/31)

      • Check structure analysis of the EQ stop for active damping on BF (Shoda)
      • Check the minimam weight we need for the BFRM in order to damp the resonance enough (Shoda)
      • Check the capability to modify the BF cap (Shoda)
        • We want the correct CAD model for the original Type-Bp

    • Review in April

Other

  • Safety
  • #GAS blade inspection by Virgo (Takahashi)
    • Shipped the blades. Will get results in 1-2 months.

Next meeting

2016/4/8 (Fri) 13:30 - F2F@Mitaka

KAGRA/Subgroups/VIS/VISMinutes20160401 (last edited 2016-04-08 17:28:49 by NobuyukiTanaka)