Differences between revisions 1 and 2
Revision 1 as of 2016-06-16 10:26:36
Size: 1591
Editor: YoichiAso
Comment:
Revision 2 as of 2016-06-16 10:30:05
Size: 1614
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
Line 14: Line 13:
Line 17: Line 15:
Line 20: Line 17:
Line 23: Line 19:
Line 25: Line 20:
 * Any issue this week ?
Line 29: Line 25:
 *   * How difficult it is to make mirror mounted payloads
Line 41: Line 37:
 * Travel (Week of 6/13)
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii:
  * Ishizaki:
  * Hirata:
  * Ohishi:
  * Sato:
Line 64: Line 49:
June 27-29: Fujii, Shoda  * Travel (Week of 6/27)
  * Takahashi:
  * Shoda:
  * Mark:
  * Fabian:
  * Okutomi:
  * Fujii: 27-29
  * Ishizaki:
  * Hirata:
  * Ohishi:
  * Sato:
Line 71: Line 66:
2016/6/17(Fri) 13:30 - 2016/6/24(Fri) 13:30 -
Line 73: Line 68:
Next VIS F2F 6/17

Next n
ext F2F 7/8
Next F2F 7/8

Minutes of the VIS Meeting on 2016/6/17

2016/6/17 13:30 - 15:00 @ Room 210

Participants:

Progress report

Schedule Chart (PDF,MPP)

Type-A (Takahashi)

  • Put a report here

Type-B (Mark)

  • Put a report here

Type-Bp (Shoda)

  • Put a report here

IMMT (Ohishi)

  • Put a report here

Watchdog system (Tanaka)

  • Put a report here

Safety

  • Any issue this week ?

Issues

  • BS flag/prism glueing problem (Mark)
  • LVDT for BF damping (Shoda, Raffaele)
  • Dummy payloads for Type-A (Takahashi)
    • How difficult it is to make mirror mounted payloads

Site work plan for the next week

  • Mon:
  • Tue:
  • Wed:
  • Thu:
  • Fri:

BS crane will not be available: 13th -14th of June

Travel Plans

  • Travel (Week of 6/20):
    • Takahashi:19-21 (Acceptance of SFs, check items, move things around and so on)

    • Shoda:
    • Mark:20-24 (preparation for BS installation)

    • Fabian:20-24 (preparation for BS installation)

    • Okutomi:
    • Fujii:
    • Ishizaki:
    • Hirata:20-24(not yet decided)

    • Ohishi:
  • Travel (Week of 6/27)
    • Takahashi:
    • Shoda:
    • Mark:
    • Fabian:
    • Okutomi:
    • Fujii: 27-29
    • Ishizaki:
    • Hirata:
    • Ohishi:
    • Sato:

July 4 - 8: Takahashi, Ishizaki, Sato (site check for the installation of Type-A)

Mark is away: July 8-20

Next meeting

2016/6/24(Fri) 13:30 -

Next F2F 7/8