Size: 1591
Comment:
|
Size: 2529
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
Line 14: | Line 13: |
Line 16: | Line 14: |
* Put a report here |
* Create a rough new LVDT model -> Saito-san found that they fit around the BF. * Assembly plan for Modified Type-Bp: [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5287|JGWdoc]] -> asked Saito-san to do more upgrade. * Upgrade points: some screw sizes were wrong. Move the security poles inside so that we can fix them from the top.etc... * I found that we cannot load on the BF than I expected before. * The model of the BF was updated recently. When we decided the plan BF, the model was wrong, which means that the mass was wrong. * The load on the SF GAS = Tha mass on the BF GAS: 53.5 kg + IRM: 9.0 kg + BF: 100.2 kg = 162.7 kg * The optimal load on the SF GAS is 164.3 kg (minimum for the SFs whose caps cannot be closed). * The weight of the actuator base is currently 1.9 kg (w/o coils and magnets). * I suggest to gain weight margin by reducing the moving masses on the cap. |
Line 20: | Line 25: |
Line 23: | Line 27: |
Line 25: | Line 28: |
* Any issue this week ? | |
Line 29: | Line 33: |
* | * How difficult it is to make mirror mounted payloads |
Line 41: | Line 45: |
* Travel (Week of 6/13) * Takahashi: * Shoda: * Mark: * Fabian: * Okutomi: * Fujii: * Ishizaki: * Hirata: * Ohishi: * Sato: |
|
Line 64: | Line 57: |
June 27-29: Fujii, Shoda | * Travel (Week of 6/27) * Takahashi: * Shoda: * Mark: * Fabian: * Okutomi: * Fujii: 27-29 * Ishizaki: * Hirata: * Ohishi: * Sato: |
Line 71: | Line 74: |
2016/6/17(Fri) 13:30 - | 2016/6/24(Fri) 13:30 - |
Line 73: | Line 76: |
Next VIS F2F 6/17 Next next F2F 7/8 |
Next F2F 7/8 |
Minutes of the VIS Meeting on 2016/6/17
2016/6/17 13:30 - 15:00 @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- Put a report here
Type-B (Mark)
- Put a report here
Type-Bp (Shoda)
Create a rough new LVDT model -> Saito-san found that they fit around the BF.
Assembly plan for Modified Type-Bp: JGWdoc -> asked Saito-san to do more upgrade.
- Upgrade points: some screw sizes were wrong. Move the security poles inside so that we can fix them from the top.etc...
- I found that we cannot load on the BF than I expected before.
- The model of the BF was updated recently. When we decided the plan BF, the model was wrong, which means that the mass was wrong.
- The load on the SF GAS = Tha mass on the BF GAS: 53.5 kg + IRM: 9.0 kg + BF: 100.2 kg = 162.7 kg
- The optimal load on the SF GAS is 164.3 kg (minimum for the SFs whose caps cannot be closed).
- The weight of the actuator base is currently 1.9 kg (w/o coils and magnets).
- I suggest to gain weight margin by reducing the moving masses on the cap.
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue this week ?
Issues
- BS flag/prism glueing problem (Mark)
- LVDT for BF damping (Shoda, Raffaele)
- Dummy payloads for Type-A (Takahashi)
- How difficult it is to make mirror mounted payloads
Site work plan for the next week
- Mon:
- Tue:
- Wed:
- Thu:
- Fri:
BS crane will not be available: 13th -14th of June
Travel Plans
- Travel (Week of 6/20):
Takahashi:19-21 (Acceptance of SFs, check items, move things around and so on)
- Shoda:
Mark:20-24 (preparation for BS installation)
Fabian:20-24 (preparation for BS installation)
- Okutomi:
- Fujii:
- Ishizaki:
Hirata:20-24(not yet decided)
- Ohishi:
- Travel (Week of 6/27)
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii: 27-29
- Ishizaki:
- Hirata:
- Ohishi:
- Sato:
July 4 - 8: Takahashi, Ishizaki, Sato (site check for the installation of Type-A)
Mark is away: July 8-20
Next meeting
2016/6/24(Fri) 13:30 -
Next F2F 7/8