Agenda/Minutes of the VIS Meeting on 2016/9/16
2016/9/16 13:30 - @ Room 210
Participants:
Progress report
Type-A (Takahashi)
- EQ stop, release sensor, dummy payload: Open bidding was on 13th. Meet with the company person on 16th.
- Bottom Filter: Assembly of BFs was started on 7th. Some of bearings washed previously were rusted.
- BF damper: Specification document will be prepaed with the drawings soon. Test of LVDT prototype is on going.
- Maraging wire: Asking new design around hed to ATC. Tensile test is in preparation.
- Foot hold: Considering the type used in ATC, which is ready made and folded.
Type B Past Week Summary
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- Put a report here
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Maraging and SUS rod issue follow up.
- Temperature sensors on the suspensions ?
Site work plan for the next week
- Mon:
- Tue: BS clean booth cross-bar cutting (Aso)
- Wed: BS clean booth cross-bar cutting (Aso)
- Thu:
- Fri:
Travel Plans
- Travel (Week of 9/19):
- Takahashi:
- Shoda:
- Mark:
- Fabian:
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 9/26):
- Takahashi:
- Shoda:
- Mark: 26- 30
- Fabian: 26- 30
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/9/30(Fri) 13:30 -